Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 11 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 11 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 8. The extent to which the plans capture and use feedback from drills, training exercises, and post-event critiques of actual storm responses to affect improvements in the plans 9. The proven effectiveness of procedures, methods, organizational structures, and processes as set forth in the plans 10. The frequency, comprehensiveness, and effectiveness of updates to the plans The chart below lists items that a comprehensive emergency plan should address. While not intended to be comprehensive, this list includes the important topics in a major outage response. In its review of the emergency plans of both CL&P and UI, Liberty used this chart to determine whether in its opinion the plans were comprehensive in content. General Information Lines of Authority Pre-Event Activities Event/Damage Prediction Classes of Emergency Internal Communications Restoration Activities Use of Outside Resources Operation Center Inventory Control Public Safety Meals/Lodging Practices Use of Other Personnel Downed Wire Process Elected Officials Employee Services Est. Restoration Time Transmission System Hazard Analysis Post-Event Activities Post-Event Critiques B. Administration/Resources Roles/Responsibilities Weather Services Activation/Mobilization Alert Notification Process Organizational Structure Damage Assessment Crew Guides Division Operation Center Material Supply Employee Safety Security Work Prioritization Cut and Clear Process Priority Services Plan Accessibility Call Center Operations Substations Transportation Ramp-Down Action Item Prioritization Planning Processes Drills/Training Monitoring/Alert Processes Documentation External Communications Personnel Support Restoration Work Force Team Leaders Local Operation Center Procurement Logistics Worker Orientation Work Order Handling Regulatory Relationships Critical Care Customers Fleet Management Tree Clearing Status Conference Calls Fueling Process Clean-Up Corrective Action CL&P 1. Form and Contents The emergency plan used by CL&P in responding to Hurricane Irene and the October snowstorm was the Emergency Response Plan, filed with the Connecticut Public Utilities Regulatory Authority (PURA) in June 2011. The plan consists of four sections as follows: Section 1 – Basic Plan – 28 pages Section 2 – District Plan – 42 pages (including 11 pages of appendices) Section 3 – Division Plan – 22 pages Section 4 – Emergency Response Organizations – 45 pages April 16, 2012 The Liberty Consulting Group page 8
  2. Page 12 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 12 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 In addition to these four sections, the CL&P plan has three pages of definitions and a four-page summary of changes to the previous plan. While not on file with PURA, CL&P used a 414-page Index of Operating procedures (known as EPOPS), which covers 25 separate response functions, to provide response guidance. CL&P requires each district storm room to keep these combined plan documents, which total 558 pages. 1 Contained in one large binder, these plans are physically unwieldy. Section 1 – Basic Plan The basic plan has six subsections – Introduction, Authority and Policies, Concepts of Operation, Preparedness Activities, Response Activities, and Post Incident Activities.2 Subsection 1 – Introduction As stated in the opening line, the objective of the CL&P Emergency Response Plan (ERP) is to provide “a systematic and organized approach to prepare for, and respond to, power outages caused by severe weather, flooding, civil disturbance, or other major disruptions of the Distribution System.” This subsection established the operational structure, defined as Incident Command Center (ICS), for CL&P’s emergency response. The plan is applicable to CL&P and Northeast Utilities (NU) corporate staffs in all moderate through major power outages.3 This subsection is, and by definition should be, general in nature. Subsection 2 – Authority and Policies This subsection covers the delegation by the president of CL&P of “authority for performance and direction of actions of this plan.” For CL&P, it delegates this authority to the Manager – Emergency Management and the CL&P Emergency Management Group (EMG). For NU, it names the Manager – System Restoration and Emergency Preparedness, and the Northeast Utilities Emergency Operations Group (NU EOG).4 There is no specific wording in this section to underscore top management’s full support and involvement in major outage restoration. This subsection discusses policies dealing with safety, environmental concerns, and communications. As would be expected, the treatment of these topics is primarily generalized and conceptual in nature. The wording makes the ICS Communication Policy seem more proactive than the Safety and Environmental Policies. There is no mention of advanced training and specific actions such as daily safety briefings.5 Under Public Safety and Restoration Priority, the document makes the following statement: “Public safety requires immediate efforts for making safe downed, energized wires, and clearance of downed wires, poles, trees, and limbs on major transportation arteries that 1 CL&P Emergency Response Plan, Section 2 – District Plan, page 33; Interview No. 27, 1/4/2012 CL&P Emergency Response Plan, Section 1 – Basic Plan, page 2 3 CL&P Emergency Response Plan, Section 1 – Basic Plan, page 3 4 CL&P Emergency Response Plan, Section 1 – Basic Plan, page 5 5 CL&P Emergency Response Plan, Section 2.2 – 2.5 – Basic Plan, pages 5-7 2 April 16, 2012 The Liberty Consulting Group page 9
