Interrogatory responses
Answers to questions 379, 380, 381, 382, 383
Files11
EOE-379_Final.pdf
PDF · 181 KB · 5 pagesText searchable
Download EOE-379_Final.pdfRead the text of EOE-379_Final.pdf
EOE-379 Attachment 1.pdf
PDF · 1.2 MB · 2 pagesText searchable
Download EOE-379 Attachment 1.pdfRead the text of EOE-379 Attachment 1.pdf
EOE-380_Final.pdf
PDF · 96 KB · 3 pagesText searchable
Download EOE-380_Final.pdfRead the text of EOE-380_Final.pdf
EOE-381_Final.pdf
PDF · 89 KB · 2 pagesText searchable
Download EOE-381_Final.pdfRead the text of EOE-381_Final.pdf
EOE-382_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download EOE-382_Final.pdfRead the text of EOE-382_Final.pdf
EOE-383_Final.pdf
PDF · 133 KB · 4 pagesText searchable
Download EOE-383_Final.pdfRead the text of EOE-383_Final.pdf
EOE-383 Attachment 1.pdf
PDF · 1.3 MB · 125 pagesText searchable
Download EOE-383 Attachment 1.pdfRead the text of EOE-383 Attachment 1.pdf
EOE-383 Attachment 2.pdf
PDF · 3.5 MB · 182 pagesText searchable
Download EOE-383 Attachment 2.pdfRead the text of EOE-383 Attachment 2.pdf
EOE-383 Attachment 3.pdf
PDF · 3.5 MB · 55 pagesText searchable
Download EOE-383 Attachment 3.pdfRead the text of EOE-383 Attachment 3.pdf
EOE-383 Attachment 4.pdf
PDF · 715 KB · 2 pagesText searchable
Download EOE-383 Attachment 4.pdfRead the text of EOE-383 Attachment 4.pdf
EOE-383 Attachment 5.pdf
PDF · 730 KB · 7 pagesText searchable
Download EOE-383 Attachment 5.pdfRead the text of EOE-383 Attachment 5.pdf
Text of EOE-381_Final.pdf
Extracted from the file · 2 pages · 3,490 characters
Text of EOE-382_Final.pdf
Extracted from the file · 1 page · 2,648 characters
Text of EOE-383_Final.pdf
Extracted from the file · 4 pages · 10,383 characters
Text of EOE-383 Attachment 1.pdf
Extracted from the file · 125 pages · 401,903 characters
Page 41 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 41 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Poles Failed % Failed 2) Irene CL&P 854 0.20% AT&T 710 0.18% Snowstorm CL&P AT&T 1064 810 0.25% 0.21% Transmission According to pole inspection records, there are 15,901 wood poles on the CL&P transmission system. Western Red Cedar poles have been their standard for many years. This is one of the most durable pole types available. The company uses the same contractor used in distribution, Osmose, to inspect and treat the transmission poles on a ten-year cycle. It immediately turns in all rejects for replacement. The table below shows the number of rejects.49 These numbers are minimal. Transmission Wood Poles Inspected (Connecticut) 2007 2008 2009 2010 2011 Number Inspected 1,664 1,682 1,526 1,386 1,422 Number Rejected 4 3 2 7 0 Percent Rejected 0.24% 0.18% 0.13% 0.51% 0.00% There were not any wood pole failures in Irene. In the snowstorm, there were two wood pole failures. d. 1. Conclusions CL&P’s wood pole conditions did not appear to contribute materially to the effects of the 2011 storms. The number of pole failures experienced in these storms was a small percentage and was typical for the weather conditions encountered. The maintenance program in place is adequate to maintain the poles in the strength condition required by the NESC. Many of the pole failures were due to falling trees, both healthy trees and hazard trees, located outside of the clearance zone. e. Recommendations None. 3. Line Inspections & Maintenance a. Background Overhead line conductors, insulators, crossarms, and other hardware are subject to damage by outside forces such as public interference, storms, decay, and the general forces of nature. 49 Audit Request Liberty-80 April 16, 2012 The Liberty Consulting Group page 38Page 42 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 42 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Without consistent maintenance and inspections, normal aging and wear may result in outages. Decreased reliability, safety concerns, and the potential for unnecessary losses of revenue are eventual penalties of poorly maintained facilities. The NESC (National Electrical Safety Code) requires a periodic line inspection to maintain the lines in a safe condition. The National Electric Safety Code states: “Lines and equipment shall be inspected at such intervals as experience has shown to be necessary. NOTE: It is recognized that inspections may be performed in a separate operation or while performing other duties, as desired. Similar to poles, utilities size line conductors and hardware with safety factors to allow for the higher loading conditions of storms. However, any condition problem will become increasingly apparent in storm situations. Conductors and other hardware will experience their maximum stresses during the icing and high-wind storm events. b. Program Overview CL&P manages circuit reliability and inspections through a system of circuit zones. CL&P has 1,019 circuits. A Circuit Zone Manager is responsible for managing an engineering group of Circuit Owners. Their job functions include monitoring circuit and substation loads, planning, reliability and power quality investigations, running voltage profiles, and patrolling circuits. The Circuit Owners perform annual patrols of their assigned backbone circuit sections from January to the end of June. They log all items found into a system wide Patrol Database for tracking. CL&P enters work orders in the work management system for