Interrogatory responses
Answers to questions 379, 380, 381, 382, 383
Files11
EOE-379_Final.pdf
PDF · 181 KB · 5 pagesText searchable
Download EOE-379_Final.pdfRead the text of EOE-379_Final.pdf
EOE-379 Attachment 1.pdf
PDF · 1.2 MB · 2 pagesText searchable
Download EOE-379 Attachment 1.pdfRead the text of EOE-379 Attachment 1.pdf
EOE-380_Final.pdf
PDF · 96 KB · 3 pagesText searchable
Download EOE-380_Final.pdfRead the text of EOE-380_Final.pdf
EOE-381_Final.pdf
PDF · 89 KB · 2 pagesText searchable
Download EOE-381_Final.pdfRead the text of EOE-381_Final.pdf
EOE-382_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download EOE-382_Final.pdfRead the text of EOE-382_Final.pdf
EOE-383_Final.pdf
PDF · 133 KB · 4 pagesText searchable
Download EOE-383_Final.pdfRead the text of EOE-383_Final.pdf
EOE-383 Attachment 1.pdf
PDF · 1.3 MB · 125 pagesText searchable
Download EOE-383 Attachment 1.pdfRead the text of EOE-383 Attachment 1.pdf
EOE-383 Attachment 2.pdf
PDF · 3.5 MB · 182 pagesText searchable
Download EOE-383 Attachment 2.pdfRead the text of EOE-383 Attachment 2.pdf
EOE-383 Attachment 3.pdf
PDF · 3.5 MB · 55 pagesText searchable
Download EOE-383 Attachment 3.pdfRead the text of EOE-383 Attachment 3.pdf
EOE-383 Attachment 4.pdf
PDF · 715 KB · 2 pagesText searchable
Download EOE-383 Attachment 4.pdfRead the text of EOE-383 Attachment 4.pdf
EOE-383 Attachment 5.pdf
PDF · 730 KB · 7 pagesText searchable
Download EOE-383 Attachment 5.pdfRead the text of EOE-383 Attachment 5.pdf
Text of EOE-381_Final.pdf
Extracted from the file · 2 pages · 3,490 characters
Text of EOE-382_Final.pdf
Extracted from the file · 1 page · 2,648 characters
Text of EOE-383_Final.pdf
Extracted from the file · 4 pages · 10,383 characters
Text of EOE-383 Attachment 1.pdf
Extracted from the file · 125 pages · 401,903 characters
Page 143 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 143 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • • • Two Major Account Coordinators: responsible for all communications with major accounts. Two PURA Representatives: communications with PURA Four additional State EOC Liaisons report directly to the State EOC. While UI issued press releases on a daily basis, the releases did not communicate restoration estimates until very late in the storm when it had already restored 97 percent of customers. This placed pressure on other communications channels, such as the contact center, website, and social media to provide more detailed estimates. The following table summarizes the message presented in each release, as well as the projected restoration times. August 28 August 28 August 29 August 29 August 30 Message in News Release 30,000 out and growing 106,973 out 105,166 out 99,268 out 82,985 out 60,772 out August 31 September 2 September 2 Storm fund donation, 21,872 out 20,825 out UI 22,000 out September 2 CL&P 148,000 out September 3 September 5 September 4 September 6 97% restored, 8,861 out 99.8% restored Thanks 100 out Anticipated Restoration Date No estimate No estimate No estimate ERTs by Tuesday ERTs by Wednesday Down to 50,000 by Wednesday, 10,000 during weekend No estimate All by end of weekend UI: down to 10,000 by Saturday Morning CL&P: down to 100,000 by Saturday at midnight End of Sunday Restoration complete Restoration complete No estimate Following storm Irene, UI’s Storm Communications Plan was changed to stress the importance of regular daily briefings with all town and elected officials (local and state), to provide as much information as possible to the towns, and to indicate street locations where crews would be working the next day.205 UI implemented its Storm Communication Plan as designed during the October snowstorm.206 UI’s contact with public officials and emergency first responders regarding the October snowstorm first began on Friday, October 28, 2011, during the pre-storm planning call. UI developed staffing plans to man State and Federal EOCs. The Municipal Liaison Coordinator notified Municipal Liaisons to be on the alert for the opening of any municipal EOCs and all 17 municipalities were notified of the opening of UI’s Storm Center, along with details regarding 205 206 Response to AG-148. Response to AG-148. April 16, 2012 The Liberty Consulting Group page 140Page 144 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 144 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 weather forecasts, call center extended hours, number of crews on standby, and other critical information.207 UI issued an initial media release on restoration progress within 24 hours of the event. UI reported the number of customers out as of 9 am and had already reported restoration activity results. It posted this information on the external and internal websites and provided it to the Customer Care Center. This was followed by two additional media releases on progress and the completion of restoration efforts. On Saturday, all municipalities were again notified of UI’s planned storm response and UI’s Major