Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 21 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 21 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 District level drills will normally be performed biannually. Fewer drills for a specific District may be required if the Division Director determines that District’s recent or ongoing experience with actual storm events have adequately exercised the departments and support organizations involved. Adequacy reviews of District level storm critiques will determine whether outcomes from a storm event in a given District merit a reduction in the number of required drills. Conversely, additional drills may be necessary when introducing new or revised process flows or new software, etc.”18 (Emphasis added.)” The above wording does not provide for the coordination and consistency so important in training. A centralized training group should have more direct involvement. In addition, the language permitting fewer drills is troubling. While certainly actual storm response will interrupt the drill schedule, this wording could promote a less than aggressive approach to drills. In a response to an audit request for information about their Outage Restoration Training Plan, CL&P responded by describing three courses offered to support personnel. The three courses covered the “wires down” process, patroller and detail damage assessment training, and web workspace (analyst) training. There was no mention of any other training for other responders. CL&P conducted a tabletop hurricane drill on August 25, 2011, just days before Hurricane Irene made landfall. Appendix 1 is the script of that drill.19 The scenario and action prompts in the drill should have been helpful to CL&P in preparing for the ongoing storm. CL&P filed their revision to their 2006 ERP on June 1, 2011, but at the time of the impact of both storms, it had not held training on the new plan. They had it scheduled but storms interrupted that. Using on-line training, all incident commanders were supposed to have finished section 100 of the training course before Christmas. Incident commanders must complete sections 200 and 700 by March. CL&P gave copies of the full plan book to all incident commanders and placed in all storm rooms. The employees charged with the responsibility of training on the new plan were not aware of any meetings with employees out in the field to review the new plan.20 With regard to the use of the ERP, Liberty noted several variations from the plan in the response to Hurricane Irene and the October snowstorm. Liberty covers the specific instances in a following section of this report. Below are several comments made by CL&P employees during interviews concerning the plan, its usefulness, and its use during the two 2011 storms. • • After these two storms, responders probably think the plan was written for regulators21 Did not use the plan during either storm.22 18 CL&P ERP, Section 1, Basic Plan, 4.6.1 and 4.6.2, pages 18 and 19 Response to audit request Q-WITT-005. 20 Interview CLP22, January 3, 2012 21 Interview CLP23, January 3, 2012 19 April 16, 2012 The Liberty Consulting Group page 18
  2. Page 22 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 22 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • • • Plan does not have good specificity – no procedures that they are trained on and then put into practice. Have had 20-30 weather incidents since he has been involved, so they are wellrehearsed, but people not working according to plan – not sure of their role. It is a “structural issue” – people resisted the machine to bring structure.23 Followed the plan “as best we can” – “people know their assignments” – they do drills; use the plan. Familiar with EPOPs – “not word for word” – know who to talk to – used checklists from EPOPs24 The plan is OK on paper – when you get into details it is very nebulous, not a lot of substance – they are not trained on it – about 20 procedures covered as a separate addendum to the plan – the procedures are a cut above the rest of the plan – 10 years ago, used to do a lot more training, led by the manager, emergency preparedness. If budget is tight, they cut training and tree trimming. If training not mandated, it is not done.25 It is clear from the above that there are significant issues that CL&P needs to address in training and drilling the plan, and in its usefulness and use. 3. 1. Conclusions The CL&P Emergency Response Plan (ERP) is comprehensive in its content. The ERP addresses all key functional response areas, and provides good coverage of organization charts, checklists, and processes. 2. CL&P’s ERP is cumbersome and awkward in its present format. (See Recommendation 1.) With 558 pages in one binder, the plan in the district storm rooms is very hard to handle. It is difficult to turn the pages on the binder rings and this discourages use of the manual. 3. CL&P’s ERP contains no language concerning top management’s authority for and support of the response to major outage events. (See Recommendation 2.) The CL&P ERP describes the delegation by the CL&P president of authority for restoration performance, but there is no language describing and reaffirming top management’s complete support of and involvement in response to major outage events. 22 Interview CLP Tour A, January 6, 2012 Interview CLP37, January 6, 2012 24 Interview CLP30, January 4, 2012 25 Interview CLP26, January 3, 2012 23 April 16, 2012 The Liberty Consulting Group page 19
