Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 117 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 117 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 In addition, critical infrastructures, such as water treatment plants, lift stations, gasoline stations, hospitals, and nursing homes, were not easily identifiable in the outage system. This left many towns in difficult situations—without drinking water or water treatment facilities, gas stations unable to pump gasoline, schools and polling locations without power, etc. This made it difficult to prioritize restoration efforts, and in some cases, creating public relations issues. A decentralized approach such as this also brings inherent challenges to provide assistance and communications in a consistent fashion. In addition, this was a new approach for everyone— Town Liaisons, CL&P Operations Personnel, and communities. Deploying 149 individuals, many of which had never served in this manner before, was a bold move. On top of this, CL&P had not clearly set expectations with communities about the role of the Town Liaison. Neither had CL&P established a list of critical infrastructure in each town, so there were challenges managing each town’s priorities with CL&P restoration priorities. Lessons learned regarding the Town Liaison Program:162 • CL&P had not clearly established municipalities’ restoration priorities before the storms. In the future, CL&P should to meet annually with municipal officers to discuss and confirm priorities. These priorities should be flagged on CL&P’s circuit maps and in EDS and CL&P should strive to communicate estimated restoration times until the critical infrastructure has been restored. • Regional partnerships or associations may be necessary, as some towns do not have Emergency Operations Centers. • Towns need timely and accurate restoration status information. CL&P has developed Town-Level tools that provide access to outage status information. • Town Liaisons need timely and accurate restoration status information. CL&P will provide additional Town Liaison training, Handbook, laptops and air cards. • Town Liaisons need to establish a relationship with the municipality in advance of the storm. CL&P will pre-assign Town Liaisons and designate a back up who will meet periodically with town leaders to develop an-ongoing relationship. Post-storm feedback was generally very positive on the idea of a town liaison, however opinions varied widely on how well the program achieved town objectives. 4. Communicating Outage Information Traditionally, electric utility customers have called the utility to report problems or interruptions in their electric service. In most cases, customers simply wish to make sure the utility is aware of their outage or problem and want to find out when the utility will restore service. Advances in computer technology and telephony have presented options for communicating service outage information to and from customers. Nearly commonplace now, utilities have embraced the use of Interactive Voice Response (IVR) technology to allow self-service outage reporting via telephone, largely as a self-defense measure to help cope with the spike in call volumes associated with large outages. Utilities also have leveraged Interactive Voice Response 162 Response to AG-038. April 16, 2012 The Liberty Consulting Group page 114
  2. Page 118 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 118 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 technology to enable two-way communications, allowing customers to report outages as well as obtain customer-specific restoration status information from the utility. The growth of the Internet, mobile computing, and internet-capable telephones have made it necessary for utilities to offer outage information on company websites. Most electric utilities in the United States are providing some level of outage information on the corporate web site, at the most basic, listings of affected areas and number of customers out of service. Many utilities have also established self-service outage reporting through the web site, providing yet another way for customers to let the utility know they are without power. Not surprising, web access is becoming very popular during a large outage. While individual residences may be without power, businesses and public areas may have power and many cell phones have Internet access, giving the public access to the website, even during a large outage event. Additionally, advanced metering technologies and distribution automation are beginning to present opportunities to identify customer locations that have lost power. Ultimately, automation will identify outages, reducing the need to rely on customers to report outages. In fact, utilities with this level of notification can proactively contact customers, especially critical care customers, to let them know that the company knows about the outage, provide the expected restoration time, and preempt a significant number of customer calls and website visits. The management of outage information is critical to effective communications both within and outside the utility. By reporting individual outages, customers continue to play an important