Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf
6 pages match
  1. Page 81 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 81 of 125 Docket No. 11-09-09 Page 77 need for tree trimming or making an area safe before AT&T can do its work); and (7) serve as a single point of contact for any issue AT&T wants to raise with power companies or vice versa (e.g., the need for one company to help the other with pole sets in a particular area). Id. g. Tropical Storm Irene and October Storm Restoration AT&T indicated that the 2011 Storms were extraordinary statewide weather events due to the massive strength, slow movement and long duration of the tropical storm and the early arrival of snow with high winds during the snowstorm. The primary hindrances to service restoration included: the statewide nature of the storm; inland and coastal flooding; extensive tree damage causing damage to AT&T’s facilities and restricting travel; and massive and widespread commercial power outages. AT&T Responses to Interrogatories TE-1 and TE-13. AT&T jointly owns 799,702 poles with CL&P and UI in the State. AT&T is custodian of approximately 357,000 of the poles that it jointly-owns and is sole owner of an additional 17,011 poles. AT&T Response to Interrogatory OCC-334. Of these, AT&T replaced 598 utility poles as a result of Tropical Storm Irene and 811 utility poles as a result of the October Storm. AT&T Response to Interrogatory OCC-330. For both storms, AT&T coordinated and managed all restoration work activities for both inside/outside forces using AT&T’s workforce systems. Under the unique conditions created by Tropical Storm Irene, coordination between the Installation and Maintenance (I&M) and Construction and Engineering (C&E) crews and the Network Dispatch center, all monitored by the Meriden LRC, served to facilitate the restoration. The frequent and ongoing communication between managers responsible for I&M and C&E enabled real time identification of downed facilities, enabling a faster restoration to larger numbers of customers. In addition to receiving their work via existing dispatch systems, field personnel received direction from the LRC managers in cases where the need for an urgent restoration was identified. AT&T Responses to Interrogatories TE-1 and TE-9. h. Wireline Service Trouble Reported AT&T monitored out of service troubles by network regions (or turfs), each of which are comprised of multiple wire centers. The regions include Berkshire (Route 8 corridor from Shelton to Northwest region of the state), Bridgeport/Gateway (Stratford to Old Greenwich), New Haven (shoreline, Milford to Madison, inland, New Haven to Meriden), East (shoreline, Clinton to Pawcatuck, inland, Middletown to Putnam), and Capital (New Britain north to Enfield). The table below provides specific out of service (OOS) for plain old telephone service (POTS) by regions: Storm Berkshire Bridgeport Capitol East Gateway New Haven Total Irene October Storm 4,883 2,841 3,426 7,582 2,139 4,587 25,458 8,916 1,162 8,366 3,014 1,127 1,769 24,354
  2. Page 82 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 82 of 125 Docket No. 11-09-09 Page 78 AT&T Responses to Interrogatories TE-4 and TE-16. For Tropical Storm Irene, the OOS troubles reported, from August 27, 2011 through September 6, 2011, totaled 25,458. During that time, AT&T received 73 complaints associated with wireline services. Of the 73 complaints, 26 either mentioned the storm or could reasonably be construed as being storm-related based on the nature of the complaint (i.e., no dial tone). AT&T Response to Interrogatory CSU-6. For the October Storm, the OOS troubles, from October 29, 2011 through November 9, 2011, totaled 24,354. During that time, AT&T received approximately 80 complaints associated with wireline services. Of the 80 complaints, 56 either mentioned the storm or could reasonably be construed as being storm-related based on the nature of the complaint (e.g., no dial tone, downed telephone wires and appointment delays). AT&T Response to Interrogatory CSU-44. AT&T required its network staff to be available 24/7 and its technicians worked mandatory 12-hour days. AT&T estimates its Connecticut network storm-related overtime to exceed $4 million for Tropical Storm Irene and $3.5 million for the October Storm. Responses to Interrogatories TE-3 and TE-15. During the 2011 Storms, AT&T utilized approximately 1,600 Connecticut network employees in support of restoration efforts for its wireline services. AT&T's C&E is comprised of 742 employees which includes 108 AT&T line construction employees. AT&T’s I&M has 598 employees in Connecticut who worked on restoring individual service outages. Premise technicians were also utilized to perform drop wire restoral work. Finally, AT&T's network staffing also includes an additional 202 employees from its Global Network Field Organization who support other aspects of AT&T's wireline network such as its central offices. Id. For Tropical Storm Irene, there were 81 out of state AT&T technicians integrated with Connecticut crews to address the repair workload. For the October Storm, there were 119 AT&T C&E technicians from other AT&T states that assisted in the storm restoration. AT&T has access to over 100 outside contractors to assist in restoration. Id. i. Authority Analysis Both Tropical Storm Irene and the October Storm were extraordinary statewide storms. Both storms caused sustained commercial electric power which was the primary cause of communications outages. Telephone companies’ restorations were delayed due to high voltage electrical hazards that had to be cleared and made safe first by the electric companies. The Authority finds AT&T had appropriately operated its network under a state of emergency situation during and post Tropical Storm Irene and 31 the October Storm. Based on the AT&T 2010 Annual Report filed with the Authority, AT&T has 1.147 million access lines. During both storms, about 2% of AT&T’s access lines were affected during the peak of Tropical Storm Irene [(25,258/1,147,000) and the 31 On March 14, 2012, AT&T received the first certification of the Department of Homeland Security’s Voluntary Private Sector Preparedness Accreditation and Certification Program (PS-PrepTM). The PSPrep™ program enables private sector organizations to enhance their capabilities for planning, responding to, and recovering from natural disasters and other threats.