  3. Page 23 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 23 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 4. The safety and environmental segments in CL&P’s ERP Basic Plan do not include any proactive language concerning action steps used to help train workers and the public in advance. (See Recommendation 3.) While the ICS Communications Policy contains language such as, “developing communications strategies and messages…,” neither the safety nor the environmental segment addresses things such as strategies and messages. There is wording such as “highest priority,” “management ensures employees, work in a safe manner…,” and “management ensures employees, .work in an environmentally sound manner…” 26 A statement such as the following would strengthen the segment. “ Management is responsible to see that the proper information and training is provided to workers and the public as required, including daily briefings during major outage events.” 5. There is insufficient clarity in the ERP concerning the activation of the CL&P emergency response organization in the case of large pending weather events with advance notice. (See Recommendation 4.) The language in the general segment under “concepts of operation” and in sections 4.1.3 and 5.3 describes the activation/escalation of the ICS structure from the “bottom up” when outages have occurred or outside help is needed. It is silent on activation and escalation of ICS in the type of emergency faced in both Hurricane Irene and the October snowstorm. 6. The CL&P ERP sets forth clear expectations of employee involvement in support activities. This is a very important aspect of any successful response effort. Section 4.1.5, Augmenting Personnel and Support Functions, contains very explicit language concerning management’s expectations of employee participation. 7. Except for an error that inadvertently leaves out a certain level storm, the Classification of Service Outage Events as found in the Basic Plan is well conceived and provides helpful guidance in determining the amount of required resources. (See Recommendation 5.) The chart shown in Section 5.2 establishes five classifications of events, and stipulates the number and types of crews needed, anticipated duration of the event, and the activation level (District, Division, Area, and System). The primary purpose of CL&P’s event classification is to make an early determination of required resources, based on the best information available at the time. Based on this chart, it is clear that the CL&P ERP calls for the full engagement of all resources available for all events from Level III and above. The error is not technically covering outages involving 80,000 to 100,000 customers. 26 CL&P Emergency Response Plan, Section 2.2 – 2.5 – Basic Plan, pages 5-7 April 16, 2012 The Liberty Consulting Group page 20
  4. Page 24 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 24 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 8. The subsections in the Basic, District, and Division Plans do not cover all of the necessary elements. (See Recommendation 6.) The topics covered in these subsections are essential parts of post-incident activities and are well covered. However, they do not cover another essential post-incident activity, clean-up. This activity involves making repairs and replacements of temporary distribution system fixes, cleaning up temporary tree work, and thorough inspections of lines and trees. 9. The CL&P plan – Section 2, District Plan, 3.1.3 – places primary responsibility for drills and training on the district. In addition, the overall wording of this segment is not as strong as it should be for this important issue. (See Recommendation 7.) Segment 3.1.3 – Emergency Drills and Tabletop Exercises – places the primary load on the district. Simulated storm drills are scheduled and conducted by the CL&P EMG (with help from NU) “normally” annually.27 The Division Director can decide fewer district drills are needed, and the Director, System Operations can decide fewer simulated drills are needed based on storm response experience during that period. 10. The segment dealing with conference calls – 3.2, Section 2 – District Plan – lacks specificity as to frequency and optimum times for these calls. (See Recommendation 8.) This segment stresses the necessity of conference calls as an important function in storm response. However, there is no specification as to how many calls CL&P should make or at what time of day it should make the calls. These are important considerations and should be in the plan. The calls should be coordinated with each other to ensure the most timely and accurate communication between different levels of the response organization. 