Interrogatory responses
Answers to questions 379, 380, 381, 382, 383
Files11
EOE-379_Final.pdf
PDF · 181 KB · 5 pagesText searchable
Download EOE-379_Final.pdfRead the text of EOE-379_Final.pdf
EOE-379 Attachment 1.pdf
PDF · 1.2 MB · 2 pagesText searchable
Download EOE-379 Attachment 1.pdfRead the text of EOE-379 Attachment 1.pdf
EOE-380_Final.pdf
PDF · 96 KB · 3 pagesText searchable
Download EOE-380_Final.pdfRead the text of EOE-380_Final.pdf
EOE-381_Final.pdf
PDF · 89 KB · 2 pagesText searchable
Download EOE-381_Final.pdfRead the text of EOE-381_Final.pdf
EOE-382_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download EOE-382_Final.pdfRead the text of EOE-382_Final.pdf
EOE-383_Final.pdf
PDF · 133 KB · 4 pagesText searchable
Download EOE-383_Final.pdfRead the text of EOE-383_Final.pdf
EOE-383 Attachment 1.pdf
PDF · 1.3 MB · 125 pagesText searchable
Download EOE-383 Attachment 1.pdfRead the text of EOE-383 Attachment 1.pdf
EOE-383 Attachment 2.pdf
PDF · 3.5 MB · 182 pagesText searchable
Download EOE-383 Attachment 2.pdfRead the text of EOE-383 Attachment 2.pdf
EOE-383 Attachment 3.pdf
PDF · 3.5 MB · 55 pagesText searchable
Download EOE-383 Attachment 3.pdfRead the text of EOE-383 Attachment 3.pdf
EOE-383 Attachment 4.pdf
PDF · 715 KB · 2 pagesText searchable
Download EOE-383 Attachment 4.pdfRead the text of EOE-383 Attachment 4.pdf
EOE-383 Attachment 5.pdf
PDF · 730 KB · 7 pagesText searchable
Download EOE-383 Attachment 5.pdfRead the text of EOE-383 Attachment 5.pdf
Text of EOE-381_Final.pdf
Extracted from the file · 2 pages · 3,490 characters
Text of EOE-382_Final.pdf
Extracted from the file · 1 page · 2,648 characters
Text of EOE-383_Final.pdf
Extracted from the file · 4 pages · 10,383 characters
Text of EOE-383 Attachment 1.pdf
Extracted from the file · 125 pages · 401,903 characters
Page 28 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 28 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Based on information received by Liberty, it appears that UI used an interim plan, which provided guidelines in some areas. In other areas, the 2006 plan was still in use. Liberty was unable to find documentation of the specific plan that UI used. Based on its review, Liberty concluded that the 2006 plan was very outdated and afforded little if any guidance in 2011. UI appears to have made some significant changes for the better in the newly revised 2011 plan. However, because it was not complete, it would be misleading for Liberty to provide comments on that plan as if UI used it during the 2011 storms. Based on the above, Liberty is unable to make any meaningful comments on the UI emergency plan used in 2011, other than to say that UI’s failure to have a definite plan for the responders was a confusing and negative factor in their response efforts. 2. Training, Drills, and Use of EPP For the reasons stated above (no definitive documented emergency plan in use), it can only be concluded that drills and training leading up to these two storms would have been nonproductive. UI covers training and drills in the 2011 plan. Liberty is unable also to comment on the use of the plan during the 2011 storms, as there was no definitive plan. 3. Conclusions 1. UI’s failure to have a revised emergency plan in place at the time of the impact of the two storms created confusion and affected the restoration response. (See Recommendation 1) Based on information received by Liberty, it appears that UI used an interim plan, which provided guidelines in some areas. In other areas, the 2006 plan was still in use. Liberty was unable to find documentation of the specific plan that UI used. Liberty concluded that the 2006 plan was very outdated and afforded little if any guidance in 2011. UI appears to have made some significant changes for the better in the newly revised 2011 plan. 4. Recommendations II-UI-1 Initiate a process for regular updates to the EPP, document the updates, and conduct the necessary training to be sure all responders are familiar with the plan. Even though UI is not required to file a revised plan more frequently than 5 years, the changes made in the 2006 plan were significant and should have been made earlier rather than wait until required by PURA. April 16, 2012 The Liberty Consulting Group page 25Page 29 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 29 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Appendix II-1 – Script for CL&P Tabletop Drill held August 25, 2011 Scenario A tropical depression has formed in the Eastern Atlantic, just south of The Cape Verde Islands. The storm formed on Day 1 and has begun moving to the west-northwest. Over the next several days, the storm will become better organized and gain in strength. Day T-4 The storm has reached hurricane strength and is located several hundred miles to the east of the Leeward Islands. It is expected when the storm approaches these islands it will make a sharp turn to the northwest and pass to the north of all the islands in the Caribbean. EOC will continue to monitor and send out the weather forecast. Initial Actions Area Work Center What are your plans and/or preparations? Day T-3 & T2 The storm has reached its peak as a Category 4 storm. Sustained winds are now at 143 mph with higher gusts. The storm is located several hundred miles to the east of Florida. As