Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 34 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 34 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Since 1987, the standard trim specification has been to trim 8 feet to the conductor side, 15 feet above, and 10 feet under (8 x 15 x 10). All hazard trees up to and including 16 inches DBH (diameter at breast height) within 8 feet of the outermost conductor are identified and removed. Northeast Utilities (NU) must approve the removal of any tree greater than 16 inches DBH. NU will provide specific instructions in each case depending on whether others are sharing the cost or disposing of the tree parts. In addition to the standard trim specification, CL&P has an Enhanced Tree Trimming (ETT) specification used for selected circuits. The ETT trim specification depends on whether the circuit portion is a backbone or a lateral.33 The table below shows the ETT specifications. The side clearances are the same as the standard specification. The ETT specifications are more aggressive in the removal of overhanging limbs, overhead hazards, and hazard trees. Side Clearance Overhead Clearance Backbone 8 feet of side clearance or to the previously established tree line. Trim and remove all overhanging limbs. Remove all overhead hazards within reach of a (70 foot) lift unit. Lateral 8 feet of side clearance or to the previously established tree line. Trim to provide a minimum of 20 feet of overhead clearance and remove all overhead hazards within reach of a standard (55 foot) lift unit. Hazard Trees Inspect, evaluate, and eliminate all hazardous trees within the fall zone by pruning or removal. Inspect, evaluate, and eliminate all hazardous trees within the fall zone by pruning or removal. CL&P cleared all of the roadside backbone circuit portions (3,694 miles) to ETT specifications.34 It cleared about 3,124 miles of lateral circuit portions to ETT specifications, but has not cleared 9,667 miles of lateral to ETT specifications. 33 Backbone – A three phase section of line starting at a substation and extending to the first fused device or single/double phase reclosing device. About 22 percent of the circuit miles are backbone. Lateral – A section of primary voltage line extending from the end of backbone to a secondary or service wire. About 78 percent of the circuit miles are laterals. 34 Audit Request OCC-109 April 16, 2012 The Liberty Consulting Group page 31
  2. Page 35 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 35 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The hazard-tree removal process is the remaining critical part of the vegetation management program. During the cycle trimming, the contractor will identify and remove any hazard trees as part of the unit price per mile for the cycle work. CL&P’s arborists monitor and approve the amount of hazard tree removal. Company personnel and others (e.g., property owners, tree wardens, and public works individuals) identify hazard trees located along circuits that are not being cycle trimmed. The arborist determines what work is necessary and manages to the allowed budget for this type of work. c. Program Results (1) Distribution The Supervisor, CL&P Vegetation Management, manages the vegetation-trimming program. They have a staff of eight arborists that oversee the work of the contractors. There are two primary contractors referred to as Alliance Partners. Lewis Tree is the Alliance Partner in the Western and Southern divisions. Asplundh is the Alliance Partner in the Central and Eastern divisions. These contractors have two-year contracts. About 70 to 80 percent of their work uses unit prices per mile. Lump-sum bids make up the remainder of their work. About 110 contractor crews, mostly 2- or 3-person crews, are involved in the trimming program. The graph to the left shows the trim cycle for the past ten years. 35 This cycle length was calculated based on the annual trim miles divided by the total circuit miles. Since the number and size of major storms vary from year to year, any available outage data of treecaused interruptions would not show any trends. In addition, outage causes are rarely captured in major storms due to the number and rapid pace of restoration. Non-storm tree-caused interruption data is an indicator of the current effectiveness and program trends and the graph to the left shows these data.36 Despite the increased cycle trimming for the past few years, the number of interruptions is holding steady or increasing. For 2010, there were about 37 tree-caused interruptions per 100 circuit miles. 35 36 Audit Request AG-84 2011 CL&P Transmission & Distribution Reliability Report April 16, 2012 The Liberty Consulting Group page 32
  3. Page 36 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 36 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The next graph to the left shows the percentage of non-storm interruptions due to trees. 37 Over onethird of all non-storm outages are due to trees. The graph to the left shows the budget history for hazard tree work.38 These budgets are a portion of the total allowed vegetation management funding. Based on the total circuit miles to be trimmed, the $1.3M for 2011 funding would be about $77 per mile. CL&P investigates and prioritizes customer requests for tree work based on the condition of the tree and the impact of the tree’s failure to the distribution system. CL&P only trims or removes high priority hazard trees because the budget will not support all of the customer requests that it receives. The Arborists do not measure or count the number of removals. CL&P does not track the quantity or cost of individual hazard tree removals. In 2010, CL&P performed a hazard tree survey on one of its circuits in the lower Connecticut River valley. The Arborists that performed the survey reported an average of 20 hazard trees per mile of line on the 50-mile circuit. Extrapolation of these data to CL&P's 17,000 miles of line results in approximately 340,000 risk