tracking. It uses five levels of defect classifications. If an item needs immediate attention, CL&P repairs it on a trouble ticket rather than through the work order system. CL&P prepares monthly reports on found and repaired items. The program calls for CL&P to repair all defective items by the end of the year. CL&P’s patrols formerly covered the entire circuit. CL&P backed off this approach and now patrols 25 percent of the fused circuit sections each year. In addition to the patrol by the Circuit Owners, CL&P performs an annual infrared scan (IR) on all of the backbone overhead circuit portions. CL&P performs most of the patrols by camera scans from a van. It does a walking IR scan for rear-lot line circuits. In addition to hot spots, this inspection logs any major repair or broken items noted and CL&P creates a work-order repair request with a priority and a scheduled complete date. CL&P has been doing some kind of IR inspections for the past 26 years. It created the present day 100 percent backbone program about five years ago. In addition to the circuit patrols and IR scans, certain critical line equipment has its own maintenance schedule. This equipment includes disconnect switches, ganged air break switches, reclosers, and automated sectionalizers. CL&P identifies the worst performing circuits and issues a top 100 list. Circuit Owners will review this list and develop improvement plans. April 16, 2012 The Liberty Consulting Group page 39Page 43 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 43 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 During storms, the Circuit Owners will generally be analyzing the circuits and helping in restoration planning. c. Program Results CL&P conducts the line patrols and tracks found items according to its plans. During the 2010 line patrol, it identified 674 defective items. The IR scan identified 315 items. Similar to tree interruptions, the number of overhead equipment interruptions during non-storm periods is a general indication of the ability of the system to weather storm events. This data is in the graphs below.50 Both the number of interruptions and the percentage of the total interruptions show a steady decline. Outside of the poles, the main overhead item replaced during the storms was a crossarm. The standard crossarms are eight or ten feet in length. Being smaller than wood poles, these arms should break more easily than a pole during storm events when a tree falls into the line. During Irene, it replaced 3,249 crossarms; during the snowstorm, it replaced 4,493 crossarms.51 For each storm, it replaced about twice the number of crossarms than poles. Due to the amount of large conductors and the covered tree wire conductors, some amount of this type of breakage is to be expected. d. 1. Conclusions CL&P’s overhead equipment conditions did not appear to contribute materially to the effects of the 2011 storms. However, the condition of the wood cross arms is unknown. CL&P has been conducting regular line inspection programs and replacing defective items found in a managed program. A circuit ownership process consisting of Circuit Owners has contributed to a steady decline of equipment caused interruptions on the overhead system. The amount of broken cross arms that it had to replace following a storm is a factor. These types of outages require several line crew hours each to replace. The cross arm breakage relates to the 50 51 2011 CL&P Transmission & Distribution Reliability Report Audit Request OCC-330 April 16, 2012 The Liberty Consulting Group page 40Page 44 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 44 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 fact that it is a weaker member than the pole, and will often fail first when a tree contacts the line. Based on the number of aged or broken cross arms reported on the annual backbone and lateral patrols (30 per year over the past three years52), the number of cross arms being replaced annually in maintenance programs appears to be very low. This is well under any sustainable rate. Liberty estimates that CL&P should be replacing well over 1,000 crossarms per year for a sustainable rate.53 CL&P has both wood and fiberglass cross arms. The overall condition of these wood cross arms could be a concern. Liberty is not able to validate this concern without a field inspection. e. Recommendations III-CL&P-2 Verify the condition of the wood cross arms on the system and put in place a program to replace them at a sustainable rate. Line crew hours for cross arm replacement in storms is a large factor in increasing the length of the outages. The current annual replacement rate of the cross arms appears to be well below a sustainable rate. Without field inspection and more data, Liberty could not be more specific on this recommendation, nor conclude that CL&P was not adequately inspecting cross arms. B. UI 1. Vegetation Management a. Program Overview UI has 3,293 pole-line miles of distribution circuits that it must trim. About 90 percent of the conductors are insulated types such as tree wire or aerial cable. The remaining 10 percent is bare conductor. UI has been trimming on the same cycle since 1998. It is a mixed program of 4- and 8-year cycles. It trims all two- and three-phase portions of lines (fused and mainline) on a fouryear cycle. Every 8 years, it trims the entire circuit of single and three-phase lines. It trims about 460 miles annually. The 2010 trim budget was $3.2M. The single-phase portions are also on a RCM (Reliability Centered Maintenance) program. It trims all taps having two or more outages (excluding major storms) in a rolling 3-year period. There is a 6-foot clearance limit trimmed from the conductor and a 10-foot limit from the pole. The standard construction has the conductors on an 8-foot cross arm. Overhang clearance is 12 to 15 feet. These clearances used to be smaller but were increased in 2005. 