ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 87 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 87 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 IX. Damage Assessment and Restoration Status Response team leaders need information. They need to know how much damage the system sustained, and they need to know the status of the restoration effort (e.g., number of circuits restored and orders completed). The diagram below depicts the overall flow of damage assessment and restoration status information. Field Damage Assessment Patrol Reports Stakeholders Amount & Type of Damage Restoration Status Emergency Operations Center Direction & Information Work Completed Orders Closed Restoration Updates from OMS and Field Work Centers Field Work Centers Restoration Crews To lead effectively a restoration effort, storm team leaders must promptly receive complete, thorough damage information. They also depend on ongoing status updates from the field and outage management systems. This chapter addresses how CL&P and UI performed in assessing damage and maintaining situational awareness of the progress of the restoration. 1. CL&P a. Emergency Plan Directives The CL&P Emergency Response Plan (ERP) assigns the responsibility for restoration status updates on district analyzers, the district operations section chief, and the district planning section chief. At area command, this responsibility lies with the planning section chief.119 119 CL&P ERP, Section 2, 3.7.2, Section 4, 4.2.1, Section 4, 6.2.1, and Section 4, 6.3.1 April 16, 2012 The Liberty Consulting Group page 84
  2. Page 88 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 88 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Emergency plan section ME-EP-2010 Rev. 3, dated 9-27-2010, Damage Assessment Patrols, contains the requirements for damage assessment. A central team organization is in place and provides additional patrol team support to the districts. CL&P implemented the central team support organization in 2001. The main positions identified and described in the procedure are a Centralized Patrol Coordinator and a Divisional Patrol Coordinator. The duties of the Centralized Patrol Coordinator are to: • Coordinate training of Centralized Patrol Team members • Store and maintain equipment required during performance of patrol duties • Coordinate vehicle acquisitions and allocation for patrollers • Provide Centralized Patrol Teams to perform patrols of distribution lines and facilities. The Centralized Patrol Coordinator also maintains a Centralized Patrol Team Assignment Tracking Log and a Centralized Patrol Team Roster. The duties of the Divisional Patrol Coordinator are to: • Direct Divisional Patrol Team and Centralized Patrol Teams assigned to Division and assign patrol routes to team members • Provide logistical support to Patrol Teams including provision of all patrol maps, forms and data utilization • Forward information from Patrol Reports to Divisional Analyzing Team • Continuously evaluate need for additional Patrol support. The emergency plan uses the term “Divisional.” The Division storm organizations do not have storm teams or Patrol Coordinators in place. The teams in the field are district teams managed by the District Patrol Coordinators. On the Area Command storm organization charts, the Centralized Patrol Coordinator reports to the Logistics Chief through the General Unit Leader. The Division charts are not clear on the reporting chain. The division plan does not mention the position of Divisional Patrol Coordinator. On the District storm organization charts, the Patrol Coordinator reports to the Planning Section Chief. When CL&P makes the decision to begin opening the Emergency Operations Center (EOC), the Emergency Operations Group initiates the centralized patrol function by a conference call to key personnel. Members of the Centralized Patrol Team may be from any department. When CL&P decides to begin staffing the Divisional Incident Command Center, it also normally determines the initial need for Divisional Patrol Team support. It may subsequently determine the need for Divisional Patrol Team support at any time. CL&P draws Divisional Patrol Team members from technicians, meter and service personnel, cable splicers, electricians, and circuit owners. For normal storms, the districts patrol backbone circuits with their district teams. CL&P generally uses central teams for side-tap patrolling in larger storms. At the District level, patrol personnel give assessment information to analyzers for preparation of work packets and work April 16, 2012 The Liberty Consulting Group page 85
