Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 137 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 137 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 From Sunday, August 29 to Monday, August 30, it was determined that accurate restoration times were not available due to the severity of the storm. UI placed a message sharing this information on its IVR system to be heard as soon as the customers called in. The intent of this message was to minimize any inconvenience to customers who were calling in for restoration times. From Tuesday, August 31 through Saturday, September 3, restoration times were available for some customers and the IVR message was updated accordingly.187 The above chart details the peak staffing for each day of Tropical Storm Irene. UI’s CCC was able to secure considerable staffing to handle incoming calls during the storm, especially coverage over the initial weekend.188 Following the storm, UI conducted a final outbound calling campaign to all customers: This is a message from The United Illuminating Company, to our valued customers. On Sunday August 28th, the State of Connecticut experienced one of the worst weather events since Hurricane Gloria in 1985. As New Englanders we demonstrated our resolve and resilience when federal, state, and local government agencies partnered with the state utilities to clear streets and restore power. On behalf of the more than eighteen hundred employees of The United Illuminating Company, The Southern Connecticut Gas Company, Connecticut Natural Gas Corporation and The Berkshire Gas Company we would like to extend our gratitude to our customers for their understanding and cooperation during the recovery period.189 In retrospect, UI’s contact center struggled throughout the storm, even with near-peak staffing in place before the storm hit. Many customer calls were blocked due limited capacity in the Customer Care Center and the lack of an overflow IVR provider. Additionally, many customers experienced long wait times to speak with a CSR. 187 Response to CSU-1 Response to CSU-002. 189 Response to OCC-147. 188 April 16, 2012 The Liberty Consulting Group page 134
  2. Page 138 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 138 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 October Snowstorm Response UI did not have as much time to prepare for the October snowstorm. Customer Care participated in a storm planning call at noon on Friday, October 28, 2011. Starting Friday afternoon, UI began to supplement staffing for the weekend. It added 15 CSRs to the normal Saturday afternoon schedule. The Company did not place any outbound calling campaigns to medical customers prior to the October 29 snowstorm.190 On Saturday afternoon, management began the call in process for additional Customer Care resources when call volumes climbed. Management had difficulties securing enough additional CSRs. It made the decision to call in employees as the number of outages climbed and conditions worsened. Unfortunately, worsening conditions also made it challenging for employees to get to the contact center. As a result, the UI’s Customer Care Center’s staffing levels were at their lowest during the highest volume of calls. Many customers experienced busy signals. Those able to get through waited on average 15 minutes to get to an agent.191 Once the Customer Care management team had exhausted its resources, it reached outside the department to secure additional resources (union and management personnel). Management continued to call in employees on Sunday night in an effort to secure resources for Monday morning. Long wait times were experienced again on Sunday morning, with an average wait ranging from 15 to 30 minutes. Customers also received busy signals as UI’s incoming telephone trunks filled up. On Monday, UI was finally able to fully staff the Customer Care Center. Ramping up to full staffing proved to be a lengthy and onerous process. UI assigned employees to rotating 12-hour schedules for the week to ensure 24x7 coverage throughout the storm. An internal Storm Center Hotline number was also established in the EOC to assist with escalated calls.192 190 Response to OCC-147. Response to AR-Liberty-48. 192 Response to AR-Liberty-48. 191 April 16, 2012 The Liberty Consulting Group page 135
  3. Page 139 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 139 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 UI’s Customer Care Center did not reach peak staffing until the 3rd day of the storm. The following upfront message played to alert callers to the storm and possible long wait times during the first two days of the storm193: We are aware of the many outages in the area due to the storm, and are currently experiencing longer than normal wait times to speak to a representative. We appreciate your understanding and patience during this time. Please stay on the line if you are calling to report an emergency or if your call is of an urgent nature. Thank you. As with storm Irene, UI closed for normal business on Monday as it focused on storm damage assessment and restoration efforts. This included suspending service disconnects and instructing CSRs to handle only emergency calls. The Contact centers returned to full operations on Wednesday, November 2. On Saturday and Sunday, UI had received 38,000 customer calls. By the end of the storm, UI’s Customer Care Center CSRs handled nearly 20,000 calls, with an average speed of answer of 216 seconds. An additional 35,000 calls self-served in UI’s IVR.194 However, more than 14 percent of callers abandoned over the course of the storm, with the heaviest abandoning on Saturday, the first day of the storm.195 In addition, many UI customers encountered busy signals throughout the October snowstorm. Callers received more than 150,000 busy signals over the course of the storm, many more than actually got through to the company on the first two days of the storm, as depicted by the line on the following chart.196 193 Response to OCC-157. Response to CSU-20. 195 Response to CSU-19-1.xls. 196 Response to CSU-2-1.xls. 194 April 16, 2012 The Liberty Consulting Group page 136