  3. Page 83 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 83 of 125 Docket No. 11-09-09 Page 79 October Storm (24,354/1,1147,000)]. The Authority finds OOS troubles for AT&T’s wireline service was minimal considering nearly 98% of its access lines were not affected by either storm. No AT&T central offices lost power during the storms and maintained service due to back-up generators. AT&T Response to Interrogatory TE-4. Regarding AT&T’s outside plant network, all of the remote terminals (RTs; used in wireline switch access network) and Video Remote Access Devices (VRADs; used in AT&T’s U-verse network) all had back-up batteries providing power for approximately 12-24 hours. After the storms, AT&T deployed generators to all RTs and VRADs. AT&T Responses to Interrogatories TE-25 and OCC-247. The Authority finds AT&T took additional measures to prepare for an extended commercial outage. In addition to the 240 portable generators already present in the state, during its pre-storm preparation efforts, AT&T positioned an additional 1,000 portable generators outside the storm area to be deployed after the storm had passed. After the storm, AT&T deployed generators to remote terminals and VRADs as needed to replace the lack of commercial power during the storm period. AT&T Responses to Interrogatories TE-24 and TE-25. AT&T also deployed tanker trucks and smaller vehicles that provided both unleaded gasoline and diesel fuel to refuel its generators and vehicles and to provide its own fuel to avoid commercially powered gas stations. These efforts were coordinated by a telephone bridge open 24/7 that allowed command personnel in the Meriden LRC to communicate the status of refueling to workers in the field at all times. AT&T Response to Interrogatory OCC-247. AT&T also doubled its inventory of utility poles, from 500 to 1,000, prior to Tropical Storm Irene. Prior to the arrival of the October Storm, AT&T had 700 poles in inventory and ordered an additional 500 poles after the storm’s arrival, which were delivered within one day. AT&T also ordered additional cable prior to the October Storm which was not needed. Tr. 03/19/12, pp. 249-251. 2. Verizon Verizon prepared its facilities, property, employees etc., in advance of a major storm to ensure a swift response upon the passing of the storm. On August 24, 2012, Verizon contacted its fuel vendor to arrange for topping off the backup generator fuel tanks for the central offices that serve Greenwich. In addition, the generators were tested to ensure that they were in good working order. Verizon Response to Interrogatory TE-1. Prior to Tropical Storm Irene, Verizon activated its EOC and declared a state of emergency on September 2, 2012. Verizon’s EOC established a daily conference call to ensure preparation plans were implemented, including topping off all vehicle fuel tanks, securing adequate drop wire, cables and poles and to finalize technician coverage plans. Id. The October Storm had very little effect on Verizon’s wireline service area in Greenwich, and the outside plant facilities sustained minimal damage. Verizon did not activate its EOC or declare a state of emergency following the October Storm. Verizon Responses to Interrogatories TE-13 and TE-19. a. Customer Communications
  4. Page 84 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 84 of 125 Docket No. 11-09-09 Page 80 Verizon stated that its service territory in Greenwich was minimally impacted by both storms, as compared to other parts of the State. Verizon Response to Interrogatory CSU-45. The number of complaints or inquiries received by Verizon supports this statement. During Tropical Storm Irene, Verizon received one business complaint and no inquiries. Verizon Response to Interrogatory CSU-16. During the October Storm, Verizon received no complaints or inquiries. Verizon Response to Interrogatory CSU-44. Verizon maintains four call centers outside of Connecticut that serve customers in its Greenwich service territory. These call centers are staffed on a 24 hours a day, 7 days a week basis. Verizon Responses to Interrogatories CSU-12 and CSU-43. During Tropical Storm Irene, Verizon staff at the call centers worked 12 hour shifts. During the October Storm, Verizon maximized its workforce by offering and scheduling overtime for each agent. Id. Verizon did not have need to open or establish any other call centers during either of the two outage events. Verizon Responses to