52 Audit Request Liberty-88 Based on the number of poles, CL&P likely has about 400,000 wood crossarms. With an average 25-year life, it would have to replace about 16,000 in an average year (including those replaced with an entire new pole). 53 April 16, 2012 The Liberty Consulting Group page 41Page 45 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 45 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 With regard to overhang, UI’s specifications require that trees or limbs hazardous to the operation of the line be patrolled and every effort made to remove them. UI added hazard tree removal processes to the vegetation program in 2005. The tree contractor employs Permissions People who identify hazard trees. A different crew comes behind and does the tree takedowns. UI pays for hazard trees on unit rates from a budget separate from that for the cycle trimming. Some large trees are on time and materials rate. Other sources such as customer or local official requests, or UI reliability engineers may identify hazard trees. b. Program Results In the recent past, System Maintenance has been responsible for the vegetation management program. The Line Clearance staff has consisted of one arborist and two Line Clearance technicians. In December 2011, System Maintenance was moved from EPE (Engineering & Project Excellence) to ESO (Electric System Operations). Line Clearance has moved out from under System Maintenance and UI created a new position of Manager, Vegetation Management & Line Clearance. Lewis Tree has had the tree maintenance contract from 2008-2011. They are now on an interim contract for six months while UI negotiates a new four-year contract. Lewis Tree has 19, mostly two-person, crews working. There are three Permissions People and two General Forman. April 16, 2012 The Liberty Consulting Group page 42Page 46 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 46 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The graph above shows the trim cycle for the past ten years.54 This cycle length is the annual trim-miles divided by the total circuit-miles. Due to the mixed four- and eight-year trim cycle, the cycle length period is high for the tree density. The number of non-storm tree caused interruptions is steady, with a possible upward trend.55 The year 2010 was a more active year in terms of outlier days (both those days that qualified as “major storm” and those days that were slightly below the “major storm” criteria). For 2010, there were about 14.4 tree-caused interruptions per 100 circuit miles. The graph above shows the percentage of non-storm interruptions due to trees.56 Less than 20 percent of all non-storm outages are due to trees. The next graph shows the hazard tree actual expenditures (year 2011 is a budget figure).57 The budget and expenditures have not been consistent. In 2007, UI reduced the budget by $30K due 54 Audit Request AG-14 2011 UI Transmission & Distribution Reliability Report 56 2011 UI Transmission & Distribution Reliability Report 57 Audit Request AG-15 55 April 16, 2012 The Liberty Consulting Group page 43Page 47 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 47 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 to overall budget constraints. It deferred approximately $100K from 2008 into 2009. The 2011 dollars reflect $23K that UI advanced from the 2012 budget. Based on the total circuit miles to be trimmed, the $176K 2011 funding would be about $53 per mile. c. 1. Conclusions Certain aspects of UI’s tree trimming program may have increased the severity of storm damage. UI trims single-phase circuit portions every eight years. While there is also some reliabilitycentered maintenance being conducted on these lines, the eight-year cycle allows for increased vegetation density that will cause storm outages. In addition, the hazard-tree removal budget has not had consistent funding in past years. The budgeted rate of $53 per mile allows the removal of only very high priority hazard trees. d. III-UI-1 Recommendations Institute a four-year full cycle trim program and a more aggressive hazardtree removal program. A more aggressive vegetation management program to reduce overhanging material, increase clearances and remove more hazard trees will improve both storm and non-storm reliability. 2. Wood Pole Maintenance a. Program Overview UI owns and maintains 84,481 wood poles. Starting in 1997, UI inspected poles on a 12-year cycle and continued through 2002. In 2002, the company completed 5,082 pole inspections in the sixth year of the 12-year cycle. In 2003, UI temporarily stopped to evaluate the program. In 2004, UI implemented a new comprehensive inspection and maintenance program as part of an asset management strategy for distribution wood pole infrastructure. In 2004 and 2005, UI completed a visual check and sounding on all UI custodian poles to determine physical condition and to identify deteriorated poles for replacement. In 2006, the Company implemented a new inspection and treatment program over a planned 6-year period. Beginning in 2012, the 6-year cycle will be complete and the pole inspection program will migrate to a 10-year cycle. b. Program Results The graphs below show the number and percentage of poles inspected since 2006.58 UI has been exceeding the 6-year target cycle schedule. 