Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 57 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 57 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 numbers of crew resource requirements for a relatively consistent storm forecast was also evident. Report Section V, Storm Monitoring and Predicting, addresses this issue. 2. Preparation Actions – Snowstorm There was a much shorter time available for pre-storm planning in the snowstorm. The weather services did not predict the event until Thursday, October 27. CL&P understands that the prediction of timing and severity of winter storms is much more difficult than with hurricanes. Nevertheless, CL&P responders interviewed believed Telvent’s prediction could have been more aggressive and helpful. At approximately 11:00 a.m. on Saturday, October 29, rain turning to heavy wet snow and strong winds began affecting Connecticut. By 10:00 a.m. on Sunday, October 30, the snowstorm had left between 8 and 16 inches of heavy wet snow across the western and central portions of the state with lesser amounts along the shoreline and southeastern Connecticut. The same pre-storm actions CL&P conducted in Irene were still necessary for the snowstorm despite the reduced planning period. However, the reduced timeframe available meant that some actions took place after the storm hit. CL&P’s actions included: • Participated in NWS conference call briefings starting on Thursday, October 27. CL&P System Operations notified division management of the potential of a snowstorm and that more information would be available on Friday. • Conducted the first storm preparation call only one day in advance, on Friday October 28. CL&P alerted support organizations at that time. • Confirmed that snow removal contractors were available. • Requested that NU EMG secure an initial 30 outside line crews on Friday. Requests for outside crews evolved as outage numbers grew and damage information received. Shortly after 12:00 noon Saturday, CL&P increased the initial request for 200 crews to 300 by about 3:15 p.m., increased again to 500 at about 7:00 p.m., and then to 750 by at about 10:20 p.m. • Partially activated the EOC at 12:00 noon Saturday. It fully activated the EOC at 1 p.m. • Called in all CL&P crews, local wires-down, and patrol employees by about 2:30 p.m. • Started the decentralization process at 3:35 p.m. District Incident Command Posts began to open in anticipation of E-911 calls. They staffed each area with additional line crews and tree crews. CL&P discussed decisions for satellite areas in their EOC calls on Sunday after the storm hit.77 It eventually opened the satellite/staging areas shown in the table below. 78 Execution of satellite/staging areas is a complex operation and should be an integral part of the pre-storm planning actions. 77 78 Audit Request Liberty-37 Audit Request OCC-199 April 16, 2012 The Liberty Consulting Group page 54
  2. Page 58 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 58 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 District Satellite/ Location Activation Date Person Feeding Truck Capacity Capacity Tues Dinner 500 max Initial Presence Need Busing Meals Truck Fueling Y Y Y Y Y Y Y Y 11/12 - ALL SATELITE AND STAGING AREAS CLOSED Simsbury Satellite/Staging Galasso Monday, 60 South Main Rt187 10/31 Cheshire Staging Lake Compounce Tuesday, 186 Enterprise Drive 11/01 Bristol Waterbury Staging Timex Monday, 199 Park Road 10/31 Middlebury Hartford Staging Pequot Lot Wed.11/2 410 Market St (at Pequot St.) behind Citgo Hartford Satellite Rocky Hill S/S Monday, 699 West St 10/31 Rocky Hill Newtown Satellite Squantz Pond Firehouse 255 Route 39 New Fairfield Arbor Acres Monday, East HamptoSatellite 480 Marlborough Rd 10/31 Glastonbury Off Rte 94 Newtown Satellite Sunset-Ridgefield Sat 11/5 79 Sunset Lane Ridgefield Simsbury Staging Big E Fairgrounds CL&P Mon 1305 Memorial 11/7 Avenue West Springfield, MA Newtown Simsbury Staging only eff. Fairfield Hills Monday, Sun 11/6 3 Primrose Street 10/31 (off Wasserman Way or Mile Hill Road) Newtown Satellite West Farms Mall Monday, (JCPenney Side) 10/31 300 West Farms Rd Farmington Tolland Satellite East Windsor (L.S.) Monday, 112 Prospect Hill Rd 10/31 East Windsor Hartford Satellite Tolland Satellite Manchester S/S 109 Olcott St Manchester So. Windsor S/S 751 Nutmeg St. So. Windsor Hartford Staging 3. 1. Ct Jr Republic 550 Ocean Ave Litchfield CT 126 cots 755 Rainbow Road Tradeport Ind. Park Windsor, CT In Service tbd Y 11/1-Done 1st Meal Tue 700 tbd Y dinner Done for 11/1 1st Meal Mon 400 max tbd Y Evening (750 cars) Done for (450) 10/31 11/2 Tents 500 ~400 Y 11/2 Dinner 11/01/2011 (Closed 11/5) At Marriott Y ? Y ?? Sat 11/5 CL&P Mon 11/2 dinner Y 500 N Y N 1st Meal Mon Evening (125) 500 tbd Y Done for 10/31 Y Y Tuesday n/a tbd Y NO Y 10/31/2011 Y In Service N N Y Fri. 11/4 1st meal 11/4 dinner 1000 0 Y Y N Conclusions CL&P’s pre-storm planning actions properly mobilized support functions. CL&P’s support personnel were involved in the planning process. Support resources mobilized and actively participated at the onset of the storm. April 16, 2012 The Liberty Consulting Group page 55