Interrogatories CSU-13 and CSU-43. There is only one item that the Authority takes issue with regarding Verizon’s customer communications. Verizon stated that it does not have a web page for Connecticut-specific information on storms or outages. Verizon Response to Interrogatory CSU-15. While Verizon’s Greenwich service territory might have been minimally impacted during both storms, this might not be the case in the next storm or emergency event. During events such as Tropical Storm Irene or the October Storm, the dissemination of accurate information to utility customers is as equally important to the answering of customer calls and the acquisition of information from customers. Accordingly, Verizon will be ordered to create a webpage that contains storm and other emergency information for its customers in the Greenwich service territory. b. Municipal & Other Utility Company Communications During Tropical Storm Irene, a Verizon Government Affairs Manager was in daily contact with the Greenwich Town Administrator. Throughout these calls, the Verizon staff member would provide a status report on restoration efforts. During the October Storm, daily calls did not take place as the damage to the Verizon system in Greenwich was minimal. Verizon Response to Interrogatory CSU-45. Verizon stated that it also participated daily in the State Telecom Task Force calls to provide restoration updates to state officials. Id. Verizon also had a liaison process in place with its counterparts at CL&P to coordinate restoration activities and priorities. Verizon Response to Interrogatory CSU-46. The liaison process did not involve a Verizon employee at CL&P’s emergency operations center, but consisted of one-on-one communications between the Verizon and CL&P operations staff. Verizon states that through this process, it is capable of coordinating its restoration work as efficiently as possible. Tr. 3/19/12, pp. 104 and 105. c. Communications with State and Municipal Officials Verizon participated daily on the TTF calls to provide restoration updates to officials. A Verizon Governmental Affairs Manager also contacted the Authority and Greenwich Town Administrator daily and provided a status report on the Verizon
  5. Page 85 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 85 of 125 Docket No. 11-09-09 Page 81 restoration effort. Verizon Response to Interrogatory TE-9. Since Greenwich was minimally impacted by the storm as compared to other parts of the State, restoration efforts went well. Verizon did not receive any complaints from municipal officials regarding its communications during and after the storm. Id. d. Communications with Electric Companies Verizon was in daily contact with CL&P during Tropical Storm Irene to determine when and where it would be safe for Verizon crews to restore service. Verizon Response to Interrogatory TE-1. However, during the October Storm because damage in the Greenwich area was minimal, Verizon’s EOC was not activated and daily conference calls were not held. While there was an increase in trouble reports on the day following the October Storm, service restoration was not hindered and resource development was not constrained. Verizon Response to Interrogatory TE-13. e. Tropical Storm Irene and the October Storm Restorations Verizon indicated that the major factor in service restoration was the restoration of commercial power by the electric companies. Immediately after Tropical Storm Irene passed, 52% of Verizon’s service area was without power, with 85 roads totally closed and another 35 roads partially closed. Verizon’s ability to restore landline telephone service was delayed until hazardous conditions were removed. Verizon Response to Interrogatory TE-1. On September 2, 2012, after CL&P had cleared much of the Verizon service area of hazardous conditions, Verizon declared a state of emergency. Verizon Response to Interrogatory TE-7. In light of the minimal damage from the October Storm, service restoration was not hindered by any unique factors. Resource development was not constrained. Verizon Response to Interrogatory TE-13. f. Wireline Service Trouble Reported Verizon stated that despite the extensive power outage in its service area, its OOS trouble load after Tropical Storm Irene had not exceeded 316 customers (which occurred on August 31, 2012). For the October Storm, the trouble load had not exceeded 130 customers (which occurred on October 31, 2011). The table below provides specific Verizon OOS customers associated with each storm:
  6. Page 86 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 86 of 125 Docket No. 11-09-09 Page 82 Storm Irene & Out of Service Reported 8/27/11 76 8/28/11 107 8/29/11 193 8/30/11 273 8/31/11 316 9/1/11 218 9/2/11 222 9/3/11 220 9/4/11 216 9/5/11 159 9/6/11 156 Total 2,156 October Storm & Out of Service Reported 10/29/11 30 10/30/11 60 10/31/11 130 11/01/11 124 11/02/11 129 11/03/11 79 11/04/11 50 11/05/11 44 11/06/11 31 11/07/11 40 11/08/11 32 11/09/11 27 Total 776 Verizon Responses to Interrogatories TE-4 and TE-16. g. Authority Analysis The Authority finds that Verizon appropriately operated its network under a state of emergency situation. According to the Verizon’s 2010 Annual Report, Verizon has 22,046 access lines. There were approximately 9% of Verizon’s access lines affected (2,156/22,046) during Tropical Storm Irene and approximately 3.5% (776/22,046) access lines affected following the October Storm. Based on the number of Verizon customers in Connecticut, POTS wireline service affected by both storms was minimal. Neither of its two central offices serving its Connecticut service area lost commercial nor back-up power. Verizon Response to Interrogatory OCC-337. Verizon deployed backup generators to a small number of remote terminals that lost commercial power during the storm. Verizon Response to Interrogatory OCC-267. 3. Post-Storms Review AT&T received feedback from municipalities, including the CCM, regarding poststorm communications with AT&T. In an effort to strengthen communications, AT&T's External Affairs team recently sent a letter to all municipalities with the contact name of its designated External Affairs manager as well as key AT&T telephone numbers. It has had several internal reviews at the departmental and LRC/EOC levels that are still ongoing with action items being addressed. AT&T’s post-storms review items that have been completed are: (1) expanding the use of existing databases by the LRC personnel to further assist in the prioritization of work; (2) creating in-state warehouse stocking of ready-to-eat meals (MREs) for easier transportation to technicians; and (3) enhance procedures, databases and practices to better utilize resources for generator deployment during periods of extended commercial power failure. AT&T Responses to Interrogatories TE-10 and TE21.
  7. Page 87 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 87 of 125 Docket No. 11-09-09 Page 83 Given the limited effect of the 2011 Storms on Verizon’s customer base, it has no specific plan to complete a post-storm review for Connecticut. However, Verizon indicated that in order to ensure the availability of adequate resources in Connecticut, it will continue shifting workforce from other service areas to meet demand for additional personnel in areas affected by significant storms or other unusual events. Verizon Response to Interrogatory TE-21. AT&T and Verizon will be required to update their emergency plans to include the above post-storms reviews in Docket No. 12-06-11. 4. Live Emergency Drills The OCC contends that AT&T and Verizon rely on table-top exercises rather than live emergency drills in Connecticut. AT&T conducts table-top exercises as part of its emergency planning, which are “a virtual exercise where a scenario is laid out at the beginning of the exercise … that’s walked through and learnings are discussed.” One of these table-top exercises was conducted by AT&T in 2011, but there is no company requirement for an annual table-top drill in Connecticut. AT&T did not perform a live, physical emergency storm drill involving the movement of equipment in Connecticut in 2010 or 2011. Verizon similarly relies on table-top exercises rather than physical drills, where tabletop exercises deal with “different areas in the northeast.” OCC Brief, p. 45. The OCC recommends that the Authority require AT&T and Verizon to develop and submit Connecticut-specific emergency plans containing, among other things, relevant Connecticut locations and listing Connecticut-based employees with their responsibilities and contact information. The OCC also recommends that the Authority direct AT&T and Verizon to develop emergency preparation exercises annually that are specific to Connecticut. OCC Brief, 46. AT&T and Verizon filed their national emergency preparedness plans in Docket No. 11-05-22 DPUC Review of Updated Emergency Plans. AT&T’s plan is a “national” plan, while Verizon’s plan is a “northeast area” plan. Neither of the companys’ plans have a section that is specific to Connecticut. The Authority finds the OCC’s recommendations have merit and will require AT&T and Verizon to develop emergency preparation exercises annually and report to the Authority, not later than January 1 of each year beginning January 1, 2013. AT&T and Verizon shall include these requirements in the companies’ updated emergency plans. 