role in determining the extent and location of an outage, and will continue this role until the utility deploys distribution automation to the meter. Whether the customer speaks with a representative or self-reports the outage through telephone technology, the call creates a “trouble ticket” in the outage management system. Outage management systems automate trouble order management and expedite the analytical process, helping utilities more quickly identify outages and begin restoration. Outage systems present the capability to predict affected devices by using algorithms to relate trouble tickets to the electric device schema. By automating the sorting and analyzing of outage tickets, management can better determine and dispatch the appropriate resources to restore service. Many outage systems disable or limit device prediction during a large event because the algorithms become less predictive. While lights-out calls from customers are good indicators that damage exists and provide a feedback mechanism to tell whether trouble remains on the system, a complete and thorough damage assessment gives a utility the best chance of properly planning and executing the restoration. The planning function allows the utility to provide accurate and specific estimations of restoration time as the effort progresses. Qualified and trained individuals acting in their storm role perform damage assessment. Just as critical, the restoration planning process plays a role by developing initial estimates of restoration time (ERTs). The utility must incorporate these estimates into the outage management system in a timely manner so that other employees, customers, corporate communications, community relations, and other interested stakeholders can share this April 16, 2012 The Liberty Consulting Group page 115
  3. Page 119 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 119 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 knowledge. Equally as important, the utility must update the estimates of restoration time in the outage management system as more information becomes available. Accuracy is a key concern as the outage system usually serves as “the source” for the number of affected customers and storm restoration status for other areas of the company, including call centers, emergency operations centers, public relations, and regulatory relations. Outage systems often have the ability to initiate automated customer callbacks, in conjunction with the utility’s telephony. Adjunct to the damage assessment process, the automated call-back process attempts to contact all customers with open trouble tickets at the time the company believes that it has restored power. If pockets of customers remain without power, the utility may redeploy assessors to investigate and submit supplemental damage reports. a. Outage Management Systems CL&P installed its outage management system, Electronic Dispatching System (EDS), in 2004. EDS (Oracle Network Management System) is a detailed network model of the distribution system. Electrical connectivity is provided from the Geographic Information System (GIS) that is the source of this network model. The system combines the locations of outage calls from customers, and uses a rules engine to predict the locations of outages. While it upgraded EDS in 2007, CL&P is not running the most current version of the software. CL&P’s outage management system was fully functional during both events and performed well to provide trouble spot predictions and track asset conditions as well as predict customers affected. CL&P used EDS in a decentralized mode, in that local operation of EDS was handled within the AWCs (Area Work Centers) or within a Satellite location. EDS is operated to reflect the status of jobs and the data is used to create work pages to assign to crews within the AWC or Satellite. The following can initiate electric trouble orders in the EDS: • Customers calling the company’s call center representatives • Customers self-reporting trouble through the Interactive Voice Response system • Customers self-reporting trouble through the high-volume overflow Interactive Voice Response system • Customers self-reporting trouble through the company’s website or mobile app • Dispatchers can manually create outage orders. EDS’s analyzer module interprets each outage call and creates outage trouble spots that are associated or “tagged” to a likely electrical device, such as a transformer. CL&P’s distribution electrical connectivity model groups devices using relational database tables that create the link for customers to transformers, transformers to fuses or other protective devices, devices to circuits, and so forth. As new trouble reports arrive, the system continues conditional grouping of devices automatically. EDS also provides tracking of the status of system isolating devices, i.e. switches, breakers and fuses that may be open and which are closed, network tracing functions can be used to identify customers affected. April 16, 2012 The Liberty Consulting Group page 116
