Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 65 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 65 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 back to work centers because of the wind at 3:30 a.m. In the October response, CL&P activated Area Command shortly after 1:00 p.m., Saturday, October 29, 2011. Heavy snowfall was occurring at that time. The district command posts began to open shortly after 3:30 p.m. Area Command commenced Storm Operations conference calls on Sunday, August 28, and Sunday, October 30, respectively for the two storms, and held three such calls per day until restoration was complete. Area Command requested outside assistance from the NU Mutual Aid Director in both storms. Liberty addresses the topic of recruitment and deployment of outside resources in a later chapter. Prior to landfall of Irene, Area Command reviewed the CL&P response to the 1985 storm, Hurricane Gloria. One item discovered was the number of flashover outages due to sea spray. Based on the forecast for the same type conditions in Irene, CL&P made the decision to defeat all of the loop feeds. (This process opens all tie points between circuits to assist in accurate outage detection.) Area Command arranged helicopter patrols for both storms. They also requested and received assistance from senior management of the two other operating companies and the transmission group in both storms. Throughout the restoration effort of both storms, Area Command provided support and monitored resources and remaining customer outages. The CL&P EOC closed at 6:00 p.m. Tuesday, September 6, and Wednesday, November 8, respectively.88 88 Responses to Audit Requests EL-001 and EL-013, and Interview #27, January 4, 2012 April 16, 2012 The Liberty Consulting Group page 62
  2. Page 66 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 66 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 3. Division Command The chart below shows the division emergency response organization.89 According to CL&P, it was not operating under the Division command structure for either storm. In the CL&P application of ICS, CL&P uses the division command structure for storms that only affect the work centers within one division. The Division Commander has the authority to move all resources within a division. Once the storm involves multiple divisions it becomes necessary to engage Area Command. At this point, the authority to move resources is no longer in the control of the Division Commander. CL&P predetermined that it would not need the Division Command structure prior to the landfall of Storm Irene and prior to the snowstorm. CL&P decided to move the staff from the Division Command positions to the staff positions needed for the anticipated number of satellites. CL&P also decided to leave the Division Commander in place to keep the number of direct reports to the Area Commander and District commanders as low as possible. 90 Division Directors 89 90 CL&P ERP, Section 4, page 24 Response to Liberty Audit Requests 084 and 097. April 16, 2012 The Liberty Consulting Group page 63
  3. Page 67 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 67 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 (Commanders) assisted Area Command or District Commands.91 The district commands were then in effect reporting directly to Area Command. The organizational modifications mentioned above were not in accordance with the CL&P ERP. This approach is reflective of the CL&P view of the Incident Command Structure (ICS). The division command is in reality not a part of the CL&P emergency organization in any outage event in which it activates Area Command. The fact that CL&P left Division Commanders in place to reduce the number of direct reports raises more questions about this organizational approach. 4. District Command The chart below shows the district emergency organization.92 91 92 Interview #74, March 14, 2012. CL&P ERP, Section 4, page 28 April 16, 2012 The Liberty Consulting Group page 64
  4. Page 68 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 68 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 In the Irene response, CL&P had fully staffed district storm rooms and had them ready at 6:00 p.m., Saturday, August 27. Irene made landfall at 10:00 a.m., August 28. Wind speed was building up and CL&P called crews back to work centers because of the wind at 3:30 a.m. In the October response, CL&P began activating the district command posts shortly after 3:30 p.m., Saturday, October 29. It staffed the district work centers with additional line and tree crews.93 It used satellite command centers in these two storms for the first time. A commander and support staff the satellite command, which reports to the district command.94 The district emergency organization has a good design. It could provide the necessary control, command, and support. Liberty covers the specifics of the performance of the district emergency organization in the chapter on field restoration. 5. 1. Conclusions The level of engagement by NU and CL&P and the experience level of response leaders were good, and helped facilitate the restoration. NU and CL&P engaged all of their emergency organizations in the response to Hurricane Irene and the October snowstorm. The response personnel at all levels – System, Area, Division, and District – were utility operations veterans with good experience in storm response. 