trees.39 NU must approve the removal of any tree greater than 16 inches DBH. CL&P does not track the number of tree removals it submitted for approval, but reported that there were tree removals submitted for approval that were not approved. (2) Transmission The transmission system consists of 1,638 circuit-miles of overhead transmission located on 808 miles of right-of-way (ROW). The management and oversight of the vegetation management activities for the NU Transmission Group fall under the direction of the Transmission Vegetation Management Section (TVM), which had a 2011 VM budget of $3M. The company normally clears transmission lines to the full width of the ROW. It does not allow overhanging tree limbs. The cleared ROW width is wider for higher voltage lines. Transmission 37 2011 CL&P Transmission & Distribution Reliability Report Audit Requests AG-15 and Liberty-89 39 Audit request OCC-118 38 April 16, 2012 The Liberty Consulting Group page 33
  4. Page 37 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 37 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 line outages are mainly due to trees falling over rather than limbs. As in distribution, the company identifies and removes hazard trees to the extent possible. The graph to the left shows the history of all tree-related transmission outages. 40 It shows the effects of Irene and the snowstorm. The failure of healthy trees caused about 80 percent of the Irene and snowstorm outages. d. 1. Conclusions CL&P’s distribution tree trimming program contributed significantly to the extent of 2011 storm damage and the duration of storm service interruptions. The present five-year trim cycle program is a performance-based program rather than a true cyclic program. Arborists select the circuits for trimming each year and so there are some circuits not trimmed for seven to eight years. This approach leaves considerable vegetation growth on the right-of-ways when outages have not occurred there. This additional growth is a concern during major storms. The five-year trim cycle is also not the recommended NU trim cycle for the tree density in New England. NU recommends a four-year trim cycle for this area.41 A four-year cycle allows for increased trim clearances and more opportunities to spot and remove hazard trees. The amount of overhang present in the standard clearance specifications is another concern. Overhanging hazards are a major source of tree-caused outages. The ETT specification reduces the amount of overhang. However, CL&P does not apply this specification to all of its system. CL&P is expanding its Vegetation Management program in 2012 and has scheduled approximately 1,600 miles of additional tree trimming. 42 It schedules about 500 miles of Enhanced Tree Trimming (ETT) and 1,100 miles of maintenance trimming. The plan for the 500 miles of ETT is to expand the work specification to remove all overhanging limbs and aggressively remove hazard trees with the expectation that the expanded specification will significantly reduce tree failure in major storms. The hazard tree budgets are also a concern. The amount of this budget allows for expenditures of $77 per mile. With typical hazard tree removals easily costing over $1,000, hazard tree removal is restricted to the most critical needs. 40 Audit Request Liberty-85 Audit Request Liberty-074, p. 312. 42 Audit Request TOWNS-005 41 April 16, 2012 The Liberty Consulting Group page 34
  5. Page 38 of 182Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 38 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 e. Recommendations III-CL&P-1 Institute a four-year full cycle trim program, a more aggressive overhang trimming process, and a more aggressive hazard-tree removal program. To reduce tree-related storm interruptions, the vegetation management program needs to be much more aggressive for the tree density in this region. The current non-storm tree-caused interruption rate of 37 per 100 circuit miles is high.43 This is a certain indicator that the treecaused interruptions during storms, both major and minor, will also be high. A more aggressive vegetation management program to reduce overhanging material, increase clearances, and remove more hazard trees will improve both storm and non-storm reliability. 2. Wood Pole Maintenance a. Background Wood poles have a long history of providing excellent service for supporting overhead electrical and telecommunication lines. They are still unsurpassed as the structural foundation of the overhead distribution system due to their combination of economy, sustainability, flexibility, and strength. The NESC (National Electrical Safety Code) requires replacement of wood poles when they deteriorate to below ⅔ of their original strength. Decay of a pole is usually in the form of gradual deterioration in an area just below the groundline caused by fungi and other low forms of plant life. In addition, insect attack (termites and ants) and excessive weathering and splitting at the pole top can contribute to pole failure or need for replacement. However, these failures are not as significant as ground-line decay, and typically happen much later in the pole’s life. By far the main cause of pole replacement is active decay in the groundline area of the pole to 18 inches below. Moisture and oxygen in this area greatly speed up the decay process. The number of defective poles is a public safety issue. It will normally not show up in the regular reliability reports. Poles are sized with safety factors to allow for the extreme loading conditions of storms. However, any defective pole problem will become increasingly apparent in storm situations. The poles will experience their maximum stresses during the icing and high-wind storm events. b. Distribution Wood Pole Inspection Program - Overview CL&P owns and maintains 425,972 wood distribution poles. CL&P has been purchasing CCA (Chromated Copper Arsenate, treated) southern yellow pine wood distribution poles for roadside installation since the mid-1980s. This pole type is one of the more durable types available. For off-road rights-of-way, CL&P purchases Pentachlorophenol treated southern yellow pine wood poles, known as a Penta pole. Penta poles are easier to climb than the CCA poles but not as 43 UI’s rate is 14.4 and the highest that Liberty has seen at other utilities is about 14 per 100 circuit-miles. April 16, 2012 The Liberty Consulting Group page 35