Customer Hotline was transferred to the Major Account Coordinator for the remainder of the storm. UI continued to communicate to municipalities as the storm worsened and as information was received from state and local emergency officials. By 5 pm on Saturday, UI’s communication team was receiving reports from municipalities that residents were having trouble getting through to UI’s call center.208 On Sunday afternoon, UI notified municipalities that it expected to have most customers restored by midnight on Monday. At 6 pm, municipalities were provided status reports detailing the restoration effort in their towns, including street locations where UI crews will be working to restore power on Sunday evening and Monday morning. This information was updated and sent out again on Monday morning, at noon, and late Monday afternoon. At 8:30pm, UI notified municipalities that additional outages were reported making it unlikely that UI would restore all service on Monday evening. UI released a new estimate to have most customers restored by Tuesday evening. By midnight Monday, 1.57 percent of customers were without power. UI continued to send two to three daily status reports to municipalities affected by the storm until full service was restored on Wednesday.209 UI’s first press release was on Sunday, October 30, 2011, announcing that restoration was underway:210 Date Title UI Reports Progress Restoring Customers after Autumn Nor’easter October 30 Electric Service Restored to Nearly 45,000 UI Customers October 30 November 2 UI Announces Major Restoration Efforts Complete The following table summarizes the news releases issued during the storm:211 Message in News Release Anticipated Restoration Date 18,751 out No estimate October 30 8,274 out October 31 Nearly all by Midnight November 2 Restoration Complete Complete 207 Response to OCC-146. Response to OCC-146. 209 Response to OCC-146. 210 uinet.com website. 211 Uinet.com website. 208 April 16, 2012 The Liberty Consulting Group page 141Page 145 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 145 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 In addition to the distribution of media releases during the October snowstorm, the Communications Storm Team responded to 14 media inquiries212 and responded to requests for TV, radio, electronic, and print interviews. UI also used Facebook, Twitter, and YouTube to post multiple messages to customers and the public.213 Corporate Communications effectively coordinated with other groups to gather and disseminate storm restoration information. Corporate Communications was an active participant in EOC conference calls, and it took control of the “storm message” for the company. When possible it pressed Operations for anticipated restoration times and worked closely with Municipal Liaisons to gather town-specific information. UI Corporate Communications took advantage of traditional and non-traditional communications outlets during both storms. 3. Community Relations At UI, the community relations responsibility generally falls to the Account Management team, reporting to UI Strategic Account Services. Account managers are assigned geographical areas to serve. They generally live within or close-by their territories and become very familiar with the needs and concerns of their municipal and business constituents. Account managers normally attend city events and planning meetings, community leader meetings, and any franchise and rates meetings. Other participation includes local community leader clubs, school boards, and charities, with a goal of establishing a company presence in the local community. UI account managers will contact key accounts and municipalities in the likely event of a storm affecting their service territory. Storm updates are provided several times a day to keep municipal and emergency officials apprised of the restoration effort. In the event the municipality opens its EOC during a storm, UI provides a municipal liaison to work directly with the EOC and the municipal officials. UI has designed the program such that one municipal liaison is dedicated to each town or city, year over year, to develop relationships, experience, and consistency in the storm restoration process. UI has also identified a backup pool of trained municipal liaisons that can be assigned if necessary to ensure coverage. UI’s municipal liaison program was put into place in 2010. UI’s Emergency Preparedness Plan dedicates a section to the Municipal Liaison program. Specific elements and processes are referenced in Appendix 4, Liaison. The plan includes lines of authority, roles and responsibilities, a process overview, procedural checklists, and recommended staffing levels for each storm duty role based on the severity of the storm. Recommended equipment, tools, and supporting systems are also detailed, based on storm severity. Municipal liaisons, available on a 24x7 basis, provides a direct communications link between the UI Storm Center and the towns to help address specific issues and relay restoration status progress.214 Municipal liaisons work with municipalities to address trouble locations and areas of concern. UI municipal liaisons also communicate special situations and requests to ensure that 212 Response to CSU-23. Response to AG-150. 