2. There are opportunities to strengthen the CL&P emergency organization by shifting more direct authority and responsibility for the response effort up to System Command. (See Recommendation 1) There is a lack of clarity and understanding as to the make-up and role of System Command. In a major storm response affecting all operating companies, the NU System Command in large part functions in a coordination and support role, and does not direct the restoration activities. NU views System Command as supporting CL&P, but that CL&P implements. With regard to Mutual Aid, System Command acts as an “agent” for operating companies in securing outside help. 3. The effectiveness of Area Command was limited because it functioned more in a support role for several key response functions. (See Recommendation 2) The Logistics group reporting to the Area Commander was not accountable for the performance of five of these functions – Vegetation Management, Analyzing, Outside Line Resources, Wires Down, and Patrol (Damage Assessment). Rather, its role was that of agent or broker to secure requested resources. The Area Command organization should include functional team leaders with specific accountability for performance in these key areas. 93 94 Responses to audit requests EL-001 and EL-013 Interview #37, January 6, 2012 April 16, 2012 The Liberty Consulting Group page 65
  5. Page 69 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 69 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 4. CL&P’s decision not to activate the division commands limited the effectiveness of the emergency organization. (See Recommendation 3) CL&P was not operating under the Division command structure for either storm. In the application of ICS, CL&P uses the division command structure for storms that only affect the work centers within one division. The Division Commander has the authority to move all resources within a division. Once the storm involves multiple divisions it becomes necessary to engage Area Command. At this point, the authority to move resources is no longer in the control of the Division Commander. This eliminates a level of management that is needed in major events. 5. The CL&P district emergency organization provides the framework to support an effective response. In both storms, CL&P opened and staffed the district commands in good time. The district emergency organization has a good design. It could provide the necessary control, command, and support. In the Irene response, CL&P had fully staffed district storm rooms and had them ready at 6:00 p.m., Saturday, August 27. Irene made landfall at 10:00 a.m., August 28. In the October response, CL&P began activating the district command posts shortly after 3:30 p.m., Saturday, October 29. 6. Recommendations VI-CL&P-1 Modify the storm management structure and processes to clarify the makeup and role of System Command and place more direct authority and responsibility at System Command. System command needs to implement and manage the restoration effort across the NU system in storms such as Irene and the October snowstorm. The wording in the NU and CL&P emergency plans should effect the change the role of System Command from providing support and working as an agent for the operating companies to a clear leadership role. The plan should clearly describe the precise membership of the System Command. VI-CL&P-2 Strengthen the Area Command structure with regard to its direct functional control in key areas. The Area Command organization should include team leaders with specific accountability for performance in functions such as Vegetation Management, Wires Down Coordinator (including specifically the road clearing work with municipalities), and Damage Assessment. VI-CL&P-3 Activate the division command posts in all major outage events as set forth in its emergency plan. The CL&P ERP wording on division commands does not include their elimination when more than one division is involved. CL&P would improve its storm response by having the benefit of command and control at the division level. April 16, 2012 The Liberty Consulting Group page 66
  6. Page 70 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 70 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 B. UI 1. Organization The chart below represents the UI emergency organization that responded to Hurricane Irene and the October snowstorm.95 Due to the size and compact nature of the UI service area, the response was under the command and control of one incident manager who reported directly to UI executive leadership. Executive Management Legal Counsel Joint Information Center (Process) Incident Manager Incident Manager Liaison Restoration Staff & Process Public Information Team Leader Planning Team Leader Operations Team Leader Logistics Team Lead Liaison Team Leader Finance & Admin Team Leader IT & Telecom Team Leader HR, Training & Safety Team Top management had a consistent presence at the EOC – one officer was there at all times – CEO; President; Senior VP; VP, Customer Fulfillment. The incident commander for both storms was the UI Director, Operations, an experienced utility operations veteran. UI broke the service area into three geographic areas – West, Central, and East. Each area contained five to six towns. UI crews were in one area, “internal contractors” (those who work on UI property on a full-time basis) were in another area, and Mutual Assistance crews from other utilities and “external contractors” worked in the third area. The purpose in doing this was for control. They did move some crews from one area to another as the need arose. Crews worked directly out of EOC. Crew leaders would work with crews and report in at the EOC. 95 UI EPP, figure 3.e.1, page 22 April 16, 2012 The Liberty Consulting Group page 67