  4. Page 140 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 140 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Call answering performance, as defined by wait time, also suffered during the first two days of the storm197 Shortly following storm Irene, UI contracted with a third party to survey residential customers regarding their experiences with UI during the storm. More than 86 percent surveyed “strongly agreed” or “somewhat agreed” that UI worked very hard to restore power as soon as possible following the storm. Seventy-five percent were either “very satisfied” or “somewhat satisfied” with UI’s handling of customers during the storm. Of those not satisfied, 39 percent indicated they would have liked power back sooner, 23 percent expressed difficulties communicating with the company, and 11 percent sited a lack of restoration estimates. Only half of respondents 197 Response to CSU-20. April 16, 2012 The Liberty Consulting Group page 137
  5. Page 141 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 141 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 reported being “very aware” or “somewhat aware” of restoration priorities for UI when an outage occurs.198 UI’s Customer Care Center has several opportunities to improve operations so that it is better prepared to handle customer calls in future large outage events. Liberty discusses these opportunities in the Recommendations section at the end of this section. 2. Corporate Communications In the days leading up to storm Irene, UI held internal meetings with its storm team and within communications specifically to begin planning communications strategies based on the storm track and its potential impact on UI’s service territory. Once it was clear that customers would be affected, UI immediately began implementing its communications strategy. Prior to and during Irene, UI proactively reached out to the media and public with customerfocused communications, such as news releases, public service announcements, and social media posts. At the same time, the Customer Care Center organization initiated several automated prerecorded calling campaigns to notify customers of pre-storm preparations, safety, and medical guidance. UI also provided half-day safety presentations at the New Haven Regional Fire Training Academy during the week before the storm, to refresh first responder safety around downed wires and other electrical equipment.199 During the storm, the Company held joint press conferences with CL&P and participated in Governor Malloy’s press briefings. UI’s media hotline was open and company representatives provided media interviews as requested. UI issued 14 news releases prior to and during Irene and responded to 106 media inquiries, including 32 interviews on the first day of the storm.200The following table lists the news releases prior to and during the storm:201 Date August 25 August 26 August 28 August 28 August 29 August 29 August 30 Title As Hurricane Irene Approaches, UIL Holdings Corporation Helps Customers Prepare Storm Checklist & Preparation Tips UIL Holdings Corporation Urges Customers to Put Safety First as Hurricane Restoration Efforts Get Under Way UIL Holdings Corporation Continues Restoration Efforts UIL Holdings Corporation Expects Significant Progress with Post‐Hurricane Restoration Efforts Monday UIL Holdings Corporation Post‐Hurricane Restoration Update The United Illuminating Company Reports More Progress; Estimated Restoration Times Discussed 198 Response to AR-Liberty-31-1. uinet.com website, August 25, 2011 Press Release. 200 Response to CSU-8. 201 uinet.com website. 199 April 16, 2012 The Liberty Consulting Group page 138
  6. Page 142 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 142 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 August 31 September 2 September 2 September 2 September 3 September 5 September 4 UI Hopeful Outages Can Be Reduced to 10,000 during the Weekend The United Illuminating Company Announces $50,000 in Relief Grants UI Expects to Restore Virtually All Remaining Outages this Weekend Outage Numbers Continue to Drop as CL&P and UI Push Restoration Efforts UI’s Restoration Efforts Nearing Completion Major Restoration Complete for UI An Open Letter to Our Customers On September 20, UI issued a press release to announce results of a residential post-storm survey. Nearly three-quarters of survey respondents reported hearing or seeing media reports or information about the progress of storm restoration, including the number of customers without power, however only 38 percent reported the media impacts had a “positive impact” while another 34 percent indicated the media reports had “no impact, but perception remained good.” When asked how respondents preferred to be contacted by UI during a storm, nearly 60 percent indicated by phone. Radio and TV were the next preferred channels, followed by text messaging and emails.202 Since the March 2010 storm, UI took steps to strengthen its customer and media communications:203 • UI hired a new Director of Corporate Communications in June 2010. • New processes were put in place to manage media relations • Additional communications strategies were developed to communicate to customers and the public. • UI delivered more targeting storm preparation and safety information messaging to customers through its monthly billing inserts. UI’s storm communications plan is integrated into the UI Emergency Preparedness Plan. Several subsections of the EPP address emergency communications, communications preparedness, and public communications. Specific elements and processes of the communications plan are referenced in Appendix 4, Liaison and Appendix 3, Public Information. The plan includes lines of authority, roles and responsibilities, procedural checklists, matrices to guide incident-level communications and recommended staffing levels for each storm duty role based on the severity of the storm. Sample communications log forms are also included as well as recommended equipment, tools, and supporting systems, scaled to the storm severity. Additionally, UI embeds more than a dozen communications professionals in the UI Storm Center during a large storm, including:204 • Two Liaison Team Leaders: responsible for all communications activities and coordination with public agencies and the media. • Six Municipal Liaison Team Coordinators: responsible for coordinating communication among the municipal liaisons. 202 Response to AR-Liberty-2. Response to AG-12. 204 Response to AG-149. 203 April 16, 2012 The Liberty Consulting Group page 139
