Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf
6 pages match
  1. Page 74 of 125Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 74 of 125 Docket No. 11-09-09 Page 70 By letter dated April 19, 2012, UI requested the Authority’s approval to start an enhanced tree trimming program and tree removal program (ETT) similar to CL&P’s ETT program. UI is ready to start its ETT in targeted trouble spots while it completes its evaluation of the full extent of the program in terms of overall timing and cost, and how best to proceed to address both mainline and sidetaps throughout UI’s service territory. UI believes that ETT can be done on neutral revenue requirements basis in the near term, so that its overall tree trimming costs are essentially unchanged from the company’s tree trimming revenue requirements approved in rates, provided the ETT costs are capitalized consistent with past regulatory approval of ETT. UI Letter to Kimberley Santopietro dated April 19, 2012; UI Brief, p.3. UI testified that the ETT program would be an expansion of the current trim program without the additional massive removal of trees that there is no industry standard for the program as it was developed by CL&P. Tr. 5/24/12, pp. 2922, 2924. By July 2012, UI is expected to have spent approximately $1 million of its $2 million annual O&M budget. Revenue requirements for the $1 million of O&M are the same as that of $6 to $7 million in capital expenditures. Tr. 5/24/12, p. 2924. The OCC claims that increasing tree clearances will affect tree health. Increasing the amount of tree clearance would likely result in some improvement in reliability year over year, but the impact on the system's performance under major or catastrophic storm conditions is less certain. The OCC also claims that there is a limit to the extent to which risks to the overhead distribution system posed by trees can reasonably or practically be reduced under such serious storm conditions, given that in major storms, entire trees or major sections of tall trees may fall. Goodfellow/Townsley PFT, p. 16. Spending more money for additional tree work that results in obtaining more line clearance and removing more trees is not a complete solution to the problems resulting from major and catastrophic storm conditions similar to or more severe than the 2011 Storms. Id. Accordingly, the OCC concluded that the EDCs should increase their emphasis on hazard trees. Id. Liberty noted that UI trims single-phase circuit portions every eight years. While there is also some reliability centered maintenance being conducted on these lines, the eight-year cycle allows for increased vegetation density that will cause storm outages. In addition, the hazard-tree removal budget has not had consistent funding in past years. The budgeted rate of $53 per mile allows the removal of only very high priority hazard trees. Id. Liberty recommends that UI institute a four-year full cycle trim program to reduce overhanging material and increase clearances and a more aggressive hazard tree removal program, that will improve both storm and non-storm reliability. Liberty Report p. 44. The OCC and the AG disagree with UI’s proposed ETT program and recommend that it be disallowed because of the unknown effect on future revenue requirements, its impact on the system and that this docket is not the appropriate proceeding to resolve revenue requirement issues. OCC Reply Brief, pp. 9 and 10; AG Reply Brief, pp. 6-8.