214 Response to CSU-3. 213 April 16, 2012 The Liberty Consulting Group page 142Page 146 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 146 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 UI is aware of the status of critical facilities and can respond in a prioritized manner to outages at these locations. UI municipal liaisons are provided with hourly EOC updates on the condition of their town and relay updates to municipal officials as needed. UI’s Municipal Liaison Team Coordinator is positioned in the EOC during a storm to assist with the communications between the EOC and municipal liaisons. In the EOC, the Municipal Liaison Team Coordinator has direct contact with the Liaison Leader and the Incident Commander. On a semi-annual basis, account managers and assigned municipal liaisons meet with their respective municipal officials to foster a relationship, to update key infrastructure priorities, and to review UI’s emergency response plans. Municipal liaisons also participate in annual training, Emergency Preparedness Plan (EPP) drills and After Action Reviews. Municipal liaisons also attend UI sponsored training seminars for municipal officials and participate in municipal EOC training exercises.215 In August 2010, UI hosted a storm response related informational breakfast for all of its municipal customers. Municipal liaisons also attended this breakfast. Account managers, electric system managers, the manager of restoration, and other UI managers were also presenting at the breakfast and available to meet with municipal customers. A host of topics was covered including UI’s storm restoration process and priorities, storm safety, and OMS capabilities.216 The Commissioner of the State of Connecticut Department of Emergency Management Homeland Security also presented an overview of the State’s Hurricane Preparedness Plan. More than 150 individuals from all 17 municipalities attended the meeting.217 It provided refresher training for Municipal Liaisons on June 17, 2011 and June 23, 2011. More than 60 employees participated in this training.218 Timing of the training was good. Municipal Liaisons were well prepared when Tropical Storm Irene made landfall. UI implemented its communication plan and applied it during pre-storm planning for Irene when the Municipal Liaison Team Coordinators first informed their assigned towns of UI’s contingency plans regarding the storms. Municipal Liaisons worked with towns, supporting the restoration effort, until all customers were restored. After Irene, UI held meetings with the Municipal Liaison Team Coordinators, Account Managers, and Municipal Liaisons for all 17 municipalities beginning on September 12, 2011. UI Executives also met with Town Officials in all 17 municipalities to assess the Municipal Liaisons process and identify areas where communication can be improved.219 Lessons learned regarding the municipal liaison program:220 215 Response to CSU-32. Response to AG-8-1. 217 Response to CSU-33. 218 Response to AG-152. 219 Response to AG-146. 220 Response to EL-9. 216 April 16, 2012 The Liberty Consulting Group page 143Page 147 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 147 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • • • • • • The volume of emergency calls from the municipal EOC through municipal liaisons was much higher than anticipated during the storms, making it challenging to communicate with UI’s Storm Center to track and update status of these calls. More than half of the towns served by UI had never opened an EOC prior to the storms. As a result, many of the critical infrastructure priorities had not been coordinated within the municipality and UI’s storm restoration process was new to them. Municipalities expressed a need to have more control on where UI crews would be working within their towns, including the need to coordinate with public works and tree removal crews. ERTs should be provided sooner. Many residents were calling the municipalities because they could not get through to UI’s Customer Care Center and the lack of ERTs, in addition to the inability to access storm information on UI’s website, was making it difficult for municipal officials to answer resident questions. Municipal officers would like more information from UI regarding the location of crews working within their town and information about the circuits that are out. A map with trouble spots would help towns direct police patrols and other services to the right locations. The Municipal Liaison program worked more smoothly during the October snowstorm. Municipal Liaisons had become very familiar with their towns during Tropical Storm Irene— they knew who to work with