  6. Page 39 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 39 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 durable, so their use is restricted to the off-road circuits. CL&P estimates that 35 percent of its wood poles are CCA and 65 percent are a mixture of Pentachlorophenol and Creosote. A cyclic groundline excavation and inspection program is an industry best practice for determining whether poles are decayed. It is also the most economical means of preserving and lengthening the life of the pole. In a groundline program, a contractor will excavate around the pole at the groundline, inspect, add preservative treatment if needed, and wrap the pole in a protective wrap before backfilling. CL&P had been conducting groundline inspection programs since the early 1980s. In 1983, it was on a 10-year inspection cycle that it discontinued in the 90s. In 2006 and 2007, CL&P conducted pole inspections and developed unit cost data for a 2007 rate case. In 2007, CL&P requested and received funding to inspect approximately 30,000 poles per year (a 15-year cycle) beginning in 2008. The Vegetation Management section oversees the ground-line inspection and treatment program. Two contractors are currently doing the pole inspections, Osmose and United Pole Technologies (an Asplundh subsidiary). CL&P awards the unit rate contracts on annual bids. Purchasing will negotiate to hold the rate the same for another year, which results in multi-year contracts. The contractors reject poles based on a remaining strength calculation. They use a hand-held computer to record data, determine pole strength, and measure the wire and attachment load on each pole. They classify rejected poles as either priority rejects or normal rejects. CL&P replaces or makes safe priority rejects within five working days, and normal rejects within one year. CL&P has facilities attached to 388,407 wood poles that are owned and maintained by AT&T. AT&T generally follows a 10-year inspection cycle for maintaining their poles.44 c. Program Results The graphs below show the number and percentage of poles inspected since 2006.45 In recent years, CL&P has exceeded the 15-year target cycle schedule. 44 45 Audit Request AG-23 Audit Requests AG-23 & 26 April 16, 2012 The Liberty Consulting Group page 36
  7. Page 40 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 40 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The above graph shows the percentage of poles rejected. CL&P replaces about 647 reject poles each year. The reject rates are currently not high enough to be a concern. The rates will likely continue to climb until it excavates and treats all poles and the second inspection cycle begins. This will occur around 2022. If the reject rate climbs above the 5 to 6 percent range, it would be a concern. The graph to the left shows the age distribution of CL&P-owned poles and AT&T-owned poles. 46 The age distributions are very similar. This is reasonable since each company serves a common base of customers that required services to be connected in the same time period. AT&T does not treat poles to extend their life. If AT&T inspects a pole and finds that it has deteriorated or is defective, it replaces the pole. In the past, AT&T has not maintained records of the number of poles that passed inspection under the cyclical pole inspection process. Instead, AT&T maintained records on individual poles that failed inspection and require replacement. AT&T has begun to transition pole-inspection information to a database system to monitor better the status of inspections. AT&T is able to quantify data for 2010 and 2011 year to date only. Based on these data, AT&T has replaced about 1,600 poles each year for the past two years. This is more than double the annual replacement rate of the slightly larger CL&P system.47 The table below shows the number of pole failures during the 2011 storms for each company.48 Because the age distributions are similar, the percentage of pole failures of each company is also similar. When wind and snow/ice conditions are high enough to cause healthy trees to fail, it is common for the larger trees to snap poles in good condition. The number of pole failures experienced was a small percentage and is typical for the storm conditions that the CL&P area experienced. 46 Audit Request AG-22 Audit Request AG-27 48 Audit request AG-106 & 107 47 April 16, 2012 The Liberty Consulting Group page 37
  8. Page 41 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 41 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Poles Failed % Failed 2) Irene CL&P 854 0.20% AT&T 710 0.18% Snowstorm CL&P AT&T 1064 810 0.25% 0.21% Transmission According to pole inspection records, there are 15,901 wood poles on the CL&P transmission system. Western Red Cedar poles have been their standard for many years. This is one of the most durable pole types available. The company uses the same contractor used in distribution, Osmose, to inspect and treat the transmission poles on a ten-year cycle. It immediately turns in all rejects for replacement. The table below shows the number of rejects.49 These numbers are minimal. Transmission Wood Poles Inspected (Connecticut) 2007 2008 2009 2010 2011 Number Inspected 1,664 1,682 1,526 1,386 1,422 Number Rejected 4 3 2 7 0 Percent Rejected 0.24% 0.18% 0.13% 0.51% 0.00% There were not any wood pole failures in Irene. In the snowstorm, there were two wood pole failures. d. 1. Conclusions CL&P’s wood pole conditions did not appear to contribute materially to the effects of the 2011 storms. The number of pole failures experienced in these storms was a small percentage and was typical for the weather conditions encountered. The maintenance program in place is adequate to maintain the poles in the strength condition required by the NESC. Many of the pole failures were due to falling trees, both healthy trees and hazard trees, located outside of the clearance zone. e. Recommendations None. 3. Line Inspections & Maintenance a. Background Overhead line conductors, insulators, crossarms, and other hardware are subject to damage by outside forces such as public interference, storms, decay, and the general forces of nature. 49 Audit Request Liberty-80 April 16, 2012 The Liberty Consulting Group page 38