  7. Page 143 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 143 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • • • Two Major Account Coordinators: responsible for all communications with major accounts. Two PURA Representatives: communications with PURA Four additional State EOC Liaisons report directly to the State EOC. While UI issued press releases on a daily basis, the releases did not communicate restoration estimates until very late in the storm when it had already restored 97 percent of customers. This placed pressure on other communications channels, such as the contact center, website, and social media to provide more detailed estimates. The following table summarizes the message presented in each release, as well as the projected restoration times. August 28 August 28 August 29 August 29 August 30 Message in News Release 30,000 out and growing 106,973 out 105,166 out 99,268 out 82,985 out 60,772 out August 31 September 2 September 2 Storm fund donation, 21,872 out 20,825 out UI 22,000 out September 2 CL&P 148,000 out September 3 September 5 September 4 September 6 97% restored, 8,861 out 99.8% restored Thanks 100 out Anticipated Restoration Date No estimate No estimate No estimate ERTs by Tuesday ERTs by Wednesday Down to 50,000 by Wednesday, 10,000 during weekend No estimate All by end of weekend UI: down to 10,000 by Saturday Morning CL&P: down to 100,000 by Saturday at midnight End of Sunday Restoration complete Restoration complete No estimate Following storm Irene, UI’s Storm Communications Plan was changed to stress the importance of regular daily briefings with all town and elected officials (local and state), to provide as much information as possible to the towns, and to indicate street locations where crews would be working the next day.205 UI implemented its Storm Communication Plan as designed during the October snowstorm.206 UI’s contact with public officials and emergency first responders regarding the October snowstorm first began on Friday, October 28, 2011, during the pre-storm planning call. UI developed staffing plans to man State and Federal EOCs. The Municipal Liaison Coordinator notified Municipal Liaisons to be on the alert for the opening of any municipal EOCs and all 17 municipalities were notified of the opening of UI’s Storm Center, along with details regarding 205 206 Response to AG-148. Response to AG-148. April 16, 2012 The Liberty Consulting Group page 140
  8. Page 144 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 144 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 weather forecasts, call center extended hours, number of crews on standby, and other critical information.207 UI issued an initial media release on restoration progress within 24 hours of the event. UI reported the number of customers out as of 9 am and had already reported restoration activity results. It posted this information on the external and internal websites and provided it to the Customer Care Center. This was followed by two additional media releases on progress and the completion of restoration efforts. On Saturday, all municipalities were again notified of UI’s planned storm response and UI’s Major Customer Hotline was transferred to the Major Account Coordinator for the remainder of the storm. UI continued to communicate to municipalities as the storm worsened and as information was received from state and local emergency officials. By 5 pm on Saturday, UI’s communication team was receiving reports from municipalities that residents were having trouble getting through to UI’s call center.208 On Sunday afternoon, UI notified municipalities that it expected to have most customers restored by midnight on Monday. At 6 pm, municipalities were provided status reports detailing the restoration effort in their towns, including street locations where UI crews will be working to restore power on Sunday evening and Monday morning. This information was updated and sent out again on Monday morning, at noon, and late Monday afternoon. At 8:30pm, UI notified municipalities that additional outages were reported making it unlikely that UI would restore all service on Monday evening. UI released a new estimate to have most customers restored by Tuesday evening. By midnight Monday, 1.57 percent of customers were without power. UI continued to send two to three daily status reports to municipalities affected by the storm until full service was restored on Wednesday.209 UI’s first press release was on Sunday, October 30, 2011, announcing that restoration was underway:210 Date Title UI Reports Progress Restoring Customers after Autumn Nor’easter October 30 Electric Service Restored to Nearly 45,000 UI Customers October 30 November 2 UI Announces Major Restoration Efforts Complete The following table summarizes the news releases issued during the storm:211 Message in News Release Anticipated Restoration Date 18,751 out No estimate October 30 8,274 out October 31 Nearly all by Midnight November 2 Restoration Complete Complete 207 Response to OCC-146. Response to OCC-146. 209 Response to OCC-146. 210 uinet.com website. 211 Uinet.com website. 208 April 16, 2012 The Liberty Consulting Group page 141