  3. Page 13 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 13 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 provide access for emergency services (emphasis added).”6 Liberty discusses CL&P’s practice of working with towns on road clearing in a following section of this report. Subsection 3 – Concepts of Operation The opening statement of this subsection is “Normal District work groups handle most power outages.” It goes on to say CL&P activates the response organization first at the local level to “handle events of moderate and medium severity.” 7 It does not address the situation of a large storm with advance notice (e.g., hurricane) in which “top down” activation is more likely. The language in the two segments dealing with Management and Process Summary – Sections 3.2 and 3.3 – is general and conceptual in nature, but serves the purpose of this part of the overall plan. Subsection 4 – Preparedness Activities This subsection sets forth the “elements [that] are set in place prior to an actual emergency.” The list is not all-inclusive, but contains the following elements: personnel, notification systems, contact lists, equipment, staging areas, contract crews, mutual-aid utility crews, weather forecasting, and media kits. 8 4.1 – CL&P EMG (Emergency Management Group) The description of the role of Area Command in 4.1.3 is troubling because CL&P worded the ERP in such a way as to exclude proactive activation of the Area Command prior to the onset of storms such as Hurricane Irene and the October snowstorm. Specifically, the plan uses the following language, “An Area Command is activated when there are numerous outages in more than one division, or when outside resources are required.”9 The segment 4.1.5 – Augmenting Personnel and Support Functions – is a very important part of any successful emergency response effort. CL&P does a good job of clearly setting forth the responsibilities of employees and different functional groups in providing this support. One extremely significant statement: “Personnel are drawn from normal CL&P and NU work groups to augment division or district staff and fill functions in the ICS organizations. It is the expectation of executive management that every CL&P and NU system employee will participate in his or her assigned storm role when called upon.”10 To set forth clear expectations regarding support efforts is very important, and CL&P has done so. Sections 4.2 through 4.6 These sections cover (4.2) State, Municipal, and Community Coordination, (4.3) Emergency Restoration Equipment, (4.4) Outside Services, (4.5) Emergency Response Alerts, and (4.6) Training and Drills. The wording in these segments is helpful and adequate for the intended 6 CL&P Emergency Response Plan, Section 2.2.1 – Basic Plan, page 5 CL&P Emergency Response Plan, Section 3.1– Basic Plan, page 8 8 CL&P Emergency Response Plan, Section1, 4. Preparedness Activities - Basic Plan –, page 10 9 CL&P Emergency Response Plan, Section 1, 4.1.3 – Basic Plan, page 12 10 CL&P Emergency Response Plan, Section 1, 4.1.5 – Basic Plan, page 13 7 April 16, 2012 The Liberty Consulting Group page 10
  4. Page 14 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 14 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 purpose, which is general and conceptual in nature. The Basic Plan appropriately addresses these topics. Overall, the ERP treatment of Preparedness Activities found in Subsection 4 provides good guidance as well as clearly stated responsibilities and management expectations. The Emergency Plan Operating Procedures (EPOP), which Liberty covers in a following section of this report, provides specific details of these activities. Subsection 5 – Response Activities This subsection covers six separate response elements. 5.1 – Command System Initiation This element sets forth the ICS initiation process, providing that senior management, Area command leaders, and Division or District heads may initiate ICS. In its application of the ICS structure, CL&P appears to put the largest responsibility on the lowest unit – the district. 5.2 – Emergency Classifications In the chart below, 11 the CL&P ERP establishes five levels of emergency that help determine the amount of required resources. Classification of Service Outage Events Level Expected Number & Type of Crews Required 1 to 25 CL&P Crews (Note 1) Expected Duration Level I < 10,000 Level II < 20,000 26 to 75 CL&P Crews (Note 1) 12 to 24 Hours < 40,000 76 to 100 CL&P, NU System Crews, & Mutual Aid Crews (Note 1) 24 to 48 Hours < 80,000 101 to 175 District, NU System, & Mutual Aid Crews (Note 2) 48 to 72 Hours Level III Level IV 11 Expected Number of Customers Likely to be Affected < 12 hours ICS Activation Managed by the SOC and District personnel Managed by the SOC, District and Division Command Managed by the District Incident Commander, Division Command, and Area Command Managed by the District Incident Commander, Division Command, Area Command, and System Command CL&P Emergency Response Plan, Section1, 5.2 – Basic Plan, page 22 (selected data – formatting) April 16, 2012 The Liberty Consulting Group page 11