  2. Page 75 of 125Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 75 of 125 Docket No. 11-09-09 Page 71 The Authority agrees with the OCC that increasing clearances may lead to more hazardous trees and may not be necessary if the tree cycle is reduced. The EDCs should target a four-year tree cycle. In Docket No. 12-06-09, the Authority expects to establish tree trimming standards and evaluate a move to a four-year trim cycle, the effects of removal of hazard trees and the impact on ratepayers. The Authority also agrees with the OCC and the AG that changing revenue requirements must be addressed in a rate case, not during a storm investigation. Sufficient details of what is encompassed in the proposed ETT program have not been submitted for review by the Authority. The company has not completed its evaluation of its ETT program in terms of overall timing and cost, and how best to proceed to address both mainline and sidetaps. UI testimony indicates that there are no standards for the ETT program and that it does not include additional tree removal. The effect of the proposed ETT program for 2012 and beyond on revenue requirements is unknown. Additionally, revenue requirements should be addressed in a rate case proceeding as opposed to an investigation. For these reasons, the Authority will not approve UI’s proposed ETT program. UI can propose its ETT program again in its next rate case, but it must include specific details about the content of the program, the overall costs, benefits and effect on system reliability excluding and including major storms. UI may also consider proposing details of its ETT program in Docket No. 12-06-09. D. WIRELINE TELECOMMUNICATIONS COMPANIES 1. AT&T Connecticut Following both Tropical Storm Irene and the October Storm, AT&T activated two response centers: the Northeast Emergency Operations Center (NEOC) and its Local Response Center (LRC). These centers support Connecticut’s restoration efforts with teams dedicated to providing direction, coordination and overall management of the emergency operations in response to the storm. AT&T Response to Interrogatory TE-1. According to AT&T, the NEOC regional center’s purpose was to determine the efforts for restoring and provisioning service in the affected areas. The LRC, located in Meriden, has local subject matter experts who, working with the NEOC staff, coordinate the response and recovery efforts of the local personnel in response to local issues. AT&T Responses to Interrogatories TE-1 and TE-13. Both the NEOC and LRC center provide input into the AT&T Global Network Operations Center (GNOC), the commandand-control that monitors and proactively manages data and voice traffic flowing across AT&T’s domestic and global networks 24 hours per day, seven days per week. Id. The GNOC’s monitoring capability has enabled AT&T to begin pre-planning with local resources for the arrival of both storms well before they actually hit Connecticut. Id. a. Tropical Storm Irene Prior to Tropical Storm Irene, from August 24, 2011 to August 27, 2011, AT&T held discussions with CL&P and UI to establish a process to communicate and coordinate each company’s efforts. AT&T distributed the “Storm Irene Responder Access Letter to AT&T” and contacted employees for their presentation to safety and
  3. Page 76 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 76 of 125 Docket No. 11-09-09 Page 72 public officials. The letter was designed to facilitate movement throughout the state in the event of curfews or restrictions. AT&T Response to Interrogatory TE-1. During that timeframe, AT&T continued to communicate with all stakeholders and advised its employees in the potential storm strike areas to take necessary precautions to remain safe during the catastrophic event and to continue monitoring local news reports for weather advisories or changes in forecasts. Id., p. 4. From August 28, 2011 through September 5, 2011, AT&T participated in the daily Governor’s briefing, participated on the State Telecommunications Task Force (TTF) at the EOC to address restoration of service post-storm and continued to manage State storm restoration. AT&T worked with the utility power companies to assess where power was being restored so that restoration could be prioritized. Employees involved in restoration activities were reminded that safety was paramount. Equipment functionality continued to be assessed and in instances where required, was restored to operating condition. On September 5, 2012, AT&T’s Meriden LRC and NEOC were deactivated for Tropical Storm Irene. b. October Storm Prior to the October Storm, AT&T mailed letters to municipal officials to ensure that the municipalities were aware of the emergency contact information for their specific AT&T contacts. During the days preceding the storm, AT&T personnel initiated a review and inventory of materials it anticipated would be in high demand due to the impact of the storm. AT&T personnel verified the availability of supplies, including replacement poles, drop wire, cable and other hardware and ensured the fueling of all vehicles and generators, brought central office switching equipment to the designated staging areas, and developed and communicated its work force plan. From October 27, 2011 through October 28, 2011, AT&T participated in calls with the Governor’s storm team on storm preparation. AT&T External Affairs identified a point of contact within the local network organization to support requests for information. AT&T staffed its personnel at the State EOC on October 30, 2011. AT&T Response to Interrogatory TE1. From October 29, 2011 through November 3, 2011, AT&T worked with UI and CL&P to formulate plans to report to the EOC and it activated the LRC on a “virtual basis.”27 It had a liaison at CL&P’s EOC, who remained at that location for at least 12 hours each day until November 6, 2011. The Meriden LRC began operating on a 24 hours a day, 7 days per week schedule on a virtual basis with status calls held twice daily to share information with affected internal organizations. AT&T provided information to the state for the Governor’s briefing and to the TTF. A satellite cell on light truck (COLT) was dispatched to Bradley International Airport in Windsor Locks as requested by the Federal Emergency Management Agency (FEMA). Id. From November 1, 2011 through November 3, 2011, AT&T emailed each municipality reconfirming its availability during this emergency event. LRC status calls 27 AT&T personnel performed its emergency functions from its daily work locations instead of the physical Meriden location. AT&T Response to Interrogatory OCC-3.