  7. Page 71 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 71 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 During the two storms, UI handled the response on the transmission system in this manner. The Operations Manager, reporting to the Incident Manager, carried out patrol and damage assessment. The Operations Manager forwarded patrol information to the Transmission Business Unit. Field crews were under the Operations Manager. UI contracted out transmission construction and the Vegetation Management group was responsible for tree-related outages on the transmission system.96 The UI emergency organization was well structured for its service area, and contributed positively to the restoration. Liberty covers the specifics of its performance in the chapter on Field Restoration. 2. 1. Conclusions – UI Emergency Organization UI was well organized in the response to the two storms. Due to the size and compact nature of the UI service area, the response was under the command and control of one incident manager who reported directly to UI executive leadership. The UI service area was in three geographic areas for the response to the storms – West, Central, and East. Each area contained five to six towns. UI crews were in one area, “internal contractors” (those who work on UI property on a full-time basis) were in another area, and Mutual Assistance crews from other utilities and “external contractors” worked in the third area. The purpose in doing this was for control. UI moved some crews from one area to another as the need arose. Crews worked directly out of EOC. Crew leaders would work with crews and report in at the EOC. 3. Recommendations None. 96 Interview UI 11, February 8, 2012 and UI EPP (12/1/2011) Appendix 9.2 April 16, 2012 The Liberty Consulting Group page 68
  8. Page 72 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 72 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Appendix VI-1 – CL&P Emergency Response Organization97 System Commander Area Commander CL&P Area Commander WMECo Area PSNH Commander Mutual Aid Director 97 CL&P ERP, Section 4, Emergency Response Organization April 16, 2012 The Liberty Consulting Group page 69
  9. Page 73 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 73 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 April 16, 2012 The Liberty Consulting Group page 70
  10. Page 74 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 74 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 VII. Emergency Alerts and Mobilization In preceding chapters, this report addressed the topics of emergency plans, storm monitoring and predicting, storm preparations, and emergency organizations among other topics. The topic of this chapter – emergency alerts and mobilization – follows in sequential order. “Getting ahead of the curve” is critical in any major outage response. A good plan and well-trained response team need a proven process to alert the emergency organization and mobilize early. “Alerts” refers to the process of raising the awareness of a pending event and directing preparation activities, and “mobilization” is the activation of command centers, pre-staging of key response teams, and bringing in resources from other locations. A. CL&P 1. The 2011 Storms The following table, which Liberty also discusses in Chapter II, Emergency Plans, provides CL&P’s classification of service outage events.98 Classification of Service Outage Events Expected # of Trouble Spots Level Event Characteristics Expected # Customers Likely to be Affected Level I Small Impact Event < 10,000 1 to 50 Level II Moderate Impact Event < 20,000 51 to 450 Level III Serious Impact Event < 40,000 451 to 950 Level IV Major System Impact Event < 80,000 951 to 1800 Level V Extreme Event Major System Impact > 1800 >100,000 Expected Duration Expected Event Frequency ICS Activation < 12 hours > 75 per year Managed by the SOC and District personnel 12 to 24 Hours < 25 per year 24 to 48 Hours < 10 per year 101 to 175 District, NU System, & Mutual Aid Crews (Note 2) 48 to 72 Hours < 5 per year over 175 District, NU System and Mutual Aid Crews (Note 3) > 72 Hours Once every 5 Years Expected Number & Type of Crews Required 1 to 25 CL&P Crews (Note 1) 26 to 75 CL&P Crews (Note 1) 76 to 100 CL&P, NU System Crews, & Mutual Aid Crews (Note 1) Managed by the SOC, District and Division Command Managed by the District Incident Commander, Division Command, and Area Command Managed by the District Incident Commander, Division Command, Area Command, and System Command Managed by the District Incident Commander, Division Command, Area Command, and System Command Notes: 1. Corporate Personnel pre-positioning is unlikely except for extenuating circumstances. 2. Corporate Personnel pre-positioning is optional but more likely. 3. Corporate Personnel pre-positioning is expected. In hurricane Irene, NU/CL&P used a hurricane checklist to guide its alert process, following the prescribed activities beginning five days before anticipated landfall.99 This process engaged all 98 CL&P ERP , Section 1, page 23 April 16, 2012 The Liberty Consulting Group page 71

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026