the storm is approaching the east coast, it will begin to curve northward passing over the Outer Banks of North Carolina. The storm is expected to decrease in strength to a Category 2 storm as it approaches Connecticut. Additional Actions Area Work Center What are your preparations? Day T-1 The storm is tracking along the east coast, over the water which is allowing the storm to maintain its strength. As a typical hurricane along the east coast, it is beginning to accelerate as it passes North Carolina. The storm is expected to make landfall on Long Island, New York in the early morning hours of Day 5, tomorrow. The storm will continue north through Connecticut (tracking up the Connecticut River Valley) and is expected to make landfall in CT somewhere between 5:00 AM and 10:00 AM as a Category 2 with winds forecasted between 96 to 110 MPH, and continue to track towards Massachusetts, central New Hampshire and western Maine. Ongoing Actions Area Work Center What are your plans and/or preparations? Day T 0 April 16, 2012 The Liberty Consulting Group page 26Page 30 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 30 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 At 0600 hours, Connecticut is experiencing gale force winds and outages are occurring on the coast line. At 0800 hours, Connecticut is being hit with a Category 2 hurricane with sustained winds of 110 mph and gusts to 120 mph accompanied by tropical rains (up to 4 inches is expected). Outages are occurring all over Connecticut and Massachusetts. As of the last hourly report, Connecticut is reporting 400,000 people out of power and the damage to the electrical system is heavy. Many roads are closed due to fallen trees and flooding. Also many bridges have been damaged. Massachusetts is reporting 80 mph winds in Springfield and heavy rains. Outage reports are 100,000 people without power. The storm moved quickly across Connecticut. At 1000 hours, the eye of the storm has crossed the Massachusetts border and is still headed north on its path towards New Hampshire. New Hampshire is currently experiencing gale force winds. We are currently reporting over 406,000 customers out in CT. with over 1,800 trouble locations. There is a total of 91 E911 calls: • Level 1 – 130 calls • Level 2 – 90 calls • Level 3 – 310 calls Necessary Actions/Steps: April 16, 2012 The Liberty Consulting Group page 27Page 31 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 31 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 III. Routine Maintenance and Inspections A. CL&P 1. Vegetation Management a. Background (1) Requirement to Trim Electric utilities operate their systems along many miles of right-of-way (ROW) and deeded easements. In order to provide safe and consistent electric service, the utilities must keep these lines clear of contact with tree branches and limbs. Trimming trees is an essential part of maintaining a reliable system for any electric utility. Vegetation Management (VM) programs refer to a utility’s tree trimming practices and ROW policies. The National Electric Safety Code (NESC) states: “Vegetation that may damage ungrounded supply conductors should be pruned or removed. Vegetation management should be performed as experience has shown to be necessary.” These rules are broad and vague; however, the NESC’s goal is mainly safety. From a utility perspective, circuits normally de-energize from vegetation contact before circuit damage. Therefore trimming trees is primarily important for maintaining reliable service. The main public safety issues are homeowners contacting lines while cutting their own trees or homeowners cutting trees that fall and damage the lines. In addition to trimming trees and ROW to prevent line contact, maintaining a corridor of trimmed trees also provides access to the power line for inspections and maintenance. There are two mechanisms where a tree can cause a power outage. The most common of these is electrical. Vegetation contacts and bridges the circuit between an energized conductor and a grounded conductor. The voltage in the circuit creates and builds up a carbon path across the vegetation. It eventually arcs over and trips a circuit fuse or other protective device to cause an outage. The second means is mechanical. A heavy branch or tree falls and breaks lines, poles, and equipment. (2) Storm Impacts on Vegetation Listed below are some definitions of common vegetation concerns due to storms. Fall Zone – This is the area including the roadside clearance zone and extending from the conductors out a distance to where an uprooted tree could strike the conductor and cause an outage. Danger Tree – Any tree located in the fall zone that is tall enough to potentially contact the energized conductors if it were to fall. The total number of danger trees on the CL&P system is in the millions.30 30 Interview #65, 2/23/12, Sean Redding April 16, 2012 The Liberty Consulting Group page 28Page 32 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 32 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Hazard Tree – Any danger tree that is dead or, after evaluation using the Handbook of Hazard Tree Evaluation for Utility Arborists, rates as a moderate or high hazard. Another term for these is risk trees. CL&P estimates the number of hazard trees on its system is 