  3. Page 59 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 59 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 2. CL&P’s pre-storm planning actions achieved full readiness status of the internal field response personnel. CL&P’s internal response resources mobilized and actively participated at the onset of the storm. CL&P also opened district storm centers and placed them in a state of readiness. 3. CL&P’s pre-storm planning actions did not achieve the necessary external crew mobilization. CL&P’s pre-storm planning did not set the necessary level of external crew mobilization. Liberty addresses this issue, including any associated recommendations, in report Section VIII, Recruitment and Deployment of Outside Resources. 4. CL&P’s pre-storm planning actions and organization for satellite and staging area support was not timely. CL&P did not setup the satellite areas in a timely manner. It needs several areas of improvement in the satellite area planning process. The concepts and definitions of satellite areas and staging areas are not clear. The triggering procedures were cumbersome. The overall approach for identification and layout was weak. CL&P’s process lacks strong central control and management. 4. V-CL&P-1 Recommendations Improve the organization, planning, and execution for satellite and staging area setup. Satellite and staging areas are a critical part of the outside crew mobilization process. There is a close connection between the need for the areas and their locations to the damage prediction process. A staging area that is properly located, planned, and organized improves restoration productivity. CL&P has recognized that it needs some improvements in its satellite area process.79 Some of the planned improvements are: • Revise Emergency Plan Operating Procedure (EPOP) M3-EP-2022 to ensure satelliteoperating procedures incorporate more detailed instructions on staging area logistics, e.g., satellite layout, pre-staged equipment, maps, communications, parking schematics, copy machines, and supplies. This has a completion date of September 29, 2012. • Evaluate existing satellite locations and add, remove, or change locations as required to ensure optimum sites are available for future major restoration events. Secure written lease agreements with site owners. This has a completion date of April 29, 2012. • Add the definition of a “Satellite” in the CL&P Emergency Plan. This has a completion date of April 29, 2012. 79 Audit Request AG-38 April 16, 2012 The Liberty Consulting Group page 56
  4. Page 60 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 60 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 B. UI 1. Preparation Actions– Storm Irene UI’s weather provider notified the company on Monday, August 22, at 2:15 p.m. that Irene could affect Connecticut late Sunday. Because of this early warning, UI initiated its restoration planning efforts on Tuesday, August 23.80 This timeline allowed at least five full days for prestorm planning. Based on early weather forecasts, UI began planning for a level one (minor) storm plan event, then upgraded to level two event (significant) on Friday, and to a level three event (extensive) on Saturday. UI’s pre-storm preparation actions included the following: • Conducted a table-top hurricane drill on Monday • Conducted storm team planning meetings • Defined the potential damage impact • Acquired additional line clearance and line construction crews. UI requested100 crews on Friday, and raised that to 200 crews on Saturday. • Developed specific storm staffing plan and schedules • Developed a restoration strategy • Planned communications and stakeholder contact • Conducted safety training • Conducted logistics planning • Implemented the municipal and state communication plan on Wednesday, August 24, at 7:00 am when the Municipal Liaison Team Coordinators first informed their assigned towns of UI’s contingency plans regarding Irene. • Established communications channels with first responders and provided specific training for regional fire departments on August 25. • Conducted system integrity activities such as returning the system to normal • Cancelled all planned work • Pre-staged all storm responders, including the staffing of all key substations • Pre-staged material at strategic locations • Procured staging area locations • Procured accommodations for mutual assistance contractors • Mobilized all UI first shift storm room personnel During the pre-storm period, the Restoration Manager was responsible for guiding the preparation including conducting conference calls. Once UI activated the EOC, the Incident Manager took over the conference calls and guidance of the organization. UI generally held calls at around 8 a.m. and 2 p.m. each day, and occasionally at night. Calls ran from one to two hours. 80 Audit Request EL-1 April 16, 2012 The Liberty Consulting Group page 57