58 Audit Request AG-26 April 16, 2012 The Liberty Consulting Group page 44Page 48 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 48 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The graph above shows the percentage of poles rejected.59 UI replaced about 44 poles each year in the 6-year cycle program. The reject rates are currently not high enough to be a concern. With a new inspection cycle starting in 2012, the reject rates should be at or below these levels. This graph shows the age distribution of the UI poles compared to the CL&P and AT&T poles.60 The reduced percentage of poles over 40 years old on the UI system is significant. The table below shows the number of wood pole failures during the two major 2011 storms.61 The failure percentages were minimal. Irene Snowstorm Poles Failed 84 17 % Replaced 0.099% 0.020% 59 Ibid Audit Request AG-22 61 Audit Request AG-170 & 171 60 April 16, 2012 The Liberty Consulting Group page 45Page 49 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 49 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 c. 1. Conclusions UI’s pole conditions did not appear to contribute materially to the effects of the 2011 storms. UI recently completed an aggressive six-year ground-line inspection and treatment program to improve the condition of its poles. The maintenance program in place is adequate to maintain the poles in the strength condition required by the NESC. These pole conditions did not contribute materially to the effects of the 2011 storms. d. Recommendations None. 3. Line Inspections & Maintenance a. Program Overview The same contractor, Utility Pole Technology, who does the pole groundline treatment program also performs the overhead circuit-inspection program. This contract was in place from 2009 to 2011. Osmose was the contractor prior to that period. Starting in 2006, the groundline treatment program, and hence the visual inspection program, was on a 6-year cycle. UI completed that cycle and is now evaluating whether to stay on the 6-year cycle or go to a 10-year cycle. The contractor uses a GIS extract loaded in a handheld data unit for the line inspections. It reports all data electronically to the Project Manager of Pole Inspection. They review the data and separate it according to VM, pole replacements, double poles, or repair items. The Line Department receives repair items. The contractor calls in priority items. Inspection entries are in an Access database for tracking. UI does not enter or track repair schedules. In addition to this line inspection, an infrared inspection is included in the Reliability Centered Maintenance (RCM) Program. UI inspects three-phase main lines and three-phase fused side taps annually. Single-phase fused side taps off main lines are on a performance basis. UI inspects bulk substations semi-annually and distribution substations annually. Internal work crews in the Test Department conduct an annual IR inspection of the three-phase portions of the circuits. The survey is a ride-by in a van. They are able to identify and capture some defective items as they ride by. They send the results to a contracted Maintenance Engineer. They forward the repair items to the Line Department by either calling or e-mail. There is no database of the repair or hot spot items logged. b. Program Results Similar to tree interruptions, the number of overhead equipment interruptions during non-storm periods is a general indication of the ability of the system to weather storm events. These data are April 16, 2012 The Liberty Consulting Group page 46Page 50 of 182
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 50 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 in the graphs below.62 The number of interruptions appears to be holding steady. The percentage of the total interruptions shows a steady decline. UI replaced 165 broken crossarms during Irene. Due to the amount of large conductors and the covered tree wire conductors it uses, some of this type of breakage is to be expected. c. 1. Conclusions UI’s overhead circuit conditions did not appear to contribute materially to the effects of the 2011 storms. A program for inspection and repair of defective items is in place and had held the number of non-storm overhead equipment caused failures steady. The amount of cross arms replaced during the storms also appears to have been reasonable for the conditions experienced. d. Recommendations None 62 2011 UI Transmission & Distribution Reliability Report April 16, 2012 The Liberty Consulting Group page 47
Text of EOE-383 Attachment 3.pdf
Extracted from the file · 55 pages · 132,814 characters
Text of EOE-383 Attachment 4.pdf
Extracted from the file · 2 pages · 4,635 characters
Text of EOE-383 Attachment 5.pdf
Extracted from the file · 7 pages · 11,175 characters
As listed on the current system
Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026