340,000.31 Clearance Zone – This is the area to the side, above and below the energized conductors that is trimmed during the trim cycles. Overhang – Any limbs projecting above the defined clearance zone are overhanging limbs. Overhead Hazards – These are dead, dying, diseased, insect infected or structurally weak branches that overhang or are located to the side of the clearance zone, including those which could break at weak points and strike conductors when swinging down in an arc. The main storm impacts to utility circuits from vegetation are: • Falling Hazard Trees – these could occur during both minor and major storms. • Breaking Overhead Hazards • Falling Danger Trees – these occur mainly during major storms when the tree is uprooted and falls or leans into the line. Irene caused over 15,600 distribution trouble spots (estimated damage locations resulting in outages) and the snowstorm caused over 25,500. Trees caused the vast majority of these trouble spots. Connecticut has one of the most dense tree canopies in the United States (# 1 in the U.S. for Woodland/Urban Interface tree density). Connecticut’s tree profile also revealed trees with larger circumferences than average. In addition to the normal cyclic trimming of clearance zones, key success factors in reducing tree-caused storm outages are the identification and removal of hazard trees and overhead hazards; and the reduction of overhanging limbs. (3) General Vegetation Trim Rights When utility facilities are not located on the public right-of-way or on property owned by the utility itself, it must obtain an easement, license, lease, or other applicable property right in order to trim. The real estate documents granting such use of private property set forth the rights the utility has to use, operate, and maintain its facilities on that property, including any right to deal with vegetation management issues. Such vegetation management rights generally fall within three areas: the cleared width, danger or hazard tree rights, and access rights to the right-of-way. In the cleared width, the property documents dictate the rights to trim and remove vegetation that is incompatible with the safe and reliable operation of the electric system. Danger or hazard tree rights allow the utility to trim or remove trees that are an imminent threat to the electric system from outside the cleared width. Access rights allow the utility to travel across land outside of the cleared width to access the private right-of-way and the electric facilities. Within the cleared width of the right-of-way, the property rights obtained by the utility do not generally restrict the amount of tree trimming or removal that it can perform. Outside of the cleared width, if the utility does not have hazard tree rights, it generally cannot trim or remove trees without the consent of the property owner. Even where there are risk tree rights, the utility 31 Audit Request OCC-118 April 16, 2012 The Liberty Consulting Group page 29Page 33 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 33 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 may not have the authority to remove every tree that has the potential to fall into the electric facilities. For roadside distribution line-clearance tree work (i.e., facilities that are located on the public right-of-way), the utility’s rights to trim and remove trees are limited by the Connecticut General Statutes and the rights they convey to tree owners. The utility and its contractors are restricted by statutes that require a tree warden permit (CGS 23-65(f)), adjoining property owner consent (CGS 16-234), a state DOT permit (CGS 13a-140), and notification of the chief elected official for removal of any tree with a diameter greater than 18 inches along state highways (CGS 13a140). These statutes allow the state, towns, and individual property owners to restrict the nature and amount of tree work that the company performs from outright refusing to allow any tree work at all or limiting the extent of permitted tree work. b. Program Overview - Distribution CL&P has 16,961 miles of overhead primary voltage distribution lines that it must trim. About 46 percent of the conductors are insulated types such as tree wire, aerial cable, or spacer cable. The remaining 54 percent is bare conductor. The company’s existing tree trimming plan is to trim these lines on an average 5-year cycle. CL&P estimates that is needs to trim 180 trees per mile.32 The Public Utilities Regulatory Authority established and authorized funding for the 5year cycle in its decisions in Docket Nos. 07-07-01 and 09-12-05. The budget established by these dockets was $21.5M for 2011. The company’s tree trimming plan for 2011 is to complete 3,393 miles of trimming. This will be the fourth consecutive year in which CL&P has trimmed approximately 20 percent of the total miles. By the end of 2012, it will achieve the 5-year cycle average across the entire system. The trimming plan is not a true cyclic program. Arborists choose the circuits for trimming each year based on two conditions, SAIDI (the system average interruption duration index) and years since last trimmed. As a result, CL&P has not trimmed some circuits for seven to eight years. CL&P developed the 2011 plan in the fall of 2010. CL&P’s vegetation management team