  4. Page 77 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 77 of 125 Docket No. 11-09-09 Page 73 continued to occur twice daily. The State EOC staffing continued with periodic reports provided for the Governor’s briefing and to the TTF. AT&T continued to evaluate staffing plans. On November 4, 2011, AT&T was no longer required to staff the State EOC but it remained “on call.” AT&T’s virtual LRC ceased operation as it returned to business as usual mode. Id. c. Customer Communications The Authority sought to ascertain the effectiveness of certain customer communications through the course of the 2011 Storms. One of the areas that the Authority explored was customer call center operations and performance. AT&T provided to the Authority, statistics for its repair call centers. Presently, repair calls for Connecticut AT&T customers are handled by four call centers: Brecksville, Ohio, Hoffman Estates, Illinois, Houston, Texas, and North Hollywood, California. AT&T Responses to Interrogatories CSU-12 and CSU-43. AT&T’s repair call centers are normally available on a 24 hour a day, 7 days per week basis. This availability did not change during the course of Tropical Storm Irene or the October Storm. AT&T Responses to Interrogatories CSU-14 and CSU-43. The following is a sample of the repair call center performance metrics reported by AT&T during the two outage incidents: Date ASA28 ACR%29 Total Calls30 Date ASA ACR% Total Calls 8/27/11 110.7 4.7% 1,675 10/29/11 83.7 5.9% 3,040 8/28/11 48.5 3.3% 6,752 10/30/11 416.8 23.6% 8,235 8/29/11 270.8 15.2% 19,435 10/31/11 16.6 0.9% 8,281 8/30/11 42.2 2.2% 10,644 11/01/11 51.4 2.7% 6,574 8/31/11 24.5 1.3% 7,319 11/02/11 32.1 1.5% 6,845 9/01/11 8.7 0.5% 6,094 11/03/11 51.4 2.7% 6,575 9/02/11 38.5 1.6% 5,237 11/04/11 28.3 1.3% 5,827 9/03/11 68.8 2.0% 3,357 11/05/11 66.8 2.8% 4,046 9/04/11 727.4 32.1% 2,524 11/06/11 189.6 9.2% 3,215 9/05/11 4.5 0.8% 2,622 11/07/11 55.5 2.3% 7,124 Source: AT&T Responses to Interrogatories CSU-12 and CSU-43. During Tropical Storm Irene, staffing at AT&T’s repair centers averaged approximately 268 agents during the time period of August 27, 2011 through September 6, 2011. During the October Storm, staffing at AT&T’s repair centers averaged approximately 296 agents during the time period of October 29, 2011 through November 13, 2011. Id. AT&T indicated that its repair call center staff was not provided any material or instructions specific to addressing questions or complaints regarding outages during the two events. However, AT&T did instruct its agents to be especially empathetic and understanding to customers calling with service outages. AT&T Responses to Interrogatories CSU-17 and CSU-44. During times of high call 28 Average Speed of Answer, in seconds. 29 Abandoned Call Rate. 30 Includes live calls and calls answered by an automated Interactive Voice Response (IVR) unit.