and how to help. In addition, UI incorporated some changes to the program as a result of the lessons learned following Irene. One important change was to provide towns with a list of the streets where crews would be working the following day. This helped towns better coordinate resources to support the restoration process. Storm Center personnel, Municipal Liaisons, and other UI employees spent considerable effort to gather storm and restoration status information affecting towns so that it could be shared with Towns/Municipalities, the Contact Center, and other stakeholders. UI was also challenged to manage the high volume of emergency calls logged at EOCs and communicated through MLs to the Storm Center (due to Contact Center accessibility issues). The challenge was made more difficult with the difficulties getting through to UI’s Customer Care Center, the lack of ERTs and storm status information, and the need to balance the needs of one town versus many. In addition, many town officials shifted priorities of critical facilities during the storms, making it necessary to shift field resources, further delaying restoration. 4. Communicating Outage Information Traditionally, electric utility customers have called the utility to report problems or interruptions in their electric service. Nearly commonplace now, utilities have embraced the use of Interactive Voice Response (IVR) technology to allow self-service outage reporting via telephone and to allow customers to report outages as well as obtain customer-specific restoration status information from the utility. April 16, 2012 The Liberty Consulting Group page 144Page 148 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 148 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Additionally, advanced metering technologies and distribution automation are presenting opportunities to identify customer locations that have lost power. Utilities with this level of notification can leverage these technologies during storms and proactively contact customers, especially critical care customers, to let them know that the company knows about the outage, provide the expected restoration time, and preempt a significant number of customer calls and website visits. a. Outage Management Systems OMS (Oracle Network Management System) is a detailed network model of the distribution system. Electrical Connectivity is provided from the Geographic Information System (GIS) that is the source of this network model. The system combines the locations of outage calls from customers, and uses a rules engine to predict the locations of outages. OMS facilitates outage prediction, identification, resource assignment, and restoration reporting. OMS also provides an internal workflow management tool and communication medium to various staff members associated with the restoration effort. OMS is integrated with UI’s SAP Customer Information System (CIS) and provides the outage count information depicted on the UI website. Following Tropical Storm Irene, UI issued a Request for Information (RFI) to several vendors to explore potential OMS technology improvements.221 The following activities can initiate electric trouble orders in the OMS: • Customers calling the company’s call center representatives • Customers self-reporting trouble through the Interactive Voice Response system • Dispatchers can manually create outage orders. OMS’s analyzer module interprets each outage call and creates outage trouble spots that are associated or “tagged” to likely electrical devices, such as a transformer. UI’s distribution electrical connectivity model groups devices using relational database tables that create the link for customers to transformers, transformers to fuses or other protective devices, devices to circuits, and so forth. As new trouble reports arrive, the system continues conditional grouping of devices automatically. OMS also provides tracking of the status of system isolating devices, i.e. switches, breakers and fuses that may be open and which are closed, network-tracing functions can be used to identify customers affected. OMS information is readily available to Call Center Representatives, the Interactive Voice Response system, UI’s website, dispatchers, and any UI field or office employee that has access and has been trained to use the system. Most utilities rely on outbound notification or callbacks to verify that power has been restored. During large outages there are often numerous trouble spots along a single circuit or part of a circuit. As circuits or portions of circuits are repaired, trouble tickets associated with that circuit are closed in the outage system. Power may still be off at a particular location, but since the tickets were closed by the outage system, the utility will not know that power is still off unless the customer calls back (or the utility can ping an automated meter). However, since UI has 221 Response to OCC-324. April 16, 2012 The Liberty Consulting Group page 145Page 