Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf
6 pages match
  1. Page 91 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 91 of 125 Docket No. 11-09-09 Page 87 design. The company witness also testified that it is building redundancy into its switching center equipment so that if a piece of equipment fails, there are others present to keep service up and running. Verizon Wireless also regularly checks its cell site batteries to make sure that they are at the proper charge so that they are fully functional. Lastly, Verizon Wireless is taking several steps to address the loss of back-haul facilities. For example, it is pursuing the installation of permanent back-up generators at all cell sites that are not currently so equipped (approximately 10%). It is also working to convert from a traditional “copper wire” to a fiber-based backhaul system. Additionally, where feasible and permitted by the local backhaul provider, the company is seeking to provide emergency back-up power to fiber electronic equipment locations. Finally, Verizon Wireless is expanding the number of vendors it uses to provide fiber backhaul services so that its network is robust and reliable. Verizon Wireless Response to Interrogatory CMRS-16; Tr. 3/21/12, pp. 492-495. 2. Wireless Carrier Service Outage Reporting Requirements During Declared State and Federal Emergencies The FCC and the Federal Department of Homeland Security (DHS) have concluded that common carrier network information, including such information maintained by wireless carriers, must presumptively be treated confidential by federal and state government entities to ensure that national homeland security efforts are not compromised by the release of confidential service provider network information to the public. T-Mobile Response to Interrogatory CMRS-1. According to T-Mobile, all information is collected and submitted into the FCC’s DIRS database, which was activated by the FCC prior to the 2011 Storms making landfall and the anticipated advancement along the Atlantic seaboard. Id. The DIRS database is a voluntary, webbased system that communications providers, including the wireless carriers, use to report communications infrastructure status and situational awareness information during incidents such as the 2011 Storms. T-Mobile states that the FCC shares its aggregated information from the DIRS database with other agencies to inform federal, state and local government of impacted communications services. Id. Immediately following Tropical Storm Irene and the October Winter Storm, during state service restoral efforts, the TTF was established and staffed by various state agencies and the telecommunications carriers as a means of expediting the restoral of service throughout the state. While activated, the carriers were required to report to the TTF, in most cases, twice daily on the status of their service restoral efforts. Wireless carrier information requested by the TTF included the total number of service outages affecting each company, an estimate of the total number of customers/access lines/wireless numbers without service as well as an update of each company’s latest restoral efforts. AT&T Response to Interrogatory OCC-34, Attachment A; AT&T Supplemental Response to OCC-34, Attachments C Parts 1 and 2, Attachment D. The Authority notes that pursuant to 47 CFR §4.2 Availability of Reports Filed Under this Part, this information is confidential. Thus, the Authority’s access to this information is not readily available and would also require a formal request to, and approval from the FCC in order to gain access to any of the carriers’ storm related data.
  2. Page 92 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 92 of 125 Docket No. 11-09-09 Page 88 Tr. 3/21/12, pp. 520 and 521. Clearly, during times of storm recovery when immediate access to this information by the Authority is imperative, receipt of this information by the PURA after following these FCC requirements would be difficult to obtain and most likely untimely. The Authority recognizes the importance and value of the DIRS. However, accessing the information through the DIRS during these types of events may not be timely and would require a formal process pursuant to federal regulations. See 47 CFR 0.461, Requests for Inspection of Materials Not Routinely Available for Public Inspection. To make access to this information more readily available during declared state and federal emergencies, the Authority convened a technical meeting with the wireless industry to discuss the best means to accomplish access to this data. May 18, 2012 Notice of Technical Meeting. Following that technical meeting, the industry filed its proposal (Wireless Proposal). See the Attachment to the June 13, 2012 Letter from David W. Bogan to Ms. Kimberley J. Santopietro. The purpose of the Wireless Proposal was to describe the collaborative efforts between certain wireless carriers and the Authority relating to the mutual sharing of information regarding situational awareness and operational status during times of crisis. Specifically, the wireless carriers have committed to provide the Authority with certain information regarding the operational status in the event of a state and federally declared emergency in Connecticut consistent with the