Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 48 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 48 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The graph above shows the percentage of poles rejected.59 UI replaced about 44 poles each year in the 6-year cycle program. The reject rates are currently not high enough to be a concern. With a new inspection cycle starting in 2012, the reject rates should be at or below these levels. This graph shows the age distribution of the UI poles compared to the CL&P and AT&T poles.60 The reduced percentage of poles over 40 years old on the UI system is significant. The table below shows the number of wood pole failures during the two major 2011 storms.61 The failure percentages were minimal. Irene Snowstorm Poles Failed 84 17 % Replaced 0.099% 0.020% 59 Ibid Audit Request AG-22 61 Audit Request AG-170 & 171 60 April 16, 2012 The Liberty Consulting Group page 45
  2. Page 49 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 49 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 c. 1. Conclusions UI’s pole conditions did not appear to contribute materially to the effects of the 2011 storms. UI recently completed an aggressive six-year ground-line inspection and treatment program to improve the condition of its poles. The maintenance program in place is adequate to maintain the poles in the strength condition required by the NESC. These pole conditions did not contribute materially to the effects of the 2011 storms. d. Recommendations None. 3. Line Inspections & Maintenance a. Program Overview The same contractor, Utility Pole Technology, who does the pole groundline treatment program also performs the overhead circuit-inspection program. This contract was in place from 2009 to 2011. Osmose was the contractor prior to that period. Starting in 2006, the groundline treatment program, and hence the visual inspection program, was on a 6-year cycle. UI completed that cycle and is now evaluating whether to stay on the 6-year cycle or go to a 10-year cycle. The contractor uses a GIS extract loaded in a handheld data unit for the line inspections. It reports all data electronically to the Project Manager of Pole Inspection. They review the data and separate it according to VM, pole replacements, double poles, or repair items. The Line Department receives repair items. The contractor calls in priority items. Inspection entries are in an Access database for tracking. UI does not enter or track repair schedules. In addition to this line inspection, an infrared inspection is included in the Reliability Centered Maintenance (RCM) Program. UI inspects three-phase main lines and three-phase fused side taps annually. Single-phase fused side taps off main lines are on a performance basis. UI inspects bulk substations semi-annually and distribution substations annually. Internal work crews in the Test Department conduct an annual IR inspection of the three-phase portions of the circuits. The survey is a ride-by in a van. They are able to identify and capture some defective items as they ride by. They send the results to a contracted Maintenance Engineer. They forward the repair items to the Line Department by either calling or e-mail. There is no database of the repair or hot spot items logged. b. Program Results Similar to tree interruptions, the number of overhead equipment interruptions during non-storm periods is a general indication of the ability of the system to weather storm events. These data are April 16, 2012 The Liberty Consulting Group page 46
  3. Page 50 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 50 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 in the graphs below.62 The number of interruptions appears to be holding steady. The percentage of the total interruptions shows a steady decline. UI replaced 165 broken crossarms during Irene. Due to the amount of large conductors and the covered tree wire conductors it uses, some of this type of breakage is to be expected. c. 1. Conclusions UI’s overhead circuit conditions did not appear to contribute materially to the effects of the 2011 storms. A program for inspection and repair of defective items is in place and had held the number of non-storm overhead equipment caused failures steady. The amount of cross arms replaced during the storms also appears to have been reasonable for the conditions experienced. d. Recommendations None 62 2011 UI Transmission & Distribution Reliability Report April 16, 2012 The Liberty Consulting Group page 47
  4. Page 51 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 51 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 IV. Storm Monitoring and Predicting A. CL&P 1. Weather Monitoring Initial storm response begins with weather monitoring. It is an industry best practice to use a professional weather service to provide custom impact reports for the system. Telvent Corporation provided weather forecasting services for all Northeast Utilities companies, including CL&P.63 In addition to Telvent, CL&P also relied heavily on the forecasts from the National Weather Service (NWS), National Hurricane Center. These services were an input used by CL&P management in determining the appropriate readiness actions. CL&P started weather monitoring conference calls with their storm team four days64 in advance of Irene and one day in advance of the snowstorm.65 The Director - System Operations provides the weather forecast information to the CL&P storm organization. They provided two electronic weather reports each day. The weather forecaster will normally sit in on all conference calls where they anticipate the storm level to be level three66 or above. Telvent