5. Service Outage Reporting The OCC also recommends that the Authority require AT&T to develop and include in its future reports better estimates of outages based on information regarding equipment and infrastructure failures, including RT failures. According to the OCC, AT&T knows of the RT failures but does not at this point use that information to develop better outage estimates. OCC Brief, p. 77. The Authority agrees. AT&T and Verizon currently report OOS troubles from calls made to each company’s repair centers by the affected customers. By tracking the number of outages caused by troubled RTs and other equipment failures, both AT&T and Verizon would be
  8. Page 88 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 88 of 125 Docket No. 11-09-09 Page 84 able to access, assess and better report information to manage its storm recovery 32 and/or any service outages. Thus, the Authority will require AT&T and Verizon to use and track such mechanisms in formulating the outage reports. The Communications Workers of America (CWA) commented that AT&T’s staffing cuts have adversely affected its outside plant maintenance, storm restoration and service quality performance. CCW requests that the Authority establish standards in this proceeding including a minimum staffing level requirement. Tr. 03/19/12, p. 22. The Authority has initiated Docket No. 12-06-10 PURA Establishment of Industry Performance Standards for Telecommunications Companies that is expected to establish standards for restoration of intrastate telecommunications services after any emergency. In the opinion of the Authority, the CWA’s concerns should be addressed in that proceeding.33 E. POLE INSPECTION Most utility poles in Connecticut are jointly owned between an EDC and a telephone company. Approximately half of all utility poles that support electric facilities are maintained by the EDCs; the others are maintained by AT&T and Verizon.34 AT&T and Verizon Responses to Interrogatory OCC-7; CL&P Response to Interrogatory AG22; UI Response to Interrogatory OCC-339. The EDCs have long had a pole maintenance process by which each pole is inspected and maintained on a regular basis. The EDCs report to the Authority on their pole maintenance practices annually in compliance with Conn. Gen. Stat. 16-32g.35 This statute only applies to maintenance practices of EDCs, not to those of AT&T or Verizon, for which there is no statutory maintenance reporting requirement. AT&T states that it currently inspects the utility poles that it owns on a 10-year inspection cycle. Prior to 2010, AT&T did not have a centralized, formalized pole inspection process that ensured poles were consistently inspected and maintained, and it did not have easy access to its own pole inspection data. Tr. 03/19/12, pp. 226-231. Verizon states that it does not inspect the utility poles on a formal cycle basis; however its employees are directed to inspect poles prior to climbing and performing any work 32 This mechanism should not be an administrative burden to the companies. The record indicated that AT&T’s RTs reported approximately 14,000 access lines were out of service during the peak of each storm. Late Filed Exhibit No. 11. 33 The Authority has already addressed AT&T’s service quality performance by its July 27, 2011 Decision in Docket No. 10-04-12RE01 DPUC Proceeding Pursuant to Section 16-41 of the General Statutes of Connecticut to Determine Whether The Southern New England Telephone Company d/b/a AT&T Connecticut Should be Fined for Failure to Comply with Quality of Service Standards for the Provision of Telecommunications Services - Settlement Agreement. 34 A small proportion of poles are solely owned by either an EDC or a telephone company. 35 The current pole maintenance practices are filed in Docket No. 11-12-13, PURA Review of Electric Companies' and Electric Distribution Companies' Plans for Maintenance of Transmission and Distribution Overhead and Underground Lines.