of arborists developed the annual work scope to get a balance of miles and tree crews spread throughout the service territory. There is a documented process for the circuit selection method. They calculate a weighted ranking of each circuit. They use the last three years of SAIDI nonstorm performance and the last three years of SAIDI storm performance. After this ranking, they exclude circuits trimmed within the last three years. Typically, in June of each year, they make the selection based on the worst performers and the years since the last trim. Once CL&P’s vegetation management team finalizes the schedule, it meets with the contractors to plan the timing of the work completion over 12 months. Throughout the year, the team meets with the contractors each month to review schedule completion and contractor performance. 32 Interview #65, 2/23/12 April 16, 2012 The Liberty Consulting Group page 30Page 34 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 34 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Since 1987, the standard trim specification has been to trim 8 feet to the conductor side, 15 feet above, and 10 feet under (8 x 15 x 10). All hazard trees up to and including 16 inches DBH (diameter at breast height) within 8 feet of the outermost conductor are identified and removed. Northeast Utilities (NU) must approve the removal of any tree greater than 16 inches DBH. NU will provide specific instructions in each case depending on whether others are sharing the cost or disposing of the tree parts. In addition to the standard trim specification, CL&P has an Enhanced Tree Trimming (ETT) specification used for selected circuits. The ETT trim specification depends on whether the circuit portion is a backbone or a lateral.33 The table below shows the ETT specifications. The side clearances are the same as the standard specification. The ETT specifications are more aggressive in the removal of overhanging limbs, overhead hazards, and hazard trees. Side Clearance Overhead Clearance Backbone 8 feet of side clearance or to the previously established tree line. Trim and remove all overhanging limbs. Remove all overhead hazards within reach of a (70 foot) lift unit. Lateral 8 feet of side clearance or to the previously established tree line. Trim to provide a minimum of 20 feet of overhead clearance and remove all overhead hazards within reach of a standard (55 foot) lift unit. Hazard Trees Inspect, evaluate, and eliminate all hazardous trees within the fall zone by pruning or removal. Inspect, evaluate, and eliminate all hazardous trees within the fall zone by pruning or removal. CL&P cleared all of the roadside backbone circuit portions (3,694 miles) to ETT specifications.34 It cleared about 3,124 miles of lateral circuit portions to ETT specifications, but has not cleared 9,667 miles of lateral to ETT specifications. 33 Backbone – A three phase section of line starting at a substation and extending to the first fused device or single/double phase reclosing device. About 22 percent of the circuit miles are backbone. Lateral – A section of primary voltage line extending from the end of backbone to a secondary or service wire. About 78 percent of the circuit miles are laterals. 34 Audit Request OCC-109 April 16, 2012 The Liberty Consulting Group page 31Page 35 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 35 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The hazard-tree removal process is the remaining critical part of the vegetation management program. During the cycle trimming, the contractor will identify and remove any hazard trees as part of the unit price per mile for the cycle work. CL&P’s arborists monitor and approve the amount of hazard tree removal. Company personnel and others (e.g., property owners, tree wardens, and public works individuals) identify hazard trees located along circuits that are not being cycle trimmed. The arborist determines what work is necessary and manages to the allowed budget for this type of work. c. Program Results (1) Distribution The Supervisor, CL&P Vegetation Management, manages the vegetation-trimming program. They have a staff of eight arborists that oversee the work of the contractors. There are two primary contractors referred to as Alliance Partners. Lewis Tree is the Alliance Partner in the Western and Southern divisions. Asplundh is the Alliance Partner in the Central and Eastern divisions. These contractors have two-year contracts. About 70 to 80 percent of their work uses unit prices per mile. Lump-sum bids make up the remainder of their work. About 110 contractor crews, mostly 2- or 3-person crews, are involved in the trimming program. The graph to the left shows the trim cycle for the past ten years. 35 This cycle length was calculated based on the annual trim miles divided by the total circuit miles. Since the number and size of major storms vary from year to year, any available outage data of treecaused interruptions would not show any trends. In addition, outage causes are rarely captured in major storms due to the number and rapid pace of restoration. Non-storm tree-caused interruption data is an indicator of the current effectiveness and program trends and the graph to the left shows these data.36 Despite the increased cycle trimming for the past few years, the number of interruptions is holding steady or increasing. For 2010, there were about 37 tree-caused interruptions per 100 circuit miles. 