participated in conference calls with the Division Coordinators for the 2011 storms. The storm team is able to ask Telvent “what if” questions and other forecast questions. The storm team went through preparedness checklists on these calls. The CL&P storm team also had a conference call with the NWS on Thursday before the snowstorm, which occurred on the following Saturday. The CL&P storm team did not express full confidence in the Telvent forecasts. Some of the interview comments were: • Suspect that Telvent is being overly conservative or aggressive when their forecast is compared to other forecasts • They missed it • Telvent needs to have a better understanding of the damage to company facilities done by certain weather events. • Telvent has disappointed three times – “three strikes and you’re out.” Need to have conversation with the weather provider • Not comfortable with Telvent at this time. 2. Predicting Resource Requirements Based on a detailed weather forecast, it is an industry best practice to use the forecast for estimating damages and predicting resource requirements. The CL&P ERP does not specifically address a process/system to predict damage.67 Prior to tropical storm Irene, CL&P reviewed the 63 Audit Request EL-3 Audit Request EL-1 65 Audit Request EL-13 66 A level-three storm event is a serious event affecting less than 40,000 customers. 67 Audit Request Liberty-22 64 April 16, 2012 The Liberty Consulting Group page 48
  5. Page 52 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 52 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 historical restoration information from Hurricane Gloria. During the review, CL&P personnel discussed the safety record, damage, resources, duration, and other issues that it had to address during the restoration. Tropical storm Irene and Hurricane Gloria had similar paths and wind speeds. CL&P used Gloria as a gauge to predict the damage from tropical storm Irene. The snowstorm was unprecedented and the lead-time was much shorter. CL&P did not have a prior storm to use as a gauge for damage prediction. 3. 1. Conclusions The CL&P storm team lacks confidence in the present weather vendor. A competent professional weather vendor is critical to the initial storm response. A good forecast allows the utility to prepare properly for the event. CL&P does not have confidence in the present NU weather vendor. 2. CL&P does not have a pre-storm resource prediction process in place. CL&P used past storm history for estimating resource requirements. This process is crude and inaccurate. NU is working with the University of Connecticut’s School of Engineering to develop a predictive weather damage model. The development of this tool is currently in progress. The tool, when completed, will allow NU to better prepare itself for forecasted inclement weather by predicting the amount and area of damage the infrastructure will sustain. 4. Recommendations IV-CL&P-1 Use a weather vendor that has the confidence of the storm team. CL&P and NU should either address and correct the issues causing a lack of confidence or use a vendor that will have the confidence of the CL&P storm team. IV-CL&P-2 Develop a pre-storm resource prediction process. A pre-storm damage and resource prediction model is necessary for proper storm planning and deployment. B. UI 1. Weather Monitoring Western Connecticut State University (WCSU) provided daily weather forecasts to UI.68 They provided a morning and afternoon forecast. UI has used WCSU for several years and is pleased with its performance. UI also used the National Hurricane Center as a source of information as to the potential impact on its service territory and other areas along the eastern seaboard. WCSU 68 Audit Request EL-2 April 16, 2012 The Liberty Consulting Group page 49
  6. Page 53 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 53 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 provided an impact warning for Irene to UI six days in advance. UI began weather briefings with the storm team five days in advance. In the snowstorm, UI began weather briefings on Thursday, two days before the storm occurred. The UI Incident Managers held private calls with the weather service vendor. The vendor did not participate on storm team conference calls. Based on early weather forecasts, UI began planning for a level one event (minor) on Thursday, then upgraded to level two event (significant) on Friday, and level three event (extensive) on Saturday. 2. Predicting Resource Requirements UI does not have a predictive resource requirements model.69 UI predicted the level of the storm based on a matrix in the EPP. The matrix listed only basic information on resources such as whether any outside mutual assistance is required and which system processes should be activated. 3. 1. Conclusions UI had a weather-monitoring vendor in place. Western Connecticut State University (WCSU) provided daily weather forecasts to UI. UI has used WCSU for several years and is pleased with its performance. 2. UI does not have a pre-storm resource prediction process in place. UI does not have any process in place for pre-storm estimating of resource requirements. It must therefore make mutual assistance resource decisions based solely on experience and a feel for the storm. This method leads to varying degrees of accuracy. 4. IV-UI-1 Recommendations Develop a pre-storm resource prediction process. A pre-storm damage and resource prediction model is necessary for proper storm planning and deployment. 69 Interview #6, 1/19/12 April 16, 2012 The Liberty Consulting Group page 50