  3. Page 89 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 89 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 planning. In addition to marking a circuit map with a red pencil, the Patrol Team completes Form 760 “Damage Assessment Patrol Report.” b. 2011 Storm Performance Findings CL&P implemented the damage assessment procedure in the 2011 storms. Central Patrol dispatched about 176 patrollers, 120 or 88 two-person teams, in each storm. The districts also dispatched 118 two-person local district teams and five one-person teams. CL&P has 1,019 circuits on the system (3.44 circuits per two-person team deployed). Liberty concluded that the amount of CL&P patroller resources deployed was adequate. In addition, Central Patrol used patrol contractors for the first time in the snowstorm. Three to four contractor companies provided 107 teams (214 contractors). Central Patrol Team Performance The Central Patrol Coordinator managed the process with two reports that serve as co-workers and alternates. They conducted training to 316 individuals in 2010. 121 They also conducted additional training in 2011. The Patrol Coordinator and the Logistics Chief have joint responsibility for patroller training. The Logistics Chief forwards training needs to the Patrol Coordinator, who lines up the actual training. The Training Department conducts training using e-learning modules. The Patrol Coordinator maintained a list of central patrollers available from all internal resources.122 The Patrol Coordinator used patrollers from the other NU companies, contractors, and retirees on the teams. Team makeup consisted of an A and a B person. The A person was fully qualified, trained, and experienced. The B person had at least the basic safety training. The B person functioned as a driver and could also have been receiving some on-the-job training. CL&P seldom used one-person teams. A one-person team investigated trouble tickets rather than patrolled circuits. There was an overlap in the resources between different functions. For example, some of the Wires Down people or Town Liaisons also worked as damage assessment patrollers. The Central Patrol had lists of individuals, not predetermined teams. The Patrol Coordinator paired up people and assigned them to teams and locations when they reported. CL&P realizes now that this is a weakness and slowed down the deployment speed. It is now considering maintaining a listing of predetermined teams matched with districts. Other than providing and tracking the teams, Central Patrol was not involved in the damage assessment process during the storms. The districts manage the deployed teams. The districts that Liberty interviewed were pleased with the process of using central patrol teams and the quality of the team members. The District Patrol Coordinators were not involved with determining the number of central teams that were necessary, but they felt comfortable with the number of teams they received. 120 Audit Request #OCC-15 Audit Request #OCC-15 122 There were 288 people on the list as of 2/14/12 per Audit Request Liberty-94 121 April 16, 2012 The Liberty Consulting Group page 86
  4. Page 90 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 90 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Utilities use damage assessment information in two manners, system-wide and locally. In the system-wide use, utilities total the data and estimate resource requirements. In the local use of damage assessment, utilities determine the damage for each individual outage and provide the ETR (estimated time of restoration) and work order packet for that outage. CL&P’s Central Patrol is not involved in any processes that use the damage assessment information on a systemwide basis. Thus, CL&P loses an opportunity to use available initial damage assessment information to develop overall crew resource requirements. District Patrol Team Performance Each of the 14 districts used their local district patrollers as the first resource. District patrollers come from district employees such as service designers (technicians), projects personnel (engineers), substation maintenance personnel, underground line crew personnel, and meter services personnel. Each district executed this process in a slightly different manner. Analyzers provided outage information to the District Patrol Coordinators. Some of the coordinators were more involved than others in this part of the process. Either the analyzers or the Patrol Coordinator prioritized the circuits. The Patrol Coordinator then assigned a team to each circuit or trouble spot. If there were more affected circuits than teams, they assigned the teams by substations. CL&P conducted damage assessment on 16-hour daytime shifts. The teams collected data by highlighting information on paper maps. They called in priority concerns to the dispatchers. Some patrollers investigated 911 calls from the dispatchers. The patrollers also called in the underground locate information for broken poles so that work can proceed quicker. When the patrol was complete, the teams returned the marked up maps to the storm room analyzers for data entry. Most of the coordinators were involved in the data entry process. Several coordinators reported that the hardest part of the entire process was getting the data into the system and modeling EDS (Electronic Dispatch System) correctly. The teams did not use the patrol forms for reporting data. The damage assessment data entered in EDS is a verbal description of the repair items necessary for each trouble spot. The EDS system then generates a work order packet for repair of the trouble spot. Generally, the marked-up