  4. Page 120 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 120 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 EDS information is readily available to Call Center Representatives, the Interactive Voice Response systems, CL&P’s website, dispatchers, and any CL&P field or office employee that has access and has been trained to use the system. Most utilities rely on outbound notification or callbacks to verify power restoration. During large outages there are often numerous trouble spots along a single circuit or part of a circuit. As circuits or portions of circuits are repaired, trouble tickets associated with that circuit are closed in the outage system. Power may still be off at a particular location, but since the tickets were closed by the outage system, the utility will not know that power is still off unless the customer calls back (or the utility can ping an automated meter). Most outage systems are configured to trigger automatic callbacks upon closure of the outage ticket. In non-storm conditions, this approach generally works very well. However, during a large storm restoration priorities often negate the effectiveness of automatic callbacks. In addition, foreign crews and other supplemental crews may not have access to the outage system to update orders as they are worked resulting in a delay in closing orders, often until very late in the evening. Automatic callbacks are often disabled simply to avoid calling customers in the middle of the night. NU’s outage callback system was disabled during both storms, primarily to avoid customer confusion. Instead, during the October snowstorm CL&P conducted a number of controlled outbound calling campaigns targeted to specific areas identified by EOC EDS analysts to:163 • Single services identified as power-out in EDS (Saturday, November 5, 2011) • Residents of 13 towns (with >5000 outages) (Saturday, November 5, 2011) • Residents of 31 towns that wouldn’t reach 99 percent (Sunday, November 6, 2011) • Residents of 20 towns to confirm power restored (Monday, November 7, 2011) • Residents of 40 towns to confirm power restored (Tuesday, November 8, 2011) • Residents of 30 towns to confirm power restored (Wednesday, November 9, 2011) However, the callback process whether automatic or controlled can be confusing to customers, even anger customers who are still without power after many days. Additionally, contact center representatives have to be prepared to handle calls from the customers that were contacted that are still without power. EDS issues encountered during the 2011 storms included:164 • On August 28, 2011, EDS temporarily disconnected the user session. After recycling, EDS recovered resulting in an automatic reconnect of most users. • On August 29, 2011, EDS was reaching a memory limitation. IT took steps to increase memory allocations, but during this effort EDS unexpectedly shut down. EDS was immediately restarted with increase memory, however users were without EDS for 15 minutes. • Additionally, management limited access to EDS to avoid similar memory limitations. 163 164 Response to Witt-044. Response to AG-095. April 16, 2012 The Liberty Consulting Group page 117
  5. Page 121 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 121 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • During the October snowstorm, EDS was unresponsive and had to be restarted on November 6, 2011, leaving it unavailable for about 30 minutes. In addition to the lack of preparedness of employees, CL&P also failed to identify “critical customers” in EDS prior to either storm. As a result, each division had to identify and prioritize critical customers on their own as the storm progressed. CL&P has since created a list of critical customers but it has not been incorporated into EDS. Otherwise, the performance and reliability of CL&P’s outage management system during the 2011 storms was generally good. EDS was fully operational during both storms, except during brief periods of preemptive maintenance. b. Estimated Restoration Times Another role of outage systems is to provide estimates for the time of restoration. Estimated Restoration Times (ERTs) are a critical information component of the restoration process. Customers, government officials, and the public want to understand how long the outage will last. This information is basic to determining if alternate housing will be necessary and helps residents and businesses make the appropriate plans for dealing with an extended outage. It is to the company’s benefit to derive ERTs in order to determine better the level of resources required to restore the electrical system. The absence of Estimated Restoration Times (ERTs) can generate a significant response from customers and the public, in the form of phone calls, web site visits, and contact with government officials to try to find out something, anything about the outage. The longer the company proceeds without ERTs, the more frantic and disgruntled customers will become trying to contact the company. However, offering Estimated Restoration Times (ERTs) that are grossly inaccurate can cause more damage than not offering ERTs. Inaccurate ERTs foster distrust and the perception of incompetence. For day-to-day operations, CL&P’s outage management system calculates event-level Estimated Restoration Time based on area, order type, and active order volume. EDS uses historical