  5. Page 15 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 15 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Managed by the District Incident Commander, Level V >100,000 > 72 Hours Division Command, Area Command, and System Command Notes: 1. Corporate Personnel pre-positioning is unlikely except for extenuating circumstances. 2. Corporate Personnel pre-positioning is optional but more likely. 3. Corporate Personnel pre-positioning is expected. over 175 District, NU System and Mutual Aid Crews (Note 3) There is an error in this chart concerning the number of customers out at each level. As shown above, there is no classification level listed for events affecting 80,000 to 100,000 customers. The event classifications as shown above are in keeping with standard utility practice. Beginning with Level III, CL&P activates Area command and brings in outside resources, including crews from other NU companies. At Level IV, CL&P activates System command, and at Level V, prepositions corporate personnel. (At Level IV, pre-positioning of corporate personnel is optional.) As stated above, the primary purpose of CL&P’s event classification is to make an early determination of required resources, based on the best information available at the time. Based on this chart, it is clear that the CL&P ERP calls for the full engagement of all resources available for all events at Level III and above. 5.3 – Escalation of Emergency Response This segment covers the “bottom up” escalation, which the ICS structure stresses. This segment covers each level—District, Division, Area, and System—along with action steps taken at each level upon activation. Escalation is the topic here, and it is adequately covered. Sections 5.4, 5.5, and 5.6 These segments address (5.4) Contractor Support and Mutual Aid, (5.5) Work Schedule, and (5.6) Demobilization from Emergency. They address the subject in a succinct manner, providing good guidance. Included are assigned responsibilities for procurement of outside resources, the emergency working hours (16 hours on and 8 hours off, maximizing daylight), and the priority order in the release of outside crews. Subsection 6 – Post Incident Activities This subsection addresses three specific areas, Equipment and Vehicle Restoration, Post-Storm Critique, and Administrative Updates and Procedure Revisions. It covers these three topics well and assigns responsibility for such things as critiques and updating of contact lists. There is one topic not covered that is normally considered an essential post incident activity. The topic left out goes by a number of names, but is essentially clean-up. This includes things like making repairs and replacements of temporary fixes to the distribution system and clearing partial tree work. This process involves thorough inspections of both line facilities and tree exposure. April 16, 2012 The Liberty Consulting Group page 12
  6. Page 16 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 16 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Section 2 – District Plan The district plan is a 42-page document divided into five subsections plus an 11-page Appendix. The five subsections are Introduction, Concepts of Operation, Instructions, Demobilization and Recentralization, and Post Storm Activities. Subsection 1 - Introduction Consisting of just one page, this first subsection addresses the objective, applicability, and organization of the District Plan. It treats these topics adequately. Subsection 2 – Concepts of Operation This subsection addresses three topics: • 2.1 General – Use of ICS at the District level • 2.2 Management – Duties of the District Commander • 2.3 Process Summary – Key points are Activation of ICS; Action Steps (pre-event, during event, and post-event); Priority of recruiting/releasing outside crews; System Operations Center (SOC) handles OMS and all dispatching. Subsection 3 - Instructions 3.1 Preparedness Activities The segments on Pre-storm Checklist and Annual Preparedness Activities (3.1.1 and 3.1.2 respectively) provide a good overview on these topics with references to more detail in sections of Emergency Plan Operations Procedures (EPOP). Segment 3.1.3 – Emergency Drills and Tabletop Exercises – places the primary load on the district. It indicates that CL&P EMG (with help from NU) normally conducts simulated storm drills annually. 12 The Division Director can decide fewer district drills are needed, and the Director, System Operations can decide fewer simulated drills are needed based on storm response experience during that period. The converse is also true, and CL&P may hold more frequent drills when there are new processes or software that requires more training. The concept of pushing the responsibility down to the lowest level of the organization is contrary to the usual practice in utilities. As written, the CL&P plan does not place an adequate stress on training and drills. 3.2 Conference Calls This segment sets forth the concept of and reason for conference calls, the responsibility for initiation of calls, and the key elements of the calls. There is no specification as to how many or at what time of day personnel should make the calls. 12 CL&P Emergency Response Plan, Section 2, District Plan, 3.1.3 page 12 April 16, 2012 The Liberty Consulting Group page 13