FCC’s DIRS. According to the Wireless Proposal, the wireless carriers will provide the information on a daily basis, except when there is a material change in status, in which case the wireless carriers will 36 provide the PURA with the updated information. The carriers will also provide such communications to convey the status of operations during emergency situations. The sharing of such information would be limited to efforts to stabilize, recover and restore operations to levels necessary to support the communications needs of the carrier’s respective customers within Connecticut. Therefore, the information provided to the PURA is intended to eliminate duplicative requests for such information from various 37 state and local agencies. The Authority finds the Wireless Proposal to be responsive and satisfies the PURA’s needs when conveying outage/restoral information to other state agencies. The Authority acknowledges and appreciates the wireless industry’s efforts in meeting the PURA’s goals of expediting service restoral in times of emergency situations and recognizes that this results from the mutual collaborative relationship that the PURA has developed with the carriers over the years. Clearly, the Wireless Proposal reflects that relationship, which is mutually beneficial to the Authority and the industry, and ultimately to the businesses and citizens of the state. H. VIDEO CERTIFICATE HOLDERS’ STORM PREPAREDNESS Seven of the eight holders of Certificates of Video Franchise Authority (CVFA) and Certificates of Cable Franchise Authority (CCFA, collectively Certificate Holders) 36 Connecticut Emergency Support Function #12 provides the types of information and times by which it should be reported by the carriers. 37 Id., Attachment, p. 1.
  3. Page 93 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 93 of 125 Docket No. 11-09-09 Page 89 named at least one weather forecasting service or resource that they rely upon in determining staffing. Only TVC did not name any weather forecasting specific resource it uses. Certificate Holders Responses to Interrogatories CA-2 and CA-12. Among the weather forecasting resources used by Certificate Holders were the National Weather Service, the Weather Channel and local broadcast news programs, the National Oceanic and Atmospheric Administration and the National Hurricane Center. Id. All Certificate Holders filed copies of their emergency disaster or response plans required pursuant to Conn. Gen. Stat. §16-32e. Certificate Holders Responses to Interrogatory 38 CA-7. Except for TVC during the October Storm, which did little damage in extreme Southeastern Connecticut, Certificate Holders activated their emergency plans or parts of them for both storms. Certificate Holders Responses to Interrogatories CA-1 and CA11. Certificate Holders activated their emergency plans at different times prior to or about the times that Tropical Storm Irene and the October Storm began to impact Connecticut. Id. Below is a sampling of the specific emergency response preparation activities the Certificate Holders engaged in as the 2011 Storms approached. For Tropical Storm Irene, MetroCast initiated actions on August 26, 2011, identifying areas of its Connecticut footprint that were likely to be impacted, in addition to determining that customer calls would be redirected if the Connecticut call center was adversely affected. Outside contractors were also contacted and local management contacted CL&P to establish direct contact for local inquiries related to power issues. MetroCast Response to Interrogatory CA-1. When it became apparent to TVC that Tropical Storm Irene was going to hit land, emergency steps were implemented, including acquiring generators. TVC Response to Interrogatory CA-1. Charter began preparations for the potential effects of the Tropical Storm Irene on August 25, 2011, which included the establishment of emergency operations centers in Newtown and Windham and the fueling and deployment of back-up generators. Charter Response to Interrogatory CA-1. For both storms, Comcast monitored and tracked the impending weather events. When Comcast determined that each storm would have an impact on the state, it increased staffing and set up call-in numbers for employees. Its own work crews and contractors were deployed, with Comcast also making plans for accommodations and meals, where necessary. Comcast Responses to Interrogatories CA-1 and CA-11. Cablevision stated that before each storm, each Operations and Network Center goes through a checklist to determine staff needs. Cablevision also indicated that the prestorm preparation for the October Storm was more compressed because there was less warning about its potential effect. Cablevision Responses to CA-1 and CA-11. Verizon began to monitor Tropical Storm Irene on August 22, 2011. Among the storm preparation activities Verizon engaged in were topping off back-up generators with fuel and daily conferences to ensure that other preparation activities were being 38 Emergency plans filed in this docket were those that were filed in Docket No. 11-05-22, DPUC Review of Updated Emergency Plans (Emergency Plans Docket). The Emergency Plans Docket was suspended pursuant to the Authority’s December 29, 2011 letter to the participants in the Emergency Plans Docket.