outage records and predefined rules to create an initial Estimated Restoration Times for each event. Field personnel can turn off the automatic assignment of event-level ERTs at any point. In fact, EDS provides the capability to turn off auto-ERTs by circuit, town, district, or division. Generally, CL&P disables auto-ERTs at the division-level during a large storm. It did so well before storm Irene arrived. During the October snowstorm, however, it did not turn off the autoERT until the storm was underway. Consequently, customers calling during the snowstorm, before the disabling of auto-ERT received an auto-ERT. CL&P has the capability to issue four levels of ERT projections—event-level, district, divisional, and global. During both storms, CL&P delivered a global announcement to customers in the first few days, via the phone system, to let customers know that ERTs would not be available until it completed the damage assessment process. Once damage assessment was complete, CL&P’s EOC Support Staff, under the direction of the Area Commander, prepared restoration projections at the company and district level. The Incident Commander, Area Commander, and the Public April 16, 2012 The Liberty Consulting Group page 118
  6. Page 122 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 122 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Information Officer approved all district-level projections and messages prepared during the storms.165 The town-level projections used in storm Irene were created and maintained in a separate process from EDS and did not necessarily reconcile. Town-level projections were created manually through research and discussion with operations personnel, town liaisons, and town emergency personnel, as part of the process to create a plan of the day for each town. In between the two storms, CL&P started working on a website to facilitate the delivery of townlevel projections. It was still in development during the snowstorm, but has since been rolled-out. The website translates EDS circuit-level outage data into zip codes and towns. CL&P has prepared other tools that pull information from EDS to the town-level that will be helpful in communicating restoration status to town emergency personnel and community leaders, include: • Web-based town maps with critical loads—maps detailing circuits and critical infrastructure facilities (Fire, EOC, Hospitals, Police, Sewage Treatment, Substations…) • Town-event maps detailing customers served and customers out by town. Event maps also let users zoom-in to see trouble-spot details. Maps also have the ability to overlay GPS locations of crews. CL&P has established storm procedures to “Ensure Timely and Accurate Information for CL&P/WMECO Customer and Employees During and After Distribution System Trouble and Outage Events” 166 (see the following diagram). During a storm or blue-sky outage, response crews call in outage conditions and estimates on restoration to dispatchers after they have arrived on site and investigated. Additionally, they are required to contact dispatch as soon as they realize they are unable to meet the target. However, during both 2011 storms, for many reasons, the vast majority of outage tickets were closed after company and foreign crews returned for the day, without entering ETRs or restoration status information. This created a delay in the outage information flow, up to 12 hours in some cases. 165 166 Response to AG-100. Response to Liberty-103. April 16, 2012 The Liberty Consulting Group page 119
  7. Page 123 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 123 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 While the above process does work well to update EDS restoration status during blue-sky or normal outages, it is not scalable in a large storm, for several reasons: • Damage assessment process in large storms relies heavily on mobile patrols. In the 2011 storms, as many as 100 patrol teams were assigned to damage assessment. Only one in five of these teams had the ability to relay real-time conditions, and even then, cell towers were not functioning well in all areas. As a result, an inordinate number of handwritten damage assessment patrol reports had to be manually entered into EDS as event details, which was time consuming and created backlogs in the AWCs.167 In many areas, patrol information was not updated until after the close of the shift. This delayed the process that CL&P used to project restoration estimates. • Once restoration was underway, restoration information was not updated in EDS, in many cases, until well after the crews were finished for the day. Similar to the patrol reports, handwritten trouble-order completion information had to be manually reconciled and reflected in EDS, which was time consuming and created backlogs in the AWCs. This delayed the communications of restoration progress. • EDS was not able to provide town-level projections, thereby making it necessary to maintain town-level projections through a separate manual process. 167 Response to AG-035_SP-01, page 13. April 16, 2012 The Liberty Consulting Group page 120