maps stayed in the storm room, not given to the crews. The District Patrollers did not perform an analysis of resource requirements using the collected damage information. The coordinators interviewed were not aware of an analysis conducted elsewhere. Patrol Coordinators listed the quantity of broken poles and posted them on a storm board. This was the only totaled data reported. The District Patrol Coordinator was responsible for all field team management. The plan did not define any field patrol-team group leader positions. The Centralized Patrol Coordinator pulled other District Patrol Coordinators from unaffected Districts and deployed them if more field management was needed. When the district was through with the central team, they released the team back to the EOC. If the district desired crew guides or bird dogs, the district requested this through the EOC. Many of the district patrollers were assigned to another process when the patrol work was complete. April 16, 2012 The Liberty Consulting Group page 87
  5. Page 91 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 91 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 Liberty found the following concerns and inconsistencies occurred during the 2011 storms: • Some District Patrol Coordinators estimated the percent of lines patrolled on a regular basis while others did not. • Some teams gave the marked-up maps to the crew foremen for use. Most maps remained in the storm room. • The process inundates the storm room with paper. Managing the information was a challenge. CL&P’s use of technology in the process was low. One coordinator had two patrollers who used laptops with air cards rather than paper maps. They could enter the data straight into the EDS system. The Coordinator felt this is the best way to go for the future. • Several of the District Patrol Coordinators had additional storm duties. • Either the patroller training requirements or the expectations are inconsistent. The District Patrol Coordinators interviewed were pleased with the quality of the patrollers sent to them, but other interviewees often mentioned patroller expertise as an issue. • Process improvement and process ownership is weak or remote. The District Patrol Coordinators do not participate in peer team meetings or lessons learned processes as a group. Restoration Status Performance CL&P reported that it followed the ERP in monitoring restoration status during Irene and the October storm. The CL&P district analyzers interpreted the outage information from OMS. The district incident commander or planning section chief ensured that damage assessment information was received. The planning section chief managed the overall effort of collecting, analyzing, processing, and reporting restoration information. The planning section chief also had the responsibility to see that the restoration projections were accurate and timely. The operations section chief analyzed the damage and crew availability data, analyzed the estimated restoration times for the district, and assisted in the development of the Incident Action Plan (IAP). During the two storms, the area planning section chief analyzed the data on damage, crew availability, and estimated restoration completion times. This position also estimated personnel requirements, requested additional resources, and developed the area command IAP.123 There were breakdowns in this process, as CL&P had problems in both storms with situational awareness. CL&P was late in discovering the extent of damage and help required during Irene. As a result, this significantly increased the requested number of outside crews five days after Irene’s landfall. CL&P was late in getting all patrolling complete, finishing eight days after impact in Irene, and nine days after impact in the October snowstorm. This delay affected the accuracy of restoration projections, which was a significant issue in both storms. Another issue was the communication from the field to the command center as jobs were completed. The 123 CL&P response to Liberty audit request #25, CL&P ERP, Section 2, 3.7.2, Section 4, 4.2.1, Section 4, 6.2.1, and Section 4, 6.3.1 April 16, 2012 The Liberty Consulting Group page 88
  6. Page 92 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 92 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 process was labor-intensive; there were no mobile data terminals in the field vehicles, and information had to be entered manually. This also caused a delay in updating restoration status, c. 1. Conclusions CL&P has in place the basic structure of a centralized damage assessment process. CL&P’s Damage Assessment Patrol procedure defines the roles of Centralized Patrol Coordinator and field Patrol Coordinator. It also establishes training requirements, team maintenance requirements, and basic patroller deliverables in the field. A centralized patrol or damage assessment function is an industry best practice. CL&P implemented the central patrol team concept in 2001. 