  4. Page 94 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 94 of 125 Docket No. 11-09-09 Page 90 implemented. For the October Storm, Verizon’s emergency plan was not activated. Verizon Responses to Interrogatories CA-1 and CA-11. For Tropical Storm Irene, AT&T took action to prepare for the event when weather forecasts indicated a hurricane was approaching the northeast. AT&T’s command-and-control center, GNOC, began preplanning as the storm approached the South and North Carolina coasts. Preparation began well in advance of the storm’s arrival in Connecticut, with AT&T verifying supplies, including replacement poles and developing work force plans, among other activities. AT&T Response to Interrogatory TE-1. For the October Storm, AT&T began its pre-storm activities when weather forecasts indicated a potentially heavy snow storm was approaching. The GNOC again initiated preplanning activities, including distributing reports communicating the status of AT&T’s network to those needing those needing the information, including the Authority and other stakeholders. AT&T Response to Interrogatory TE-13. All Certificate Holders stated that they imposed no limit on overtime for their staff during Tropical Storm Irene and the October Storm. Certificate Holders Responses to Interrogatories CA-6 and CA-16. The Authority finds that Certificate Holders implemented their emergency plans or applicable parts thereof in a timely and effective manner in preparing for the 2011 Storms. I. VIDEO CERTIFICATE HOLDERS’ RESTORATION EFFORTS Neither Connecticut law nor regulation include specific performance standards or prescribed timelines with which video Certificate Holders must comply in restoring or attempting to restore service in the event of video service interruptions caused by severe weather events or other disasters. All Certificate Holders are subject to the customer service requirements of 47 CFR 76.309(c).39 Among the standards with which cable operators must comply is 47 CFR 76.309(c)(2)(ii), which states, “Excluding conditions beyond the control of the operator, the cable operator will begin working on “service interruptions” promptly and in no event later than 24 hours after the interruption becomes known. The cable operator must begin actions to correct other service problems the next business day after notification of the service problem.” Pursuant to 47 CFR 76.309(c)(4)(iii), “service interruption” means “the loss of picture or sound on one or more cable channels.” The federal customer service standards do not define the phrase “begin working on.” The Authority finds that, within the context of 47 CFR 76.309(c)(2)(ii) and considering the severity of the 2011 Storms, “begin working on” means activating emergency plans, as applicable, or commencing communications with the electric power companies (or keeping informed of the restoration activities of the electric power companies) to determine the safest and most efficient schedule for video service restoration which, under most circumstances, must follow the restoration of electric power. The Authority finds that, to ensure the safety of the public and Certificate Holders’ employees and to restore service in the most efficient and logical manner, “begin[ning] working on service interruptions” means initiating activities that 39 For CVFA holders, the requirement is at Conn. Gen. Stat. §16-331j(d), and for CCFA holders, the requirement is at Conn. Gen. Stat. §16-331u(d).