  7. Page 17 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 17 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 3.3 District Decentralization “District Decentralization is defined as the transfer of certain SOC functions out to District locations during emergency events. The decision to decentralize is a collaborative process initiated by System SOC Management, Area Command, Division Command, and District Command.” 13 These are the opening sentences in this subsection. Expressed differently, it is moving the duties of switching and dispatching crews from the System Operations Center (SOC), where they normally reside, down to the district level. This is due to the large amount of damage and repair crews in the impacted area. It sets forth the duties of the four separate functional groups mentioned – SOC and Area/Division/District Command – as related to this decentralization process. The plan allows for the decentralization down to the district level even when the Area and Division Commands are not activated (although they participate in a conference call with the SOC and District Command.) When an outage event has occurred or anticipated in which CL&P considers district decentralization, the Area and Division Commands should be activated. Therefore, the plan covering district decentralization should confirm Area and Division Command activation. There should not be any need to qualify the instructions to cover “when the Area Command is activated,” and “when the Division command is activated.” 3.4 Activation and Staffing of the District Incident Command Post14 The second paragraph of this segment deals with the district organization in “an elevated event.” The wording is weak, leaving some important considerations left to the district to decide. For instance, “it is advisable for the District Commander to utilize the Section Chiefs…,” or “The District Commander needs to maintain a manageable span of control and delegate responsibilities as the situation warrants.” To provide effective guidance, the ERP should provide specific triggers to implement certain organizational structures. 3.5 Transfer of Command and 3.6 Scheduling and Utilization of Required Resources The wording in these two segments cover the process for the Incident Manager to effect transfer to the next shift Incident Manager, and the sequence of actions to begin the response and gain situational awareness. The wording effectively covers the subject matter. 3.7 Required Resources A more apt name for this segment is “restoration process requirements.” It covers the assessment and deployment of line and tree crews, the analysis process, “wires down” support, damage assessment patrols, food and lodging for workers, safety, field services (stores, transportation, and facilities), environmental management, municipal and large customer liaisons, and corporate communications. The wording is primarily general and conceptual in nature, but used in 13 14 CL&P Emergency Response Plan, Section 2, District Plan, 3.3 page 14 CL&P ERP, Section 2, District Plan, 3.4, page 15 April 16, 2012 The Liberty Consulting Group page 14
  8. Page 18 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 18 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 conjunction with the EPOP section, provides adequate guidance. Worthy of note is the process for determining early the total estimated restoration time. The plan describes it in this manner: Estimated Restoration Time = (Trouble spots) x (Average time to restore) / (# of Crews) Rules of Thumb: Three trouble Spots per interruption Time to restore Trouble Spot varies depending upon type of storm damage as follows: Lightning = 2 hours/Trouble Spot Wind = 3 hours/Trouble Spot Ice = 4-5 hours/Trouble Spot Take into account ‘Make Safe Time’ If a Transmission event – Update restoration time NOTE Restoration times obtained using the aforementioned formula and Rules of Thumb only provide a guide to determining restoration times. Rules of thumb and calculated restoration times obtained must be considered in light of actual damage and extrapolations based on application of logic and experience.15 It is commendable that the CL&P plan has a process to seek to determine for each district the overall restoration time, and the approach in the formula is logical. In the absence of a predictive model, this is a good tool. Subsection 4 – Demobilization and Recentralization This subsection is short, but adequate. It describes the order of release of outside crews, and the demobilization process when the remaining restoration work is manageable by the normal district operations. The recentralization process is described as, “the District release of the SOC function back to the SOC.”16 It sets forth the key points of both of these processes. Subsection 5 – Post Storm Activities This subsection has three segments – Equipment/Supplies, Exemplary Performance Recognition, and Post-Storm Critique. Worthy of mention is the provision that CL&P will complete all district critiques within 14 days after the restoration completion, and complete division critiques within 30 days. However, as in the Basic Plan, the district plan does not cover another essential postincident activity, clean-up. This activity involves making repairs and replacements of temporary distribution system fixes, cleaning up temporary tree work, and thorough inspections of lines and trees. 15 16 CL&P ERP, Section 2, District Plan, 3.7, page 18 CL&P ERP, Section 2, District Plan, 4.2, page 28 April 16, 2012 The Liberty Consulting Group page 15