  9. Page 89 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 89 of 125 Docket No. 11-09-09 Page 85 and make observations while they are in the field. Tr. 03/20/12, pp. 326, 341. The vast majority of AT&T and Verizon custodial poles support electric distribution facilities. Failure to properly maintain poles that support electric facilities could endanger public safety as well as result in negative consequences to electric distribution system reliability. To ensure the integrity of equipment attached to the poles, the Authority requires assurances from AT&T and Verizon that, as long as they are responsible for maintaining utility poles, they should be reporting to the PURA their maintenance practices. Therefore, the Authority will order AT&T and Verizon to file their pole maintenance practices annually, as do the EDCs. The utility pole inspection plans shall include, but not be limited to, the inspection interval, number of poles inspected, replaced and associated trained personnel involved in the inspection and a detailed description of the inspection techniques that will be applied. F. POLE ADMINISTRATION The Authority investigated the appointment of a third-party pole administrator in this proceeding to determine if the current pole administration structure had a negative effect on the overall service restoration process. Specifically, the Authority investigated utility pole restoration issues and whether they could be improved with the appointment of a third-party statewide utility pole. Response to Motion No. 21. There were many recommendations from various partcipants to change or modify the structure of the current pole administration. The Authority finds that no evidence presented supports the notion that the current pole administration structure delayed the restoration of services during the 2011 Storms. The evidence indicates that the issue with utility pole administration is not restoration, but a claim that there is an unacceptable delay in allowing third parties to attach their facilities to utility poles and that the current pole attachment process has become inefficient. The Authority will require that the Pole Attachment Working Group (Working Group) reconvene under Docket No. 11-03-07, DPUC Investigation Into the Appointment of a Third Party Statewide Utility Telephone Pole Administrator for the State of Connecticut no later than September 1, 2012. The Working Group is hereby directed to submit a status report to the Authority on resolved and outstanding issues by November 15, 2012. The Authority will require the Working Group to develop and recommend to the Authority, no later than January 31, 2013, a consensus pole administration structure to facilitate utility pole attachments. The Working Group should begin its discussions with the proposals submitted in this proceeding by the OCC, CL&P, UI and Fiber Technologies. The above reports shall be submitted in Docket No. 11-03-07. G. WIRELESS SERVICE OUTAGES 1. Wireless Carriers’ 2011 Storm Experience Throughout this proceeding, the wireless carriers have argued that the Authority has no jurisdiction over the wireless industry relative to storm outages and service restoral. Indeed, they have continually referred the Authority to the Federal Communications Commission (FCC), citing their disaster reporting responsibilities
  10. Page 90 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 90 of 125 Docket No. 11-09-09 Page 86 pursuant to the FCC’s Disaster Information Reporting System (DIRS). Nevertheless, despite these arguments, the carriers responded to Authority staff and party data requests, providing the requested information either on the public record or pursuant to protective order. In reviewing these responses, the Authority finds that, in general, the delivery of the wireless carriers’ services immediately following the two storms was affected by two key issues: (1) the predominant loss of commercial power to the cell sites and (2) the loss of commercial power to the backhaul facilities between carrier cell sites and their respective switching centers. In a minimum number of cases, some site equipment was damaged that also affected the provision of service. AT&T Mobility Response to Interrogatory CMRS-16; Sprint Response to Interrogatory CMRS-16; T-Mobile Response to Interrogatory CMRS-16; and Verizon Wireless Response to Interrogatory CMRS-16. The wireless carriers also provided on the public record and pursuant to protective order, the measures that they have taken to address the service outages resulting from the 2011 Storms and the actions that they have taken to improve network reliability. For example, AT&T Mobility discussed its deployment of a self-optimizing technology, the actions it has taken to enhance battery performance, the addition of more back-up generators to critical cell sites and standardizing its generator electrical plugs. AT&T Mobility has also deployed fiber transport facilities to its cell towers to improve backhaul transport. Lastly, AT&T Mobility stated that it has incorporated the knowledge gained from the various disaster events across its footprint, and strives to improve efficiencies going forward, such as increasing the inventory of portable generators, and implementing improvements in the deployment and fueling and refueling of its generators. Tr. 3/21/12, pp. 478-480; Late Filed Exhibits No. 18 and 20. Sprint, through its Network Initiative, has deployed new technologies that provide for greater output power to its tower antennas. According to the Sprint witness, this is expected to increase its cell tower footprint producing greater overlap between its cell sites. Sprint has also begun to sunset its iDEN technology that will free up additional spectrum and provide for more efficient use of that spectrum. Sprint provided under protective order more specific details concerning its plans for spectrum efficiencies, battery improvements, reliability improvements, etc. and the deployment of fiber transport to cell sites to replace the T-1 facilities currently in place. Tr. 3/21/12, pp. 483486, 489-492; Late Filed Exhibits No. 19 and 22. The witness for T-Mobile testified that the company was looking to enhance its network by hardening site reliability through its network modernization projects. These enhancements are expected to provide for improved network optimization, increase coverage, and reliability. T-Mobile also described its “transport reliability hardening” project that uses a newer technology called ring topology for all its voice and data communications as well as to transition more network facilities from T-1 lines to Ethenet backhaul/fiber. The company is also replacing certain antennas with integrated radio. Tr. 3/23/12, pp. 546-551; Late Filed Exhibits No. 27 and 28. Verizon Wireless indicated that while it has no specific initiative to upgrade its network, it is constantly focusing on network redundancy relative to equipment or

Text of EOE-383 Attachment 2.pdf

Extracted from the file · 182 pages · 461,233 characters

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)