  5. Page 95 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 95 of 125 Docket No. 11-09-09 Page 91 must be performed well before sending technical staff into the field to take the corrective actions required to restore interrupted video service.40 Some Certificate Holders specified that they embedded employees at CL&P and/or UI’s Command Centers. Comcast Responses to Interrogatories CA-1 and CA11; Charter Responses to Interrogatories CA-1 and CA-11; Tr. 3/19/12, pp. 55 and 56; Tr. 3/19/12, p. 96. Comcast stated that embedding employees at CL&P and UI allowed it to focus on areas which had been made safe by the electric power companies for restoration of video services. Comcast Responses to Interrogatories CA-1 and CA-11. TVC, a subsidiary of Groton Utilities, the municipal electric company service providing service in Groton, coordinated its restoration efforts for Tropical Storm Irene at the City of Groton Municipal Building with Groton Utilities’ electric power component. TVC Response to Interrogatory CA-1. During and after the 2011 Storms, Certificate Holders performed numerous restoration-related activities, including the following. For the 2011 Storms, Comcast conducted internal storm calls from its Regional Emergency Center in Berlin, Connecticut each day. Comcast monitored its network from its Network Operations Center in addition to performing “ride outs” to determine damage and downed drops. Fiber was shipped to key locations to ensure that it could be on-site quickly. Comcast Responses to Interrogatories CA-1 and CA-11. Cox monitored the effect of the 2011 Storms from its situation room, following CL&P’s restoration of electric power. Cox noted that much of its restoration efforts, as was the case with all Certificate Holders, were dependent upon the pace of restoration of CL&P and safety issues. When the weather and safety conditions allowed, Cox deployed generators throughout its service areas to enable the network to continue to operate for a time while commercial power was still out. After each storm, Cox personnel followed CL&P as it made areas safe for Cox personnel and contractors to begin the work of restoring video service to affected subscribers. Cox Responses to CA-1 and CA-11. MetroCast scheduled two conference calls per day during the pendency of the Tropical Storm Irene to evaluate issues such as system damage and resource assignment, including contractors. MetroCast conducted ride-outs of its system continuously to assess plant damage. A MetroCast supervisor and construction coordinator communicated daily with CL&P to obtain their outage updates and to report damage. Resource and staff allocation was performed as needed throughout the storm. MetroCast Response to Interrogatory CA-1. Because the October Storm had considerably less impact on MetroCast’s operations in southeastern Connecticut than elsewhere in the state, its Emergency Plan was deactivated on October 29, 2011. MetroCast Response to Interrogatory CA-11. AT&T managed its responses to the 2011 Storms on an “enterprise wide basis” for all of its affiliates. For Tropical Storm Irene, AT&T activated two response centers to support Connecticut restoration of video, telecommunications and Internet services. In addition to embedding staff with CL&P and UI, AT&T participated in conference calls with Governor Malloy to discuss federal disaster assistance and participating on the 40 The Authority notes that reports produced by consultants hired on behalf of the PURA, the OCC and CL&P did not directly address the Certificate Holders’ performance in restoring video service to affected subscribers.
  6. Page 96 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 96 of 125 Docket No. 11-09-09 Page 92 TTF at the State Armory. Areas that AT&T prioritized for restoration were determined, in part, by working with CL&P and UI. AT&T Response to Interrogatory TE-1. AT&T’s response during and after the October Storm essentially mirrored its responses for Tropical Storm Irene. AT&T Response to Interrogatory TE-13. For both storms, Charter operated from its disaster Recovery Plan checklist developed over the last five years. Reports regarding system status, personnel and resources were received through calls held four times a day to coordinate restoration efforts. Status reports were also made to the Authority on a daily or twice daily basis. Charter participated on the TTF during both storms. Charter Responses to Interrogatories CA-1 and CA-11. Certificate Holders stated that no employees suffered significant injuries as a result of their field employees’ storm restoration efforts. The few injuries that did occur as a result of restoring video service after the 2011 Storms were characterized as minor. Certificate Holders Responses to Interrogatory CA-10 and CA-20. Certificate Holders mentioned factors which hindered their efforts to restore video services. The most common reasons cited were that restoration efforts were delayed because hazardous or unsafe conditions (downed electrical wires, trees, branches and debris on roads, etc.) prevented their employees and contractors from beginning video restoration activities. Because clearing roads and deactivating, repairing and/or replacing downed electrical power lines and damaged or felled utility poles were the highest priority, Certificate Holders’ restoration activities, by necessity, generally could not start in earnest until the former activities had been completed, primarily by CL&P and UI. Certificate Holders Responses to CA-1 and CA-11. Verizon stated that because the effects the 2011 Storms had on its Greenwich service area were relatively minor, no post-event review was conducted for either weather event. Verizon Responses to Interrogatories CA-9 and CA-19. TVC indicated that it does not have a policy on post-event reviews and that a review subsequent to the October Storm was unnecessary because it resulted in minimal damage in TVC’s service area in southeastern Connecticut. TVC Responses to Interrogatories CA-9 and CA-19. MetroCast performed a review after Tropical Storm Irene, but not after the October Storm, because there was little damage as a result of that storm. MetroCast Responses to Interrogatories CA-9 and CA-19. All other Certificate Holders stated that post-event reviews were conducted after both storms. Cox, Comcast, AT&T, Cablevision and Charter Responses to Interrogatories CA-9 and CA-19. The Authority finds that Certificate Holders’ performance in restoring video service in the wake of the damage caused by the 2011 Storms was reasonable and in the public interest and in the best interests of their employees who were responsible for going into the field to restore video service to subscribers. The Authority finds that Certificate Holders responded in as timely a manner as was reasonably possible, given the need to coordinate complex and dangerous post-storm activities with other stakeholders and utility providers whose services also needed to be restored. The Authority also finds that Certificate Holders deployment of back-up generators was a satisfactory temporary solution to the widespread loss of commercial electric power and was in the public interest.