  5. Page 78 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 78 of 125 Docket No. 11-09-09 Page 74 volumes, AT&T will monitor the incoming traffic, as well as the service level metrics such as the number of calls, average speed of answer and abandoned call rate. Tr. 3/19/12, pp. 212 and 213. If necessary, call volume can be shifted between company repair call centers. Tr. 3/19/12, pp. 91, 213 and 214. AT&T also maintains a website that includes a significant amount of information regarding storm and emergency preparedness. However, this webpage does not contain Connecticut-specific data regarding the number or location of outages nor information regarding restoration estimates. AT&T Response to Interrogatory CSU-15. With the exception of a few occasions, the Authority finds that incoming calls were answered in a reasonable and timely manner during the two outage events. However, responsiveness to incoming calls is not the entirety of customer communications during outage events such as Tropical Storm Irene and the October Storm. Providing customers with the most accurate and updated information on outages and restoration efforts are an additional component. In its Brief, the OCC questioned AT&T’s dissemination of outage information to its customers related to its ability to accurately estimate the number of customers experiencing outages. OCC Brief, p. 79. The OCC noted that AT&T relies on its wireline customers to call in when they are out of service to measure the number and location of out-of-service lines. AT&T Response to Interrogatory OCC-2. Further, when asked to provide data on the total number of wireline services that were out of service at any time during the day during the two outage events, AT&T stated that it did not have that information, as there is subscriber lag time in reporting a service outage. AT&T Response to Interrogatory OCC-265. The OCC maintained that AT&T’s use of the number of customers calling in outage reports is not a plausible method of estimating the number of outages. The OCC noted a disparity in the number of calls to AT&T’s repair call centers compared to the percentage of access line outages during peak times of the two outage events as further skepticism of AT&T’s methods. OCC Brief, pp. 79 and 80. The OCC contends that AT&T has the capability to develop a more accurate method of estimating the number of system outages through the utilization of its own equipment and infrastructure. The OCC questions the accuracy of AT&T’s methods in the event customers do not complete their call to the repair center, or are confused by automated voice response systems. The OCC recommended that AT&T be required to develop and report on an improved system to estimate outages based upon equipment and infrastructure failures. The OCC contends that by improving the method of estimating this information, AT&T would be able to access better information to assist in storm recovery. In addition, this improved method would allow AT&T to provide its customers and governmental officials the benefit of accurate information regarding outages and restoration. OCC Brief, pp. 80-83. AT&T does not maintain on its website any information for customers regarding outages and restoration estimates. The Authority agrees with the OCC and considers the dissemination of the most accurate outage and restoration information to AT&T customers to be vital during incidents such as the two outage events. Accordingly, AT&T will be ordered to investigate and develop a method of estimating outage information other than relying on customer calls to report an out of service situation.
  6. Page 79 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 79 of 125 Docket No. 11-09-09 Page 75 AT&T should also develop a method to make the outage and restoration information available to its customers. d. Municipal & Other Utility Company Communications During and after both outage events, AT&T maintained communications with state and municipal officials as well as providing trained staff at the State EO. AT&T Responses to Interrogatories TE-9 and TE-20R. The AT&T staff installed at the EOC worked on a 24 hours a day basis and were available to address any concerns raised by state, municipal or safety officials. Along with these measures, AT&T also established a Local Response Center (LRC) that was responsible for the overall network restoration efforts. Id. AT&T’s LRC, located in Meriden, serves as the designated emergency command and control site and is activated in response to a disaster or an extraordinary emergency event. When activated, the LRC can either be staffed virtually or physically depending on the type and severity of the event. When staffed virtually, AT&T employees perform their LRC functions in response to emergency events from their daily work locations. However, if conditions warrant, that coordination of storm response can be enhanced by having the AT&T staff working in the same location. In these instances, those staff members will be brought together at the LRC’s physical location. AT&T Response to Interrogatory OCC-3. One function of the LRC during the two outage events was to respond and follow-up on issues identified to AT&T staff at the State EOC. Along with these duties, AT&T staff also participated on the daily Governor’s conference calls with municipalities. AT&T Response to Interrogatory TE20R. When an AT&T External Affairs manager is assigned to a municipality, depending on the services provided, there may also be an account manager assigned. Tr. 3/19/12, p. 93. Typically, AT&T’s External Affairs managers are responsible for multiple