  9. Page 42 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 42 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Without consistent maintenance and inspections, normal aging and wear may result in outages. Decreased reliability, safety concerns, and the potential for unnecessary losses of revenue are eventual penalties of poorly maintained facilities. The NESC (National Electrical Safety Code) requires a periodic line inspection to maintain the lines in a safe condition. The National Electric Safety Code states: “Lines and equipment shall be inspected at such intervals as experience has shown to be necessary. NOTE: It is recognized that inspections may be performed in a separate operation or while performing other duties, as desired. Similar to poles, utilities size line conductors and hardware with safety factors to allow for the higher loading conditions of storms. However, any condition problem will become increasingly apparent in storm situations. Conductors and other hardware will experience their maximum stresses during the icing and high-wind storm events. b. Program Overview CL&P manages circuit reliability and inspections through a system of circuit zones. CL&P has 1,019 circuits. A Circuit Zone Manager is responsible for managing an engineering group of Circuit Owners. Their job functions include monitoring circuit and substation loads, planning, reliability and power quality investigations, running voltage profiles, and patrolling circuits. The Circuit Owners perform annual patrols of their assigned backbone circuit sections from January to the end of June. They log all items found into a system wide Patrol Database for tracking. CL&P enters work orders in the work management system for tracking. It uses five levels of defect classifications. If an item needs immediate attention, CL&P repairs it on a trouble ticket rather than through the work order system. CL&P prepares monthly reports on found and repaired items. The program calls for CL&P to repair all defective items by the end of the year. CL&P’s patrols formerly covered the entire circuit. CL&P backed off this approach and now patrols 25 percent of the fused circuit sections each year. In addition to the patrol by the Circuit Owners, CL&P performs an annual infrared scan (IR) on all of the backbone overhead circuit portions. CL&P performs most of the patrols by camera scans from a van. It does a walking IR scan for rear-lot line circuits. In addition to hot spots, this inspection logs any major repair or broken items noted and CL&P creates a work-order repair request with a priority and a scheduled complete date. CL&P has been doing some kind of IR inspections for the past 26 years. It created the present day 100 percent backbone program about five years ago. In addition to the circuit patrols and IR scans, certain critical line equipment has its own maintenance schedule. This equipment includes disconnect switches, ganged air break switches, reclosers, and automated sectionalizers. CL&P identifies the worst performing circuits and issues a top 100 list. Circuit Owners will review this list and develop improvement plans. April 16, 2012 The Liberty Consulting Group page 39
  10. Page 43 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 43 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 During storms, the Circuit Owners will generally be analyzing the circuits and helping in restoration planning. c. Program Results CL&P conducts the line patrols and tracks found items according to its plans. During the 2010 line patrol, it identified 674 defective items. The IR scan identified 315 items. Similar to tree interruptions, the number of overhead equipment interruptions during non-storm periods is a general indication of the ability of the system to weather storm events. This data is in the graphs below.50 Both the number of interruptions and the percentage of the total interruptions show a steady decline. Outside of the poles, the main overhead item replaced during the storms was a crossarm. The standard crossarms are eight or ten feet in length. Being smaller than wood poles, these arms should break more easily than a pole during storm events when a tree falls into the line. During Irene, it replaced 3,249 crossarms; during the snowstorm, it replaced 4,493 crossarms.51 For each storm, it replaced about twice the number of crossarms than poles. Due to the amount of large conductors and the covered tree wire conductors, some amount of this type of breakage is to be expected. d. 1. Conclusions CL&P’s overhead equipment conditions did not appear to contribute materially to the effects of the 2011 storms. However, the condition of the wood cross arms is unknown. CL&P has been conducting regular line inspection programs and replacing defective items found in a managed program. A circuit ownership process consisting of Circuit Owners has contributed to a steady decline of equipment caused interruptions on the overhead system. The amount of broken cross arms that it had to replace following a storm is a factor. These types of outages require several line crew hours each to replace. The cross arm breakage relates to the 50 51 2011 CL&P Transmission & Distribution Reliability Report Audit Request OCC-330 April 16, 2012 The Liberty Consulting Group page 40

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)