  7. Page 97 of 125Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 97 of 125 Docket No. 11-09-09 Page 93 Finally, the record in this proceeding did not uncover any noteworthy shortcomings or deficiencies in the Certificate Holders’ individual and collective responses to the 2011 Storms that require corrective action at this time. The Authority is pleased that the clear majority of the Certificate Holders recognized the value of conducting formal or informal post-event reviews of their performance before, during and after the severe weather events to modify their emergency plans based on their real world experiences, as needed. The Authority expects the Certificate Holders to continue this practice in the future. J. VIDEO CERTIFICATE HOLDERS’ COMMUNICATION WITH CUSTOMERS, MUNICIPALITIES AND THE PUBLIC As discussed in greater detail below, for the 2011 Storms, the Certificate Holders indicated that they maintained communications with municipal officials in their respective video service areas. No Certificate Holder stated that it had received any complaints regarding their communication efforts during the Storms. Certificate Holders Responses to Interrogatories CA-8 and CA-18. 1. Cablevision a. Customer Communications Cablevision maintains a total of six call centers that can respond to incoming customer calls. Calls from Connecticut customers are primarily handled by two in-state call centers. However additional call centers permit Cablevision to form a single “virtual call center” allowing the Connecticut calls to be answered at any call center. All of Cablevision’s call centers were fully staffed during both outage events. Cablevision Response to Interrogatory CSU-48. In the event of storms or other anticipated incidents, Cablevision makes preparations so as to deal with increased call volume. Cablevision offers overtime and allows shift adjustments at its call centers so staff may work 10-12 hour shifts. Cablevision also stated that its preparations insure that call centers are adequately equipped and that emergency generators are adequately fueled in case they are needed. Tr. 3/19/12, pp. 27 and 28. Cablevision’s call centers are staffed to operate on a 24 hours a day, 365 days per year basis. Cablevision Responses to Interrogatories CSU-52 and CSU-63. A sample of Cablevision’s call center performance metrics follows: Date ASA41 ACR%42 Total Calls43 Date ASA ACR% Total Calls 8/27/11 51 6.5% 7,025 10/27/11 10 0.8% 9,434 8/28/11 151 23.9% 13,337 10/28/11 8 0.7% 9,149 8/29/11 77 20.4% 28,666 10/29/11 187 23.0% 12,042 8/30/11 138 13.2% 19,214 10/30/11 323 29.6% 15,078 8/31/11 111 7.9% 18,596 10/31/11 149 14.4% 16,124 9/01/11 125 9.4% 17,715 11/01/11 112 11.3% 16,226 41 Average Speed of Answer, in seconds. Also includes calls answered by the automated IVR. 42 Abandoned Call Rate, equals abandoned calls divided by total calls (live and IVR). 43 Also includes automated IVR calls.