149 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 149 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 deployed Automated Meter Reading (AMR) technologies, it has the capability to “ping” a meter to determine if the power is on or off. This capability was used extensively during both storms. This is a much more efficient way to determine service status, since the callback process can be confusing to customers, even anger customers who are still without power after many days, often creating escalated calls in the contact center. UI updated its critical facilities lists on August 27, 2011, just prior to Tropical Storm Irene. The list was updated through the Municipal Liaison program. The Municipal Liaison Team Coordinator meets with municipal officials on an annual basis to review priorities and changes. During an event, the Municipal Liaison will work with town contacts to determine the current status of priority facilities as well as communicate this status to the EOC. The EOC too maintains a copy of these critical facilities by town. This list is referred to as outages occur to identify if a priority facility has lost power. EOC then works through the Planning Team Leader to prioritize damage assessment and restoration priority.222 During Tropical Storm Irene, UI noticed capacity issues with OMS during the storm. For the remainder of the storm, UI limited access to key users to avoid issues. Since the storms, UI has issued an RFI to certain vendors for developing a methodology of integrating technology and process to enhance UI’s restoration processes.223 Otherwise, the performance and reliability of UI’s OMS during the 2011 storms was generally good. OMS performed well to provide trouble spot predictions and track asset conditions as well as predict customers affected. b. Estimated Restoration Times Another role of outage systems is to provide estimates for the time of restoration. Estimated Restoration Times (ERTs) are a critical information component of the restoration process. For day-to-day operations, UI’s outage management system calculates event-level ERTs based on area, order type, and active order volume. OMS uses historical outage records and predefined rules to create an initial ERT for each event. Field personnel can turn off the calculation of eventlevel ERTs at any point. Generally, UI disables ERT calculations during a large storm and did so at the beginning of both storms. UI has the capability to issue four levels of ERT projections—event-level, district, divisional, and global. During both storms, UI delivered a global announcement to customers in the first few days, via the phone system, to let customers know that ERTs would not be available until the damage assessment process was completed. Once damage assessment was complete and UI had a better idea of the level of resources available, UI’s EOC support staff was able to project estimates at the circuit level. As restoration progresses, UI was able to estimate to the feederlevel and ultimately at individual customer locations.224 222 Response to Liberty-57. Response to OCC-141 224 Response to AG-9. 223 April 16, 2012 The Liberty Consulting Group page 146Page 150 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 150 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 OMS is updated by the EOC to provide ERTs and completed repairs. These updates are based on the status of the notification within OMS, which indicates if crews are en-route, on-site, or if the outage has been restored. UI’s IVR attempts to deliver the status and ERTs to customers calling in during a storm, if the system can identify and match the caller to a CIS account.225 Earlier in 2011, UI made a focused effort to improve the process in the field and System Operations Center (SOC) to provide estimates of restoration during “blue-sky” outages and smaller storms. Beginning in June 2011, UI began measuring the frequency with which ERTs were recorded in OMS. This information was reported monthly as a Power Delivery and System Operations metric. Through November 2011, UI achieved an 85.2 percent success rate for reporting ERTs, well surpassing its goal of 75 percent.226 However, UI’s process to update OMS restoration status and provide estimates of restoration during blue-sky or normal outages, was not scalable in both of these storms, for several reasons: • Damage assessment process in large storms relies heavily on mobile patrols. Information collected during the patrols was handwritten, requiring manual entry into OMS. This can be a time consuming process, often delaying the process to project restoration estimates. • Once restoration was underway, restoration information was not updated in OMS, in many cases, until well after the crews were finished for the day. Similar to the field surveys, handwritten trouble order completion information had to be manually reconciled and reflected in OMS, which again can be time consuming and create backlogs. This too can delay the