towns as they serve geographic areas. For instance, an External Affairs manager might be assigned a large city and a number of smaller towns. Tr. 3/19/12, pp. 94 and 95. AT&T stated that at least on an annual basis, municipalities are provided with a copy of its emergency plan. On October 21, 2011, and in an effort to strengthen communications, AT&T issued a letter (October Letter) to all of the municipalities with the contact name of its designated AT&T External Affairs manager as well as key AT&T telephone numbers to call in the event of another major storm. AT&T Response to Interrogatory TE-9, Attachment A. According to AT&T, that letter was drafted in response to the experiences that it had encountered subsequent to Tropical Storm Irene. Tr. 3/19/12, pp. 95 and 96. The information contained within the October Letter issued to municipalities is very important to those municipalities. Accordingly, the Authority will order AT&T to provide, on an annual basis, a letter similar to the October Letter that updates and describes all of the important information and telephone numbers regarding its External Affairs manager and all storm or emergency related communications. During and after both outage events, AT&T also embedded liaisons at the electric distribution companies’ emergency operations centers. AT&T Responses to Interrogatories CSU-13 and TE-13. According to AT&T, this process of placing staff at
  7. Page 80 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 80 of 125 Docket No. 11-09-09 Page 76 the electric distribution companies’ emergency operations centers has been done in response to other storms or occasions prior to the two outage events. Further, AT&T states that this coordination between the companies has been very well received by all of the participants. Tr. 3/19/12, pp. 214 and 215. e. Communications with State Municipal Officials During and after both storms, AT&T communicated through its Connecticut’s State President to the Governor’s General Counsel and staff, Department of Environmental Protection Commissioner and PURA Chairman, to advise them of storm preparations and plans underway to facilitate restoration after the storm passed. AT&T’s personnel responsibilities included maintaining up-to-date contact lists, compiling damage information, providing guidance and coordination of service restoration activities, communicating status internally and externally and debriefing after each emergency to review actions taken and made recommendations for improvement. AT&T Responses to Interrogatories TE-9 and TE-20. During this time, AT&T also investigated and resolved any inquiries or concerns raised by officials that were provided to company personnel stationed at the State’s EOC. Beyond AT&T's presence at the State EOC, AT&T’s External Affairs team was assigned to each municipality to provide coverage during the storm event. Id. AT&T received feedback from municipalities, including the CCM regarding stormrelated communications. AT&T's External Affairs team sent a letter to all municipalities with the contact name of its designated AT&T External Affairs manager, as well as key AT&T telephone numbers to call when another major storm event impacts Connecticut. Because nearly 98 percent of AT&T's access lines did not experience a service outage, the majority of issues raised by state and local officials to AT&T were not specific to wireline service outages. Id. f. Communications with Electric Companies With respect to AT&T’s coordination with the electric companies, the designated AT&T liaisons were stationed at the CL&P and UI EOCs. AT&T liaison’s main role was to share information between the two companies to help facilitate restoration efforts and resolve any issues either company has with the other in coordinating work activities related to jointly owned poles. AT&T Responses to Interrogatories TE-1 and TE-13. According to AT&T, the liaison’s role supplements, but does not replace, normal work activities done by the schedulers or construction managers to report work completions or coordinate work activities between the companies. AT&T liaison’s role includes the following: (1) notify power company of AT&T’s critical facility priorities for power restoration (e.g., remote terminals, central offices, and command centers); (2) take requests for AT&T to restore telecommunications facilities at electric companies’ critical command center and field satellite locations; (3) serve as a Single Point for collection for AT&T pole/cable damage reported by power company or AT&T patrols; (4) report damages to the AT&T Construction Management Center bridge/personnel and to the power companies; (5) handle correspondence with the State and municipal officials to report critical AT&T work required to help open roads and make an area safe; (6) manage any AT&T issues regarding specific requirements for work coordination (e.g.,