  9. Page 145 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 145 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 In addition to the distribution of media releases during the October snowstorm, the Communications Storm Team responded to 14 media inquiries212 and responded to requests for TV, radio, electronic, and print interviews. UI also used Facebook, Twitter, and YouTube to post multiple messages to customers and the public.213 Corporate Communications effectively coordinated with other groups to gather and disseminate storm restoration information. Corporate Communications was an active participant in EOC conference calls, and it took control of the “storm message” for the company. When possible it pressed Operations for anticipated restoration times and worked closely with Municipal Liaisons to gather town-specific information. UI Corporate Communications took advantage of traditional and non-traditional communications outlets during both storms. 3. Community Relations At UI, the community relations responsibility generally falls to the Account Management team, reporting to UI Strategic Account Services. Account managers are assigned geographical areas to serve. They generally live within or close-by their territories and become very familiar with the needs and concerns of their municipal and business constituents. Account managers normally attend city events and planning meetings, community leader meetings, and any franchise and rates meetings. Other participation includes local community leader clubs, school boards, and charities, with a goal of establishing a company presence in the local community. UI account managers will contact key accounts and municipalities in the likely event of a storm affecting their service territory. Storm updates are provided several times a day to keep municipal and emergency officials apprised of the restoration effort. In the event the municipality opens its EOC during a storm, UI provides a municipal liaison to work directly with the EOC and the municipal officials. UI has designed the program such that one municipal liaison is dedicated to each town or city, year over year, to develop relationships, experience, and consistency in the storm restoration process. UI has also identified a backup pool of trained municipal liaisons that can be assigned if necessary to ensure coverage. UI’s municipal liaison program was put into place in 2010. UI’s Emergency Preparedness Plan dedicates a section to the Municipal Liaison program. Specific elements and processes are referenced in Appendix 4, Liaison. The plan includes lines of authority, roles and responsibilities, a process overview, procedural checklists, and recommended staffing levels for each storm duty role based on the severity of the storm. Recommended equipment, tools, and supporting systems are also detailed, based on storm severity. Municipal liaisons, available on a 24x7 basis, provides a direct communications link between the UI Storm Center and the towns to help address specific issues and relay restoration status progress.214 Municipal liaisons work with municipalities to address trouble locations and areas of concern. UI municipal liaisons also communicate special situations and requests to ensure that 212 Response to CSU-23. Response to AG-150. 214 Response to CSU-3. 213 April 16, 2012 The Liberty Consulting Group page 142
  10. Page 146 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 146 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 UI is aware of the status of critical facilities and can respond in a prioritized manner to outages at these locations. UI municipal liaisons are provided with hourly EOC updates on the condition of their town and relay updates to municipal officials as needed. UI’s Municipal Liaison Team Coordinator is positioned in the EOC during a storm to assist with the communications between the EOC and municipal liaisons. In the EOC, the Municipal Liaison Team Coordinator has direct contact with the Liaison Leader and the Incident Commander. On a semi-annual basis, account managers and assigned municipal liaisons meet with their respective municipal officials to foster a relationship, to update key infrastructure priorities, and to review UI’s emergency response plans. Municipal liaisons also participate in annual training, Emergency Preparedness Plan (EPP) drills and After Action Reviews. Municipal liaisons also attend UI sponsored training seminars for municipal officials and participate in municipal EOC training exercises.215 In August 2010, UI hosted a storm response related informational breakfast for all of its municipal customers. Municipal liaisons also attended this breakfast. Account managers, electric system managers, the manager of restoration, and other UI managers were also presenting at the breakfast and available to meet with municipal customers. A host of topics was covered including UI’s storm restoration process and priorities, storm safety, and OMS capabilities.216 The Commissioner of the State of Connecticut Department of Emergency Management Homeland Security also presented an overview of the State’s Hurricane Preparedness Plan. More than 150 individuals from all 17 municipalities attended the meeting.217 It provided refresher training for Municipal Liaisons on June 17, 2011 and June 23, 2011. More than 60 employees participated in this training.218 Timing of the training was good. Municipal Liaisons were well prepared when Tropical Storm Irene made landfall. UI implemented its communication plan and applied it during pre-storm planning for Irene when the Municipal Liaison Team Coordinators first informed their assigned towns of UI’s contingency plans regarding the storms. Municipal Liaisons worked with towns, supporting the restoration effort, until all customers were restored. After Irene, UI held meetings with the Municipal Liaison Team Coordinators, Account Managers, and Municipal Liaisons for all 17 municipalities beginning on September 12, 2011. UI Executives also met with Town Officials in all 17 municipalities to assess the Municipal Liaisons process and identify areas where communication can be improved.219 Lessons learned regarding the municipal liaison program:220 215 Response to CSU-32. Response to AG-8-1. 217 Response to CSU-33. 218 Response to AG-152. 219 Response to AG-146. 220 Response to EL-9. 216 April 16, 2012 The Liberty Consulting Group page 143

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026