  8. Page 124 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 124 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • • Call takers, who normally access EDS on a daily basis to answer customer inquiries, were instructed to ignore EDS trouble order information and to rely instead on talking points and town-level restoration projections assembled outside of EDS. Many of the outage tickets created through TFCC (high-volume IVR) were rejected, requiring special handling and manual entry, hours to a day later. This delayed outage ticket creation for these accounts in EDS. CL&P needs to develop a process to enable real-time field updates of EDS trouble order information, such as damage assessment and restoration progress, including estimated restoration times. c. Communicating Outage Information CL&P has leveraged its public website to provide outage-related information to customers and website visitors through its Storm Center. Customers can review general information on CL&P’s storm response, emergency preparedness, find out what number to call to report an outage, report an outage through the website, view a map of current outages, and view individual account outage status. The figure below provides a sample from CL&P’s outage mapping website.168 On Friday, August 26, 2011, before the storm, NU created a webpage in the Storm Center specifically for Hurricane Irene that included messages, public service announcements, videos, a news release feed, a Twitter feed, as well as links to NU’s YouTube, Twitter, and Facebook Accounts. NU updated this page frequently during the storm. Additionally, a large Hurricane Irene graphic was on CL&P’s home page to direct visitors to the Hurricane Irene page. It added other links to the “What’s New” section on the home page during the storm to direct visitors to 168 cl-p.com April 16, 2012 The Liberty Consulting Group page 121
  9. Page 125 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 125 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 information about the storm including My Outage Status, Restoration Estimates, and instructions for receiving outage updates by text message. Several items were posted to the website following Hurricane Irene, including: • A thank you to customers (audio and PD) • Company testimony and presentation for the legislative hearings • Video recap of the CL&P response During storm Irene, customers accessed CL&P’s outage maps and mobile outage reporting the most frequently: Webpage Outage Maps Outage Mobile Hurricane Irene Estimated Restoration Times by Area Estimated Restoration Times by Town Storm FAQs Storm Response Storm Preparedness Before/After a Storm Views 1,540,726 590,002 143,442 66,476 43,484 2,102 1,237 966 918 However, CL-P.com did not hold up to the high volumes accessing the site during storm Irene. On August 28, 2011, when the website was experiencing unprecedented use of the outage map, website response was slow. To resolve this issue, CL&P moved its outage map to an externally hosted site with more bandwidth.169 In response to the October snowstorm, CL&P added a large graphic and a paragraph about the snowstorm on its home page, similar to what it did during storm Irene. In addition, it added several links to the “What’s New” section of the homepage to direct customers to storm specific information. On October 31, CL&P created a page specifically for the October snowstorm, including key messages, videos, new releases, a Twitter feed, and links to YouTube, Twitter, and Facebook accounts. It updated this page continually throughout the storm. On November 1, CL&P added a page listing restoration estimates. Several days later, it added another page with a video depicting the restoration process. During the October snowstorm, website traffic peaked on November 1, 2011, with 3.2 million page views. CL&P’s Outage Maps, Website Outage Reporting and Mobile Outage Reporting were accessed the most frequently as seen in the table below:170 169 170 Response to AG-095, page 6. Response to CSU-038. April 16, 2012 The Liberty Consulting Group page 122
  10. Page 126 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 126 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Webpage Outage Maps Report an Outage Outage Mobile CL&P Homepage Estimated Restoration Times Storm Center October Snow Storm Storm Response Storm FAQs Storm Preparedness Before/After a Storm Views 5,142,049 4,477,630 3,071,201 2,761,391 502,418 163,967 30,714 4,878 2,102 2,052 918 CL&P encountered similar website response issues during the October snowstorm. As seen in the following graph, unprecedented demand stressed NU’s websites from October 29 through November 4, creating slow response and time-outs. The following chart depicts bandwidth use on NU’s two Internet links that handle internal and external Internet traffic. As in storm Irene, CL&P moved its outage map to an externally hosted website with more bandwidth on October 29, 2011. PSNH and WMECO’s outage maps were also moved to the external site the following day. Several days later, CL&P’s Mobile Interface moved to the external hosted site to reduce website traffic. Additional static contact also moved to alleviate bandwidth traffic on November 2. April 16, 2012 The Liberty Consulting Group page 123

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026