  8. Page 98 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 98 of 125 Docket No. 11-09-09 9/02/11 9/03/11 9/04/11 9/05/11 9/06/11 41 14 4 3 96 Page 94 2.7% 0.6% 0.3% 0.1% 7.9% 16,199 10,586 6,968 7,881 14,928 11/02/11 11/03/11 11/04/11 11/05/11 11/06/11 53 55 28 39 35 4.8% 5.2% 2.9% 3.6% 3.4% 14,353 13,287 13,720 9,949 7,707 Cablevision Response to Interrogatory CSU-49. From August 27, 2011 through September 6, 2011, total peak staff at Cablevision’s call centers averaged approximately 850 employees. For the time period of October 27, 2011 through November 13, 2011, total peak staff at Cablevision’s call centers averaged approximately 738 employees. Id. Cablevision stated that given the extent of the disruption caused by the outage events, its customer call centers performed well and it was content with its contingency planning. Cablevision Response to Interrogatory CSU-62; Tr. 3/19/12, pp. 28 and 29. Cablevision provided its customers via its web site important information during Tropical Storm Irene, but not during the October Storm. Cablevision Responses to Interrogatories CSU-54 and CSU-65. It is the Authority’s position that during events such as Tropical Storm Irene or the October Storm, the dissemination of accurate information to utility customers is as equally important to the answering of customer calls and the acquisition of information from customers. Accordingly, Cablevision will be ordered to create a webpage that contains storm and other emergency information for its customers in Connecticut. b. Municipal & Other Utility Company Communications According to Cablevision, it has a well-established working relationship with the chief elected officials in all 24 municipalities of its service area. Cablevision provides all of the chief local officials with contact information that enables them to reach its Connecticut-based Government Affairs staff on a 24 hours a day, 7 days a week basis for any storm-related or other matter. Cablevision Responses to Interrogatories CATV8 and CATV-18. Cablevision stated that on a regular basis it maintains its contact and relationships with local municipal officials. Tr. 3/19/12, pp. 29 and 30. During and after Tropical Storm Irene, Cablevision did not receive any complaints from municipal officials in its service territory. During and after the October Storm, Cablevision received only one inquiry regarding service-credit policies from the municipal officials in its service territory. Cablevision Responses to Interrogatories CATV-8 and CATV-18. During incidents such as the two outage events, Cablevision maintains direct communications with CL&P and UI at almost every level. This communication allows for Cablevision to monitor its restoration process from the executive level down to the street level where individual trucks are assigned. Further, Cablevision was able to maintain a presence at the emergency operations centers of both CL&P and UI during both storms and found this measure to be very beneficial. Tr. 3/19/12, pp. 30-32. 2. Charter Communications
  9. Page 99 of 125Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 99 of 125 Docket No. 11-09-09 a. Page 95 Customer Communications Charter operates virtual call centers nationally that are established to respond to customer service calls. The virtual call centers are capable of handling fluctuating call volume at any time such as what was encountered during the two outage events. When the call centers become aware of widespread power outages resulting from storms, Charter staff is provided with continuous updates regarding the status of the network and the affect to service. Charter’s automated IVR system can announce a message regarding outage situations as well as having this information available on its web site. Charter Response to Interrogatory CSU-48. Charter’s call centers are staffed to be available on 24 hours per day, 7 days per week basis. Charter Responses to Interrogatories CSU-52 and CSU-63. Charter stated that its virtual call center approach was well situated to deal with the increase in call volume resulting from service outages due to the two storms. Charter contends that because incoming customer calls can be distributed to the next available agent at the any one of its call centers, incoming call volume was successfully responded to as its agents. Charter Response to Interrogatories CSU-51 and 62. The following are performance metrics reported by Charter to the FCC for its virtual call centers: Month ASA44 ACR%45 Total Calls August 3 0.44% 10,222,514 September 3 0.51% 9,862,965 October 4 0.41% 9,528,633 November 4 0.44% 9,083,695 Charter Response to Interrogatories CSU-49 and CSU-60. Charter provided copies of information and instructions that were distributed to call center staff to assist them with answering customer questions and complaints regarding service outages. Based on the documentation provided, Charter call center staff was given sufficient information in order to assist its customers. Charter Responses to Interrogatories CSU-58 and CSU-69. However, Charter indicated that it does not have a web page dedicated to storm information for its customers. During and after both outage events, Charter placed a banner on its website that contained information specific to the storm. Charter stated that it is exploring different methods of communicating more effectively to its customers that are affected by storms or other disasters that affect service. Charter Responses to Interrogatories CSU-54 and CSU65. As stated previously, it is the Authority’s position that during events such as Tropical Storm Irene or the October Storm, the dissemination of accurate information to utility customers is as equally important to the answering of customer calls and the acquisition of information from customers. Accordingly, Charter will be ordered to create a webpage that contains storm and other emergency information for its customers in Connecticut. b. Municipal & Other Utility Company Communications 44 Average Speed of Answer, in seconds. 45 Abandoned Call Rate.