communications of restoration progress. In the post-storm customer research survey conducted following Irene, 91 percent of residential customers surveyed indicated that it was “very important” or “somewhat important” to receive an estimated outage duration when they call UI to report an outage. Of these, 50 percent indicated a preference for “real-time estimates” while another 35 percent preferred a “larger window of time up-front which incorporates unforeseen delays and issues”.227 While in both storms UI based restoration projections on damage patrols and work schedules, in the future UI plans to rely on OMS automation to calculate and provide ERTs up until the restoration crew is on-site. At that point, UI will require crews to provide and/or validate ERTs in OMS.228 UI has identified the need for an OMS upgrade. As part of the upgrade, additional allied projects were identified to enhance internal and external communications, including installing mobile data terminals in damage assessment and line construction vehicles, which would allow for faster communication for damage assessment from the field along with earlier and more accurate knowledge of completed restoration times. On November 1, 2011, UI released a request for information (RFI) to explore options.229 225 Response to OCC-158. Response to OCC-142. 227 Response to AR-Liberty-38-2. 228 Response to OCC-142. 229 Response to AG-9. 226 April 16, 2012 The Liberty Consulting Group page 147Page 151 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 151 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 c. Communicating Outage Information UI has leveraged its public website to provide outage-related information to customers and website visitors through its Storm Center. Customers can review general information on UI’s storm response, emergency preparedness, find out what number to call to report an outage, view a map of current outages, and view a table summarizing customer outages by town. The figure below provides a recent sample from UI’s outage mapping website.230 During the first three days of Tropical Storm Irene, UI received an abnormally high number of hits to its outage map, more than 10x normal hit rates. To alleviate a slowed response, UI took the outage map offline on August 28 and replaced it with a table of affected customers by town, which was manually updated on an hourly basis.231 In addition, UI replaced its normal home page with the outage table for the duration of the storm, thereby making it easy for visitors to view outage restoration progress. While the outage map was ultimately brought back online on August 30, UI continued to feature the outage table on its home page until restoration was completed on September 5. In total, UI’s website logged more than 200,000 page views during Tropical Storm Irene.232 UI’s website continues to feature the outage table today.233 230 uinet.com Response to EL-5. 232 Response to CSU-7. 233 Uinet.com. 231 April 16, 2012 The Liberty Consulting Group page 148Page 152 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 152 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 During the October snowstorm, UI website traffic peaked with 63,871 page views.234 UI did not experience any issues with regard to the outage map during the October snowstorm. The challenges that occurred during Tropical Storm Irene have been reviewed and the Company is implementing technology to address capacity constraints to avoid similar issues in future storms.235 UI used social media channels Facebook, Twitter, and YouTube to disseminate information during the storms. Generally the same information that was posted in media releases and on the website was posted to social media channels.236 UI is exploring ways to improve the outage information communicated through its website, specifically to increase the interactivity to allow customers to explore outage status information by hovering over a particular town on the map. This is part of the request for information for restoration process enhancements and technology that was issued on November 1 2011.237 5. 1. Conclusions UI’s call center was unable to ramp up staffing as quickly as needed to respond to the call volumes encountered during the October snowstorm. The UI Emergency Preparedness Plan, filed with PURA on December 1, 2011, includes a section dedicated to Customer Service. However, UI’s Customer Care Storm Plan does specify how the center will be staffed during an emergency or large storm. 234 Response to CSU-38. Response to OCC-148. 236 Response to CSU-37. 237 Response to AG-9. 235 April 16, 2012 The Liberty Consulting Group page 149
Text of EOE-383 Attachment 3.pdf
Extracted from the file · 55 pages · 132,814 characters
Text of EOE-383 Attachment 4.pdf
Extracted from the file · 2 pages · 4,635 characters
Text of EOE-383 Attachment 5.pdf
Extracted from the file · 7 pages · 11,175 characters
As listed on the current system
Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026