2. CL&P did not use the damage assessment data on a system-wide basis to estimate resource requirements. The basic circuit patrol responsibilities defined in the Damage Assessment Patrol procedure have a targeted focus on getting the work-order packet information entered and prepared. The storm plans do not contain information on procedures to total the data or the use of the overall damage assessment information for resource requirement determination. CL&P lost an opportunity to use available initial damage assessment information to develop overall crew resource requirements. 3. The patrolling processes at the district levels were inconsistent. In general, the overall damage assessment process did not have strong process ownership management. The centralized functions were limited to providing trained teams. Other than training on an as-requested basis, Central Patrol was not involved in process management during or after the storms. There is a lack of peer involvement with the District Patrol Coordinators as a group to define and improve the process. There is a lack of any central lessons learned process for the patrol function. This resulted in inconsistencies such as: • Processes were inconsistent across the districts • The paper process overwhelmed some districts; data entry backlogs resulted • Some of the districts Incident Commanders have a lack of respect for the process and potential • Districts did not make consistent use of technologies. 4. CL&P has a good plan for updating restoration status, but did not perform well. There were breakdowns in this process, as CL&P had problems in both storms with situational awareness. CL&P was late in getting all patrolling complete, finishing eight days after impact in Irene, and nine days after impact in the October snowstorm. This delay affected the accuracy of restoration projections, which was a significant issue in both storms. Another issue was the communication from the field to the command center as jobs were completed. The process was April 16, 2012 The Liberty Consulting Group page 89
  7. Page 93 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 93 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 labor-intensive; there were no mobile data terminals in the field vehicles, and information had to be entered manually. This also caused a delay in updating restoration status, d. Recommendations IX-CL&P-1 Develop a process to use damage assessment information in a statistical manner for overall crew resource-requirement projections. CL&P did not collect and use the wealth of data available on the system level. It is an industry best practice to use statistical damage assessment data to predict accurately overall resource requirements and associated system restoration timelines. The implementation of this recommendation may involve revising the reporting relationships. At the district level the patrolling function reports through the Planning Chief involved in restoration planning. At the division level, the organizational plan does not make the location of the patrol reporting relationship clear. At the area (CL&P) level, the patrolling function reports through the Logistics Chief rather than the Area Planning Chief. At this system level, CL&P views damage assessment as another resource to be provided to the field rather than as a critical process involved with overall system restoration planning. IX-CL&P-2 Improve the damage assessment processes at the district level. The processes at the district level are inconsistent. The districts reported numerous problems. A central process owner and a process management plan would improve district level consistency. CL&P has initiated some changes in the processes. 124 These changes listed below have a different process owner for each one, which reflects the fragmented nature of the damage assessment process ownership at CL&P. • Revise the patroller job description to require technical and or distribution system experience and modify the training program to include a certification to help ensure distribution system technical expertise, e.g., distribution circuit maps. • Based on revised patroller job description, evaluate the number of resources available in the state and develop a strategy to meet operating requirements. • Develop a proposal to implement the pilot program that enables corporate patrollers to use EDS in the field with the use of laptops and air cards. IX-CL&P-3 Reinforce aggressively the need for accurate, timely damage and restoration updates from the field. The CL&P plan is good, but the execution was not. Storm leaders should set targets for completion of damage assessment patrols. The section chiefs charged with the responsibility for the collection and analysis of status update data should exercise stronger leadership to ensure prompt and accurate information from the field. 124 Audit Request AG-38 April 16, 2012 The Liberty Consulting Group page 90