  7. Page 54 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 54 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 V. Storm Preparations A. CL&P 1. Preparation Actions – Storm Irene Once CL&P receives a weather alert or forecast, it starts the process of pre-storm planning. Prestorm planning activities are numerous and often hectic. Liberty categorized and reviewed the pre-storm planning activities in three overall groups: • Triggering necessary storm plan support functions and processes • Achieving full readiness status of field response personnel • Pre-storm resource deployment and planning CL&P followed the preparation activities70 described in its ERP, Section 1-Basic Plan, page 10: 4.0 Preparedness Activities and Section 2-District Plan, page 10: 3.1 Preparedness Activities. a. Triggering of Storm Plan Support Functions CL&P conducted the following activities involving storm-plan support functions:71 • Developed and updated contact lists for state and municipal officials. • Determined numbers of support personnel necessary to supplement the emergency response positions. Support resources included patrollers, analyzers, wire guards, food/lodging, town/customer liaisons, stores, facilities, transportation, media, crew guides, and satellite teams. • Checked with Stores personnel and verified material availability. Stores reviewed material inventory based on the damage from hurricane Gloria. Stores also notified suppliers that it might need additional “on-demand” deliveries. • Ensured environmental support was available for oil spill response. The NU Environmental Department opened their EOC. • Ensured the Account Executive and communications groups were in place to support external communications to life support customers, state/local governments, priority customers, and media. • Conducted a training course for new wire guards. While CL&P successfully organized on relatively short notice, the substance of the training proved to be less than optimal. • Requested NU EMG to assign CL&P a dedicated project manager from Base Logistics. Base Logistics is the contractor responsible for establishing and maintaining large-scale staging areas and satellite facilities for the Company. • Food & Lodging secured 5,745 hotel rooms and the required meals for incoming mutual aid and contractor crews. • Transportation made a schedule for on-site fueling at each work location. 70 71 Audit Request AG-1 Audit Request AG-95 and EL-1 April 16, 2012 The Liberty Consulting Group page 51
  8. Page 55 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 55 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 b. Achieving full readiness status of field response personnel CL&P conducted the following activities involving its field response personnel and associated facilities: • Cancelled vacations for all NU employees. Placed CL&P line crews on-call. • Determined availability of employees assigned to District ICS positions. • Conducted a hurricane preparations drill and tabletop exercise with employees assigned to General Staff ICS roles as outlined in the ERP. The drill started with a refresher on ICS roles and responsibilities for General Staff and Command Staff positions. The tabletop exercise focused on staffing and response strategies. • Checked District storm rooms for readiness. Secured all outside material to prevent blowing debris. • Activated all District Incident Command Posts Saturday evening. This included a contingent of line crews for responding to priority one E911 calls. c. Pre-storm resource deployment and planning CL&P conducted the following activities involving resource deployment and planning: • Classified Irene as a level five event.72 The Emergency Operations Center opened on Friday, August 26 at 12:02 pm. • Conducted weather monitoring. (Refer to Section V, Storm Monitoring and Predicting, of this report.) • Scheduled daily storm preparation conference calls with Division and District management and internal storm support organizations to review and evaluate district operations preparedness using the Hurricane Preparations Check List. • Conducted mutual aid conference calls with the New England Mutual Aid Group (NEMAG) and the New York Mutual Aid Group (NYMAG) groups daily from August 24 through August 28. On August 24, CL&P requested that the NU EMG secure 200 outside line crews. On August 25, CL&P requested the NU EMG to secure an initial 100 outside line crews, making the total request 300 crews. On Friday, August 26, CL&P requested NU EMG to secure an initial 200 outside line crews, making the total request 500 crews. • Secured and pre-positioned helicopters for reconnaissance. • Initiated plans to ensure that it completed all project work by Friday and restored the system to its normal configuration. CL&P defeated the circuit-distribution loop schemes73 on Friday, August 26. • Opened the EOC in partial activation mode as of 8:45 a.m. Friday to further support and organize company-wide planning and coordination activities. CL&P fully activated the EOC at 12:02 p.m. • Provided a liaison to the state EOC beginning at 9:00 a.m. on Friday. • Deployed 250 down-wire guards to work centers across Connecticut on Saturday, August 27. 72 A level five event is the highest level of storm plan activation in the ERP. This action prevented the automatic reclosing of loop line devices in the storm. It greatly enhanced public safety from downed tree wire conductors and protected electrical equipment that might have been damaged by the storm. 73 April 16, 2012 The Liberty Consulting Group page 52