11. Segment 3.3, page 14 – Section 2, District Plan – lacks clarity and emphasis on district decentralization (See Recommendation 9.) The plan allows for the decentralization down to the district level even when the Area and Division Command are not activated. When an outage event has occurred or anticipated in which CL&P considers district decentralization, it should activate the Area and Division Commands. 12. Segment 3.4, page 15 – Section 2, District Plan – lacks specific guidance on the District organizational structure. (See Recommendation 10.) The second paragraph of this segment deals with the district organization in “an elevated event.” The wording is weak, leaving some important considerations left to the district to decide. For instance, “it is advisable for the District Commander to utilize the Section Chiefs…”, “The District Commander needs to maintain a manageable span of control and delegate responsibilities as the situation warrants”, or “the ICS process suggests that the span of control for any supervisor is optimally limited to five people.” 27 CL&P Emergency Response Plan, Section 2, District Plan, 3.1.3 page 12 April 16, 2012 The Liberty Consulting Group page 21
  5. Page 25 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 25 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 13. The process for determining the estimated total restoration time at the district level – as described in 3.7.1 of the District Plan – is a commendable approach and confirms CL&P’s awareness of the need of this information for all stakeholders. It is commendable that the CL&P plan has a process to seek to determine for each district the overall restoration time, and the approach in the formula is logical. In the absence of a predictive model, this is a good tool. This advanced information can be used not only to determine needed resources, but also to set realistic expectations among stakeholders. 14. The CL&P ERP wording dealing with training and drills is weak, and does not provide the adequate structure to effectively train and drill responders. (See Recommendation 11.) The approach of the CL&P ERP is to push the responsibility for training and drills down to the district level. This does not foster the type of consistent, coordinated training and drills as needed. The wording on drills allows too much leeway for the district and division to skip drills. 15. A significant portion of the CL&P response team has not “bought in” to the new ERP. This results in an inconsistent restoration response because of selective or no use of the plan. (See Recommendation 12.) Comments from several members of the CL&P response team indicate that there are responders who think the plan is deficient, and either do not use it or use it selectively. 3. II-CL&P-1 Recommendations Re-format the EPOPS document into smaller segments to enhance the use of this information during emergencies. By re-formatting this large document into smaller books no larger than the basic plan, CL&P will make it easier as a reference for responders, and therefore encourage its use. II-CL&P-2 Add language to the “Authority and Policies” subsection of the Basic plan that clearly describes and reaffirms top management’s ultimate authority for and complete support of the response to major outages. Prior to the statement on the delegation of the authority for the emergency response, it should be clearly set forth in the Plan (and communicated to all members of the CL&P response team) that the top management of NU and CL&P take ultimate responsibility and provide their enthusiastic support to the CL&P storm leaders. II-CL&P-3 Include language in Sections 2.2 and 2.3 (safety and environment) that emphasizes a more proactive approach in these areas. Safety and Environmental should include some language concerning proactive training and preventive measures. April 16, 2012 The Liberty Consulting Group page 22
  6. Page 26 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 26 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 II-CL&P-4 Add language to the ERP to provide guidance for activation/escalation “from the top down” when the situation calls for it. Language to the effect that in the event of a pending major outage event where there is some advance notice, the ICS activation will begin with the Area Command. II-CL&P-5 Change Level V in the Classification of Service Outage Events chart (Section 5.2, page 22, Basic Plan) to cover all outages of 80,000 customers and above. The chart inadvertently skips the range of customer outages from 80,000 to 100,000. By starting Level V at 80,000, CL&P will be committing to a maximum response from both CL&P and NU at even a lower trigger, which is appropriate. II-CL&P-6 Add a segment on clean-up activities in Subsections 6 – Post Incident Activities – in the Basic Plan, and Subsections 5 – Post Storm Activities – in the District and Division Plans. This includes post-storm patrols, repairs of quick-fixes on line facilities, additional trimming, and removal of broken trees and limbs that pose an outage hazard. II-CL&P-7 Place the responsibility