  8. Page 81 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 81 of 125 Docket No. 11-09-09 Page 77 need for tree trimming or making an area safe before AT&T can do its work); and (7) serve as a single point of contact for any issue AT&T wants to raise with power companies or vice versa (e.g., the need for one company to help the other with pole sets in a particular area). Id. g. Tropical Storm Irene and October Storm Restoration AT&T indicated that the 2011 Storms were extraordinary statewide weather events due to the massive strength, slow movement and long duration of the tropical storm and the early arrival of snow with high winds during the snowstorm. The primary hindrances to service restoration included: the statewide nature of the storm; inland and coastal flooding; extensive tree damage causing damage to AT&T’s facilities and restricting travel; and massive and widespread commercial power outages. AT&T Responses to Interrogatories TE-1 and TE-13. AT&T jointly owns 799,702 poles with CL&P and UI in the State. AT&T is custodian of approximately 357,000 of the poles that it jointly-owns and is sole owner of an additional 17,011 poles. AT&T Response to Interrogatory OCC-334. Of these, AT&T replaced 598 utility poles as a result of Tropical Storm Irene and 811 utility poles as a result of the October Storm. AT&T Response to Interrogatory OCC-330. For both storms, AT&T coordinated and managed all restoration work activities for both inside/outside forces using AT&T’s workforce systems. Under the unique conditions created by Tropical Storm Irene, coordination between the Installation and Maintenance (I&M) and Construction and Engineering (C&E) crews and the Network Dispatch center, all monitored by the Meriden LRC, served to facilitate the restoration. The frequent and ongoing communication between managers responsible for I&M and C&E enabled real time identification of downed facilities, enabling a faster restoration to larger numbers of customers. In addition to receiving their work via existing dispatch systems, field personnel received direction from the LRC managers in cases where the need for an urgent restoration was identified. AT&T Responses to Interrogatories TE-1 and TE-9. h. Wireline Service Trouble Reported AT&T monitored out of service troubles by network regions (or turfs), each of which are comprised of multiple wire centers. The regions include Berkshire (Route 8 corridor from Shelton to Northwest region of the state), Bridgeport/Gateway (Stratford to Old Greenwich), New Haven (shoreline, Milford to Madison, inland, New Haven to Meriden), East (shoreline, Clinton to Pawcatuck, inland, Middletown to Putnam), and Capital (New Britain north to Enfield). The table below provides specific out of service (OOS) for plain old telephone service (POTS) by regions: Storm Berkshire Bridgeport Capitol East Gateway New Haven Total Irene October Storm 4,883 2,841 3,426 7,582 2,139 4,587 25,458 8,916 1,162 8,366 3,014 1,127 1,769 24,354
  9. Page 82 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 82 of 125 Docket No. 11-09-09 Page 78 AT&T Responses to Interrogatories TE-4 and TE-16. For Tropical Storm Irene, the OOS troubles reported, from August 27, 2011 through September 6, 2011, totaled 25,458. During that time, AT&T received 73 complaints associated with wireline services. Of the 73 complaints, 26 either mentioned the storm or could reasonably be construed as being storm-related based on the nature of the complaint (i.e., no dial tone). AT&T Response to Interrogatory CSU-6. For the October Storm, the OOS troubles, from October 29, 2011 through November 9, 2011, totaled 24,354. During that time, AT&T received approximately 80 complaints associated with wireline services. Of the 80 complaints, 56 either mentioned the storm or could reasonably be construed as being storm-related based on the nature of the complaint (e.g., no dial tone, downed telephone wires and appointment delays). AT&T Response to Interrogatory CSU-44. AT&T required its network staff to be available 24/7 and its technicians worked mandatory 12-hour days. AT&T estimates its Connecticut network storm-related overtime to exceed $4 million for Tropical Storm Irene and $3.5 million for the October Storm. Responses to Interrogatories TE-3 and TE-15. During the 2011 Storms, AT&T utilized approximately 1,600 Connecticut network employees in support of restoration efforts for its wireline services. AT&T's C&E is comprised of 742 employees which includes 108 AT&T line construction employees. AT&T’s I&M has 598 employees in Connecticut who worked on restoring individual service outages. Premise technicians were also utilized to perform drop wire restoral work. Finally, AT&T's network staffing also includes an additional 202 employees from its Global Network Field Organization who support other aspects of AT&T's wireline network such as its central offices. Id. For Tropical Storm Irene, there were 81 out of state AT&T technicians integrated with Connecticut crews to address the repair workload. For the October Storm, there were 119 AT&T C&E technicians from other AT&T states that assisted in the storm restoration. AT&T has access to over 100 outside contractors to assist in restoration. Id. i. Authority Analysis Both Tropical Storm Irene and the October Storm were extraordinary statewide storms. Both storms caused sustained commercial electric power which was the primary cause of communications outages. Telephone companies’ restorations were delayed due to high voltage electrical hazards that had to be cleared and made safe first by the electric companies. The Authority finds AT&T had appropriately operated its network under a state of emergency situation during and post Tropical Storm Irene and 31 the October Storm. Based on the AT&T 2010 Annual Report filed with the Authority, AT&T has 1.147 million access lines. During both storms, about 2% of AT&T’s access lines were affected during the peak of Tropical Storm Irene [(25,258/1,147,000) and the 31 On March 14, 2012, AT&T received the first certification of the Department of Homeland Security’s Voluntary Private Sector Preparedness Accreditation and Certification Program (PS-PrepTM). The PSPrep™ program enables private sector organizations to enhance their capabilities for planning, responding to, and recovering from natural disasters and other threats.