  9. Page 56 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 56 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • Secured 250 tree crews for restoration activities. CL&P did not fully establish satellite (or staging) areas. Utilities should plan and identify satellite areas prior to the storm arrival. This action greatly speeds up the restoration response for that area. In the areas where CL&P did establish satellites, it did not identify the actual locations before the arrival of the storm.74 It did not have lease agreements in place with the site owners prior to the storm’s arrival. As a result, CL&P could not pre-stage the satellite area with items such as maps, computers, and phone lines. The Company established four satellite areas during the Irene restoration. 75 The table below shows these areas. They were fully equipped, full-service staging areas. The implementation procedures to setup and mobilize staging areas of this caliber are complicated and require numerous pre-storm planning actions. Locations ***Waterford Speedbowl 1080 Hartford Turnpike Waterford, CT 06385 Westbrook Outlets 314 Flat Rock Place Westbrook, CT 06498 Willimantic AWC 1270 Main Street Willimantic, CT 06226 Brooklyn Fairgrounds 15 Fairground Road Brooklyn, CT 06234 Current Capacity Feeding Maximum Capacity Feeding Parking Capacity (Trucks) * Feeding Busing 300 Tue 8/30 @1700 500 150 Yes Yes 200 Wed 8/31 @0600 400-500 100 Yes Yes Satellite Trailers Stores Trailers Environmental / Scrap Xfrm Fueling Security Yes Yes and Mobile Command Center Yes Yes Yes 24/7 Yes Yes Yes 24/7 No No Yes 24/7 Yes TBD Yes 24/7 200 Tue 8/30 @1700 200 50 Yes Yes No Trailer Operate out of Wmtc Bldg 200 Wed 8/31 @0600 450 150-200 Yes Yes Yes CL&P’s satellite triggering procedures76 were cumbersome and unclear. CL&P’s procedure EP2022 required Division Directors to develop and maintain a list of staging area locations and satellite locations. The procedures also stated “(Preferably Satellite and Staging Areas at the same location or in very close proximity).” The concept of what is a satellite area and what is a staging area was not clear. CL&P’s ERP had the triggering mechanism at the district level, a bottom-up approach. It is an industry best practice that utilities centrally manage staging areas/satellite areas as a system storm-team function due to the close ties these areas have with crew mobilization plans. Most centrally managed staging area functions, including site identification and maintenance, are part of the logistics support group due to the close ties with functions such as lodging, meals, busing, and security. A lack of pre-deployment of outside line crew resources was evident. Liberty reports on this issue in report Section VIII, Recruitment and Deployment of Outside Resources. The escalating 74 Audit Request AG-38 Audit Request OCC-199 76 Audit Request Liberty-64 75 April 16, 2012 The Liberty Consulting Group page 53
  10. Page 57 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 57 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 numbers of crew resource requirements for a relatively consistent storm forecast was also evident. Report Section V, Storm Monitoring and Predicting, addresses this issue. 2. Preparation Actions – Snowstorm There was a much shorter time available for pre-storm planning in the snowstorm. The weather services did not predict the event until Thursday, October 27. CL&P understands that the prediction of timing and severity of winter storms is much more difficult than with hurricanes. Nevertheless, CL&P responders interviewed believed Telvent’s prediction could have been more aggressive and helpful. At approximately 11:00 a.m. on Saturday, October 29, rain turning to heavy wet snow and strong winds began affecting Connecticut. By 10:00 a.m. on Sunday, October 30, the snowstorm had left between 8 and 16 inches of heavy wet snow across the western and central portions of the state with lesser amounts along the shoreline and southeastern Connecticut. The same pre-storm actions CL&P conducted in Irene were still necessary for the snowstorm despite the reduced planning period. However, the reduced timeframe available meant that some actions took place after the storm hit. CL&P’s actions included: • Participated in NWS conference call briefings starting on Thursday, October 27. CL&P System Operations notified division management of the potential of a snowstorm and that more information would be available on Friday. • Conducted the first storm preparation call only one day in advance, on Friday October 28. CL&P alerted support organizations at that time. • Confirmed that snow removal contractors were available. • Requested that NU EMG secure an initial 30 outside line crews on Friday. Requests for outside crews evolved as outage numbers grew and damage information received. Shortly after 12:00 noon Saturday, CL&P increased the initial request for 200 crews to 300 by about 3:15 p.m., increased again to 500 at about 7:00 p.m., and then to 750 by at about 10:20 p.m. • Partially activated the EOC at 12:00 noon Saturday. It fully activated the EOC at 1 p.m. • Called in all CL&P crews, local wires-down, and patrol employees by about 2:30 p.m. • Started the decentralization process at 3:35 p.m. District Incident Command Posts began to open in anticipation of E-911 calls. They staffed each area with additional line crews and tree crews. CL&P discussed decisions for satellite areas in their EOC calls on Sunday after the storm hit.77 It eventually opened the satellite/staging areas shown in the table below. 78 Execution of satellite/staging areas is a complex operation and should be an integral part of the pre-storm planning actions. 77 78 Audit Request Liberty-37 Audit Request OCC-199 April 16, 2012 The Liberty Consulting Group page 54

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)