for all drills and training with the EMG, and reword Section 2, District Plan, 3.13 to strengthen the process and place more emphasis on the training process. The concept of pushing the responsibility down to the lowest level of the organization is contrary to the usual practice in utilities. As written, the CL&P plan does not place an adequate stress on training and drills. II-CL&P-8 Provide specific guidance 3.2, Conference Calls, Section 2, District Plan, as to the frequency and time of day for conference calls. It will be necessary to change the time and frequency of the calls during the response effort as situations dictate. However, as part of the planning process, the optimum times and frequency of these calls should be determined and written into the plan. II-CL&P-9 Modify the wording in 3.3, District Decentralization, Section 2, District Plan to provide for the activation of Area and Division Command anytime decentralization is being considered. The plan covering district decentralization should confirm Area and Division Command activation. There should not be any need to qualify the instructions to cover “when the Area Command is activated,” and “when the Division command is activated.” II-CL&P-10 Strengthen the wording in 3.4, Activation and Staffing of the District Incident Command Post, Section 2, District Plan. The wording should April 16, 2012 The Liberty Consulting Group page 23
  7. Page 27 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 27 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 provide specific guidelines for triggers of when it should use certain organizational structures. Wording such as “the District Commander shall use the Section Chiefs assigned to the respective District ICS to assist in the implementation” should be used. (CL&P may choose to establish a specific threshold for this move.) Another suggested wording change is, “The span of control for any ICS supervisor shall be limited to 5, unless there is a specific need to exceed that slightly.” II-CL&P-11 Revise the ERP to provide for centralized training and drills, and firm up the wording concerning number of required drills. There should be more direct involvement of a centralized training group. In addition, the language permitting fewer drills is troubling. While certainly actual storm response will interrupt the drill schedule, this wording could promote a less than aggressive approach to drills. II-CL&P-12 Address aggressively the concerns of the response team concerning the usefulness and use of the plan. Top management should make visits to all districts and division commands to discuss with responders how the plan can become more useful, and clearly communicate that management expects all to follow the plan. C. UI 1. Form and Contents The emergency plan for United Illuminating (UI) is the Emergency Preparedness Plan (EPP). The plan of record during the response to Hurricane Irene and the October snowstorm was the plan filed with PURA in 2006. UI planned to file a revised plan with PURA in June 2011, but requested an extension until it could incorporate the recommendations of a consultant contracted for early in 2011. As a result, the revision was in progress at the time of the two storms, and there was considerable confusion as to the actual plan that UI used during the response to these storms. Responses from UI to audit requests and in interviews reflected that confusion. For example, when requested to provide the organization chart for the storm response team, UI responded with a chart dated October 26, 2011, and made reference to sections in the 2011 plan. However, in the revision history of the plan filed December 1, 2011, UI noted that on October 31, 2011, it sent the final draft for review by the UI team, and that the final update of the plan was not complete until November 21, 2011.28 In another response, UI confirmed that the plan of record was the 2006 plan, and that it did not file the 2011 plan with PURA until after the response to both storms.29 During the course of Liberty’s inquiries, UI referred to organization charts dated July 6, August 23, and October 26. 28 29 Response to audit request Liberty - 003 Response to audit request AG -169 April 16, 2012 The Liberty Consulting Group page 24
  8. Page 28 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 28 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Based on information received by Liberty, it appears that UI used an interim plan, which provided guidelines in some areas. In other areas, the 2006 plan was still in use. Liberty was unable to find documentation of the specific plan that UI used. Based on its review, Liberty concluded that the 2006 plan was very outdated and afforded little if any guidance in 2011. UI appears to have made some significant changes for the better in the newly revised 2011 plan. However, because it was not complete, it would be misleading for Liberty to provide comments on that plan as if UI used it during the 2011 storms. Based on the above, Liberty is unable to make any meaningful comments on the UI emergency plan used in 2011, other than to say that UI’s failure to have a definite plan for the responders was a confusing and negative factor in their response efforts. 