35 36 Audit Request AG-84 2011 CL&P Transmission & Distribution Reliability Report April 16, 2012 The Liberty Consulting Group page 32Page 36 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 36 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The next graph to the left shows the percentage of non-storm interruptions due to trees. 37 Over onethird of all non-storm outages are due to trees. The graph to the left shows the budget history for hazard tree work.38 These budgets are a portion of the total allowed vegetation management funding. Based on the total circuit miles to be trimmed, the $1.3M for 2011 funding would be about $77 per mile. CL&P investigates and prioritizes customer requests for tree work based on the condition of the tree and the impact of the tree’s failure to the distribution system. CL&P only trims or removes high priority hazard trees because the budget will not support all of the customer requests that it receives. The Arborists do not measure or count the number of removals. CL&P does not track the quantity or cost of individual hazard tree removals. In 2010, CL&P performed a hazard tree survey on one of its circuits in the lower Connecticut River valley. The Arborists that performed the survey reported an average of 20 hazard trees per mile of line on the 50-mile circuit. Extrapolation of these data to CL&P's 17,000 miles of line results in approximately 340,000 risk trees.39 NU must approve the removal of any tree greater than 16 inches DBH. CL&P does not track the number of tree removals it submitted for approval, but reported that there were tree removals submitted for approval that were not approved. (2) Transmission The transmission system consists of 1,638 circuit-miles of overhead transmission located on 808 miles of right-of-way (ROW). The management and oversight of the vegetation management activities for the NU Transmission Group fall under the direction of the Transmission Vegetation Management Section (TVM), which had a 2011 VM budget of $3M. The company normally clears transmission lines to the full width of the ROW. It does not allow overhanging tree limbs. The cleared ROW width is wider for higher voltage lines. Transmission 37 2011 CL&P Transmission & Distribution Reliability Report Audit Requests AG-15 and Liberty-89 39 Audit request OCC-118 38 April 16, 2012 The Liberty Consulting Group page 33Page 37 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 37 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 line outages are mainly due to trees falling over rather than limbs. As in distribution, the company identifies and removes hazard trees to the extent possible. The graph to the left shows the history of all tree-related transmission outages. 40 It shows the effects of Irene and the snowstorm. The failure of healthy trees caused about 80 percent of the Irene and snowstorm outages. d. 1. Conclusions CL&P’s distribution tree trimming program contributed significantly to the extent of 2011 storm damage and the duration of storm service interruptions. The present five-year trim cycle program is a performance-based program rather than a true cyclic program. Arborists select the circuits for trimming each year and so there are some circuits not trimmed for seven to eight years. This approach leaves considerable vegetation growth on the right-of-ways when outages have not occurred there. This additional growth is a concern during major storms. The five-year trim cycle is also not the recommended NU trim cycle for the tree density in New England. NU recommends a four-year trim cycle for this area.41 A four-year cycle allows for increased trim clearances and more opportunities to spot and remove hazard trees. The amount of overhang present in the standard clearance specifications is another concern. Overhanging hazards are a major source of tree-caused outages. The ETT specification reduces the amount of overhang. However, CL&P does not apply this specification to all of its system. CL&P is expanding its Vegetation Management program in 2012 and has scheduled approximately 1,600 miles of additional tree trimming. 42 It schedules about 500 miles of Enhanced Tree Trimming (ETT) and 1,100 miles of maintenance trimming. The plan for the 500 miles of ETT is to expand the work specification to remove all overhanging limbs and aggressively remove hazard trees with the expectation that the expanded specification will significantly reduce tree failure in major storms. The hazard tree budgets are also a concern. The amount of this budget allows for expenditures of $77 per mile. With typical hazard tree removals easily costing over $1,000, hazard tree removal is restricted to the most critical needs. 40 Audit Request Liberty-85 Audit Request Liberty-074, p. 312. 42 Audit Request TOWNS-005 41 April 16, 2012 The Liberty Consulting Group page 34
Text of EOE-383 Attachment 3.pdf
Extracted from the file · 55 pages · 132,814 characters
Text of EOE-383 Attachment 4.pdf
Extracted from the file · 2 pages · 4,635 characters
Text of EOE-383 Attachment 5.pdf
Extracted from the file · 7 pages · 11,175 characters
As listed on the current system
Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026