  5. Page 61 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 61 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 2. 1. Conclusions UI’s pre-storm planning actions properly mobilized the support functions. UI’s support personnel were involved in the planning process. These support resources were mobilized and actively participating at the onset of the storm. 2. UI’s pre-storm planning actions achieved full readiness status of the internal field response personnel. UI’s internal response resources were mobilized and actively participating at the onset of the storm. The also opened district storm centers and placed them in a state of readiness. 3. Recommendations None. April 16, 2012 The Liberty Consulting Group page 58
  6. Page 62 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 62 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 VI. Emergency Organization Major outage events such as the two 2011 storms that are the subject of this report are not “business as usual” for electric utilities. One key element in the successful response to such storms is the structure and effectiveness of the emergency response organization. A common mistake among utilities in responding to major outages is the failure to organize properly and effectively to respond to the unique challenges presented. This mistake normally occurs for one or two reasons – the failure of the utility to predict properly the scope and severity of the event, or the failure to adequately organize and staff their emergency responders to match the challenge facing them. This section of the report focuses on the structure and performance of the CL&P and UI emergency response organizations. CL&P and UI based their organizational structures on their emergency plans. The following comments address the structures in place during the response to Hurricane Irene and the October snowstorm. A. CL&P NU and CL&P engaged all of their emergency organizations in the response to Hurricane Irene and the October snowstorm. Appendix VI-1 contains charts showing the top two layers of organizational structure for the System (NU) and Area/Division/District (CL&P) commands. The response personnel at all levels, System, Area, Division, and District, were utility operations veterans with good experience in storm response. 1. System Command The information in the CL&P ERP does not provide a precise description of the System Command organization. There is a chart that shows the System Commander, the Area Commanders of the three operating companies (including CL&P), and the Mutual Aid Director.81 This is obviously just a skeleton chart showing the basic functions under System Command. There is confusion regarding the membership of the System Command. The NU Executive VP and COO filled the System Commander position. NU officers were part of System Command, but there is no specific document showing the exact make-up of that command organization. The plan states that the Manager, System Restoration and Emergency Preparation, has the responsibility of activating System Command82. The manager did this in conjunction with an NU officer. System Command operated out of an executive conference room at NU South (Berlin, CT) where NUEOG is located.83 One officer interviewed said that each operating company directed the restoration, and System Command was there to “oversee and assure,” and maintained an “active dialog” with the operating companies beginning before impact. With regard to Mutual Aid, System Command acted as an “agent” for operating companies in securing outside help.84 This is by far the most 81 CL&P ERP, Section 4, 2.8, page 11 CL&P ERP, Section 1, 4.1.4, page 13 83 Interview #75, March 14, 2012 84 Interviews #2, December 15, 2011, and #73, March 12, 2012 82 April 16, 2012 The Liberty Consulting Group page 59
  7. Page 63 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 63 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 significant contribution that System Command made to the overall restoration performance of CL&P. Another officer interviewed said that System Command exercised more command and control, ruling on decisions involving crew allocation and relocation when necessary. This officer said that he did not think the description of “oversee and assure” fully described the System Command role.85 It is obvious that there is a lack of clarity and understanding as to the make-up and role of System Command. System Command (NUEOG) initiated daily conference calls on Tuesday, August 23, 2011, in advance of Hurricane Irene. The three operating companies and all corporate support functions participated in these calls. The focus of the calls was on emergency preparedness. There was no confirmation that System Command held preparedness calls in advance of the October snowstorm. Additionally, the System Command coordinated support from NU Environmental, Safety, Security, Stores, and Facilities. It appears that System Command functioned somewhat in a command and control role, making decisions as necessary when raised to its level. Otherwise, during these two storms the primary contribution of System Command was in securing Mutual Aid assistance. Based on the NU/CL&P application of ICS, considerable authority and responsibility for emergency response is pushed down to the operating company, even in major events as the two in question in which the entire NU system was involved. 85 Interview #74, March 14, 2012 April 16, 2012 The Liberty Consulting Group page 60