2. Training, Drills, and Use of EPP For the reasons stated above (no definitive documented emergency plan in use), it can only be concluded that drills and training leading up to these two storms would have been nonproductive. UI covers training and drills in the 2011 plan. Liberty is unable also to comment on the use of the plan during the 2011 storms, as there was no definitive plan. 3. Conclusions 1. UI’s failure to have a revised emergency plan in place at the time of the impact of the two storms created confusion and affected the restoration response. (See Recommendation 1) Based on information received by Liberty, it appears that UI used an interim plan, which provided guidelines in some areas. In other areas, the 2006 plan was still in use. Liberty was unable to find documentation of the specific plan that UI used. Liberty concluded that the 2006 plan was very outdated and afforded little if any guidance in 2011. UI appears to have made some significant changes for the better in the newly revised 2011 plan. 4. Recommendations II-UI-1 Initiate a process for regular updates to the EPP, document the updates, and conduct the necessary training to be sure all responders are familiar with the plan. Even though UI is not required to file a revised plan more frequently than 5 years, the changes made in the 2006 plan were significant and should have been made earlier rather than wait until required by PURA. April 16, 2012 The Liberty Consulting Group page 25
  9. Page 29 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 29 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Appendix II-1 – Script for CL&P Tabletop Drill held August 25, 2011 Scenario A tropical depression has formed in the Eastern Atlantic, just south of The Cape Verde Islands. The storm formed on Day 1 and has begun moving to the west-northwest. Over the next several days, the storm will become better organized and gain in strength. Day T-4 The storm has reached hurricane strength and is located several hundred miles to the east of the Leeward Islands. It is expected when the storm approaches these islands it will make a sharp turn to the northwest and pass to the north of all the islands in the Caribbean. EOC will continue to monitor and send out the weather forecast. Initial Actions Area Work Center What are your plans and/or preparations? Day T-3 & T2 The storm has reached its peak as a Category 4 storm. Sustained winds are now at 143 mph with higher gusts. The storm is located several hundred miles to the east of Florida. As the storm is approaching the east coast, it will begin to curve northward passing over the Outer Banks of North Carolina. The storm is expected to decrease in strength to a Category 2 storm as it approaches Connecticut. Additional Actions Area Work Center What are your preparations? Day T-1 The storm is tracking along the east coast, over the water which is allowing the storm to maintain its strength. As a typical hurricane along the east coast, it is beginning to accelerate as it passes North Carolina. The storm is expected to make landfall on Long Island, New York in the early morning hours of Day 5, tomorrow. The storm will continue north through Connecticut (tracking up the Connecticut River Valley) and is expected to make landfall in CT somewhere between 5:00 AM and 10:00 AM as a Category 2 with winds forecasted between 96 to 110 MPH, and continue to track towards Massachusetts, central New Hampshire and western Maine. Ongoing Actions Area Work Center What are your plans and/or preparations? Day T 0 April 16, 2012 The Liberty Consulting Group page 26
  10. Page 30 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 30 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 At 0600 hours, Connecticut is experiencing gale force winds and outages are occurring on the coast line. At 0800 hours, Connecticut is being hit with a Category 2 hurricane with sustained winds of 110 mph and gusts to 120 mph accompanied by tropical rains (up to 4 inches is expected). Outages are occurring all over Connecticut and Massachusetts. As of the last hourly report, Connecticut is reporting 400,000 people out of power and the damage to the electrical system is heavy. Many roads are closed due to fallen trees and flooding. Also many bridges have been damaged. Massachusetts is reporting 80 mph winds in Springfield and heavy rains. Outage reports are 100,000 people without power. The storm moved quickly across Connecticut. At 1000 hours, the eye of the storm has crossed the Massachusetts border and is still headed north on its path towards New Hampshire. New Hampshire is currently experiencing gale force winds. We are currently reporting over 406,000 customers out in CT. with over 1,800 trouble locations. There is a total of 91 E911 calls: • Level 1 – 130 calls • Level 2 – 90 calls • Level 3 – 310 calls Necessary Actions/Steps: April 16, 2012 The Liberty Consulting Group page 27

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)