  10. Page 100 of 125

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 1 Page 100 of 125 Docket No. 11-09-09 Page 96 Charter’s Government Relations and Public Relations staff was responsible for establishing and maintaining communications with municipal officials during the two outage events. In this capacity, Charter staff contacted municipal officials and members of its cable advisory councils to provide status reports on its restoration efforts. Charter staff also worked with its municipal contacts so as to obtain information on local conditions such as road closings and downed drop lines. Charter Responses to Interrogatories CATV-8 and CATV-18. It has been Charter’s past practice to speak with the municipal officials in its service territory on an annual basis regarding emergency plans and protocols. However, Charter has stated that given the experiences learned from the two outage events, it is looking to make improvements to the communications with municipal officials. Tr. 3/19/12, pp. 40 and 41. Subsequent to the October Storm, Charter provided updated emergency contact information to its municipal officials. This information was also to be shared with all of the towns’ public safety and emergency operations officials. Charter states that this information will now be sent to the municipal officials in their service territory on an annual basis. Charter Response to Interrogatory CSU-50. According to Charter, the municipal officials were very appreciative of the updated emergency information provided in the wake of the October Storm. Tr. 3/19/12, pp. 41 and 42. On or around the fourth day following Tropical Storm Irene, Charter was permitted to have a staff person at the CL&P emergency operations center. Once this was in place, Charter was able to receive quicker updates on CL&P’s cut-clear, make-safe efforts. Charter Response to Interrogatory CATV-8. Prior to this, Charter stated that there was some frustration in getting its staff embedded at CL&P, but since then relations with CL&P have improved. Tr. 3/19/12, pp. 42 and 43. For the October Storm, Charter staff was embedded at the CL&P emergency operations center immediately. Tr. 3/19/12, p. 42. Consequently, the coordination with CL&P improved over what was experienced during Tropical Storm Irene. Charter Response to Interrogatory CATV-18. 3. Cox Communications a. Customer Communications Cox maintains a New England call center that serves Connecticut customers. During both outage events, this call center was fully staffed and opened on 24 hours a day, 7 days per week basis. Along with its New England call center, Cox was also able to utilize its other national call centers, outsource partners, and alternative media to ensure communications for its customers. Cox Responses to Interrogatories CSU-48, CSU-52 and CSU-63. Utilizing this approach, during and after each of the two storms, Cox could rely on approximately 230 full-time equivalent (FTE) employees at the New England call center, an additional 200 FTE employees at its outsource partners, and an unquantifiable number of FTE employees nationally. Cox Response to Interrogatory CSU-49. Some of the national call center were located in Kansas, Oklahoma, San Diego and Virginia. Further, having calls answered in San Diego allowed Cox customer calls to be answered later in the evening. Tr. 3/19/12, p. 61. In anticipation of both storms, Cox implemented a number of emergency measures. These included offering unlimited overtime to its employees, securing accommodations for employees at local hotels, initiating its Business Continuity Plan that allowed Connecticut calls to be

Text of EOE-383 Attachment 2.pdf

Extracted from the file · 182 pages · 461,233 characters

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)