  9. Page 19 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 19 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 District Storm Room Forms At the end of Section 2, District Plan, there are ten pages devoted to samples of forms used in the District Storm Room. This includes, Storm Room Check List, Trouble Ticket, Damage Assessment Patrol Report, Outside Crew Record, Storm Restoration Analysis, Storm Prepackage Cover Sheet, Customer Notification Damaged Service Tag, and Environmental Response Guide. This type of information included in the storm plan enhances its usefulness to responders. Section 3 – Division Plan The CL&P Division Plan is 22 pages in length compared to 28 in the Basic Plan, and 42 in the District Plan. It consists of five subsections – Introduction, Concepts of Operation, Instructions, Demobilization and Recentralization, and Post Storm Activities. Much of the wording in the division plan is included in either the Basic Plan or the District Plan, or both. The comments, conclusions, and recommendations on the previous two sections are applicable to the Division Plan. Section 4 – Emergency Response Organizations This is a 45-page section, covering Emergency Operations Groups, Incident Command System, System Command Positions and Responsibilities, CL&P Area Command Positions and Responsibilities, Division Command Positions and Responsibilities, District Command System Positions and Responsibilities, and Emergency Operations Center. The purpose of this section is to set forth specifics of the different organizational levels of the CL&P emergency organization. CL&P arranged this in a logical order, beginning with the emergency groups (NU EOG, CL&P EMG). It explains the concept of the Incident Command Center, and it is clear that CL&P is committed to following ICS closely. In the subsection on ICS, the plan provides generic organization charts showing the system, area, division, and district ICS structures. This is helpful to the user in understanding ICS better. As the sub-headings would indicate, the following segments show the specific organization charts and job responsibilities of function leaders at the System, Area, Division, and District level. Much of the information included in this subsection is a compilation of information found in the Basic, District, and Division Plan. It is useful because it provides a quick reference for responders arranged in an organizational concept. Worthy of note is the sentence found in the subsection on ICS, “The ICS uses a tiered approach placing authority and responsibility at the lowest possible organization level to efficiently respond to emergencies of varying magnitudes.”17 It is worth repeating – the CL&P ERP appears to approach all emergency response from the “bottom up.” This would work well in the case of an incident that starts small and escalates; it is not the approach to take in emergencies such as Hurricane Irene and the October snowstorm. 17 CL&P ERP, Section 4, Emergency Response Organizations, 2.2, page 5 April 16, 2012 The Liberty Consulting Group page 16
  10. Page 20 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 20 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Emergency Plan Operating Procedures (EPOP) The EPOP section of CL&P’s ERP is a 414-page addendum to the plan filed with PURA in June 2011. It contains 25 storm response procedures that the table below lists. Emergency Operations Center Activation & Operations Environmental Management System Project Support Vegetation Management Wires Down Food and Lodging Support Transportation Information Technology Support Emergency Work Orders and Accounting Interruption Ticket Analysis and Processing Municipal and Customer Liaisons Decentralized Emergency Operations CL&P Emergency Disturbance and Incident Reporting Safety Communications and Media Relations Mutual Aid and Staging Area Support Telecommunications Support Damage Assessment Patrols Stores Facilities Support Contract Services Transmission Assistance Teams E911 Call and Trouble Ticket Processing Staging Areas Support Future Procedure This is a very good response tool, providing roles, responsibilities, instructions, and checklists for each of the above procedures. Although the Emergency Operations Center Activation and Operations procedure mentions System Commander, there is no checklist for this position. 2. Training, Drills, and Use of the ERP The best emergency plan is of little or no use unless the utility thoroughly trains and regularly drills responders, and the emergency response team actually uses the plan. Liberty found deficiencies in this area at CL&P. The following are excerpts from the Basic Plan dealing with training and drills: “Training and Drills Training and drills are required to ensure the knowledge and skills of personnel assigned emergency response activities are current and sufficient to efficiently complete all required actions. CL&P EMG coordinates core, basic training with the assistance of the NU Training Department…. The Division Director or his designee, with assistance from CL&P EMG, shall initiate District level tabletop drills and perform drill critiques within his assigned Division. Periodically, the Division Director shall expand the drills to incorporate Division Command roles and responsibilities… The Division Director ensures drills are performed in a manner that exercises the departments and organizations that assist in storm and outage recovery within his Division. The Division Director may delegate responsibility for District level drills to the District Operations Manager who will conduct the drill and provide a report evaluating the drill’s effectiveness. April 16, 2012 The Liberty Consulting Group page 17

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)