  10. Page 83 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 83 of 125 Docket No. 11-09-09 Page 79 October Storm (24,354/1,1147,000)]. The Authority finds OOS troubles for AT&T’s wireline service was minimal considering nearly 98% of its access lines were not affected by either storm. No AT&T central offices lost power during the storms and maintained service due to back-up generators. AT&T Response to Interrogatory TE-4. Regarding AT&T’s outside plant network, all of the remote terminals (RTs; used in wireline switch access network) and Video Remote Access Devices (VRADs; used in AT&T’s U-verse network) all had back-up batteries providing power for approximately 12-24 hours. After the storms, AT&T deployed generators to all RTs and VRADs. AT&T Responses to Interrogatories TE-25 and OCC-247. The Authority finds AT&T took additional measures to prepare for an extended commercial outage. In addition to the 240 portable generators already present in the state, during its pre-storm preparation efforts, AT&T positioned an additional 1,000 portable generators outside the storm area to be deployed after the storm had passed. After the storm, AT&T deployed generators to remote terminals and VRADs as needed to replace the lack of commercial power during the storm period. AT&T Responses to Interrogatories TE-24 and TE-25. AT&T also deployed tanker trucks and smaller vehicles that provided both unleaded gasoline and diesel fuel to refuel its generators and vehicles and to provide its own fuel to avoid commercially powered gas stations. These efforts were coordinated by a telephone bridge open 24/7 that allowed command personnel in the Meriden LRC to communicate the status of refueling to workers in the field at all times. AT&T Response to Interrogatory OCC-247. AT&T also doubled its inventory of utility poles, from 500 to 1,000, prior to Tropical Storm Irene. Prior to the arrival of the October Storm, AT&T had 700 poles in inventory and ordered an additional 500 poles after the storm’s arrival, which were delivered within one day. AT&T also ordered additional cable prior to the October Storm which was not needed. Tr. 03/19/12, pp. 249-251. 2. Verizon Verizon prepared its facilities, property, employees etc., in advance of a major storm to ensure a swift response upon the passing of the storm. On August 24, 2012, Verizon contacted its fuel vendor to arrange for topping off the backup generator fuel tanks for the central offices that serve Greenwich. In addition, the generators were tested to ensure that they were in good working order. Verizon Response to Interrogatory TE-1. Prior to Tropical Storm Irene, Verizon activated its EOC and declared a state of emergency on September 2, 2012. Verizon’s EOC established a daily conference call to ensure preparation plans were implemented, including topping off all vehicle fuel tanks, securing adequate drop wire, cables and poles and to finalize technician coverage plans. Id. The October Storm had very little effect on Verizon’s wireline service area in Greenwich, and the outside plant facilities sustained minimal damage. Verizon did not activate its EOC or declare a state of emergency following the October Storm. Verizon Responses to Interrogatories TE-13 and TE-19. a. Customer Communications

Text of EOE-383 Attachment 2.pdf

Extracted from the file · 182 pages · 461,233 characters

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026