  8. Page 64 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 64 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 2. Area Command The organizational chart below shows the structure of the Area Command in place during the response to Hurricane Irene and the October snowstorm.86 As shown in the chart, the Logistics Section Chief was responsible for twelve separate response functions. For the most part, the Logistics role was to provide resources requested by the divisions. Logistics was not accountable for the performance of five of these functions: Vegetation Management, Analyzing, Outside Line Resources, Wires Down, and Patrol (Damage Assessment). Logistics served as an agent to the Area Commander and the Divisions in these five areas. During the Irene response, there was a lag in communications from the logistics chief to the food/lodging people, as large numbers of outside crews began to arrive. To help with this, CL&P changed the procedure during the October storm to provide more assistance from the System level.87 In the Irene response, CL&P fully activated Area Command at noon Friday, August 26, 2011. They staffed the district storm rooms and had them ready at 6:00 p.m., Saturday, August 27. Irene made landfall at 10:00 a.m., August 28. Wind speed was building up and crews were called 86 87 CL&P ERP, Section 4, Emergency Response Organizations, page 14 Interviews #2, December 15, 2011, and #73, March 12, 2012 April 16, 2012 The Liberty Consulting Group page 61
  9. Page 65 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 65 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 back to work centers because of the wind at 3:30 a.m. In the October response, CL&P activated Area Command shortly after 1:00 p.m., Saturday, October 29, 2011. Heavy snowfall was occurring at that time. The district command posts began to open shortly after 3:30 p.m. Area Command commenced Storm Operations conference calls on Sunday, August 28, and Sunday, October 30, respectively for the two storms, and held three such calls per day until restoration was complete. Area Command requested outside assistance from the NU Mutual Aid Director in both storms. Liberty addresses the topic of recruitment and deployment of outside resources in a later chapter. Prior to landfall of Irene, Area Command reviewed the CL&P response to the 1985 storm, Hurricane Gloria. One item discovered was the number of flashover outages due to sea spray. Based on the forecast for the same type conditions in Irene, CL&P made the decision to defeat all of the loop feeds. (This process opens all tie points between circuits to assist in accurate outage detection.) Area Command arranged helicopter patrols for both storms. They also requested and received assistance from senior management of the two other operating companies and the transmission group in both storms. Throughout the restoration effort of both storms, Area Command provided support and monitored resources and remaining customer outages. The CL&P EOC closed at 6:00 p.m. Tuesday, September 6, and Wednesday, November 8, respectively.88 88 Responses to Audit Requests EL-001 and EL-013, and Interview #27, January 4, 2012 April 16, 2012 The Liberty Consulting Group page 62
  10. Page 66 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 66 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 3. Division Command The chart below shows the division emergency response organization.89 According to CL&P, it was not operating under the Division command structure for either storm. In the CL&P application of ICS, CL&P uses the division command structure for storms that only affect the work centers within one division. The Division Commander has the authority to move all resources within a division. Once the storm involves multiple divisions it becomes necessary to engage Area Command. At this point, the authority to move resources is no longer in the control of the Division Commander. CL&P predetermined that it would not need the Division Command structure prior to the landfall of Storm Irene and prior to the snowstorm. CL&P decided to move the staff from the Division Command positions to the staff positions needed for the anticipated number of satellites. CL&P also decided to leave the Division Commander in place to keep the number of direct reports to the Area Commander and District commanders as low as possible. 90 Division Directors 89 90 CL&P ERP, Section 4, page 24 Response to Liberty Audit Requests 084 and 097. April 16, 2012 The Liberty Consulting Group page 63

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)