  8. Page 94 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 94 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 2. UI a. Emergency Plan Directives The 2006 UI EPP assigns the responsibility for restoration status updates to the Classification Center Supervisor and Classification Center Coordinator.125 UI’s damage assessment guidelines are in Chapter 5 of their 2006 EPP. Liberty used these guidelines to evaluate the damage assessment performance in the 2011 storms. UI filed a revised damage assessment plan on December 1, 2011. The damage assessment guidelines in the revised plan are essentially the same. The EPP contains several process diagrams that describe and clarify the damage assessment process. It also contains detailed job descriptions and training information for Circuit Patrol Supervisors, patrollers, clerks, and drivers. Staffing resources and scope for performing damage assessment vary depending on the type of storm that UI predicts. The Incident Commander will notify the Personnel Coordinator of what resources to procure for the level and type of event expected. Once UI enters outages in the Outage Management System (OMS), the system predicts the devices that would operate based on the customer call information or Supervisory Control and Data Acquisition (SCADA) system. UI assigns Damage Assessors circuits to patrol based on this information starting with the mainline. The Assessors report their findings to the Damage Assessor Supervisors who enter the details of the outages into OMS. The damage assessment information is prioritized prior to release to construction crews with municipal priorities first and then largest outages. After UI identifies the mainline issues, the Damage Assessors investigate side tap outages on the affected circuits and report their findings. The Damage Assessors then begin their post-storm inspections on the least affected circuits, followed by the circuits that sustained the most significant damage. During these inspections, the Damage Assessors look for any potential hazards or threats to the electric system infrastructure that may cause a future outage. UI collects this information in post-event work packets that it hands to construction resources for permanent repair. b. 2011 Storm Performance Findings UI implemented the damage assessment process in both storms. In the Irene storm (the most extreme storm for UI in 2011), UI deployed 70 two-person patrol teams. 126 The team breakdowns were: • 24 UI teams on the day shift • 21 UI teams on the night shift 125 126 UI EPP, Chapter 5, Part III, pages 83 – 86 Audit Request AG-168 April 16, 2012 The Liberty Consulting Group page 91
  9. Page 95 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 95 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • 25 Osmose contractors on the day shift. UI has 443 circuits (6.3 circuits per team deployed) and 263 of these circuits sustained damage. Liberty found that the amount of patroller resources UI deployed was adequate.127 The Damage Assessment Team Lead managed the overall damage assessment process. They had two Damage Assessment Coordinators that were direct reports. Damage assessment was a 24hour operation using a day shift and a night shift. The Damage Assessment Coordinators directly managed the teams. They gave the teams their patrolling assignments (circuit maps) for the shift, and the teams gathered notes on maps and forms. UI then gave the notes along with the maps to other storm personnel called Classifiers who entered the data and printed packets for the work crews. UI entered all data manually. UI patrolled mainlines first, and then patrolled side taps. After completion of the formal patrolling, some of the assessors worked with outside crews. They led the crews to the work and made sure of a clean sweep of all outages on the circuits they worked. After the storm, the assessors performed a post-assessment sweep of each circuit to locate items needing repair that did not cause any outages. UI used two-person teams with drivers from Meter Services and assessors who were field technicians, customer engineers, or other experienced employees. UI did not use retirees. There were both internal UI teams and contractor (Osmose) teams in place. An Osmose foreman directed the contractor teams and reported to the UI Damage Assessment Coordinators. The Osmose teams were familiar with the system. UI teams patrolled both day and night shifts. Osmose teams did not patrol at night due to a lack of proper lights and equipment. UI used the Automatic Metering System (AMR) to check on individual customers. The AMR meters did not have active power-off or power-on call-in capability. Rather, UI pinged each meter to determine the power status. During the 2011 storms, the Damage Assessors completed the backbone circuit patrols within two days.128 UI did not total the damage found (poles, crossarms, etc.) for use in estimating system-wide resource requirements. With regard to restoration status performance, UI said it followed an “interim plan.” It is not clear if there were any changes to the restoration status task at the time of these two storms. UI did report that job completion information from the field came back “in batches” as opposed to real-time reports from the field. The UI process for receiving this information and updating the outage management system was labor-intensive and cumbersome. Delays resulted in updating restoration status.129 127 While this number is double the CL&P per circuit numbers, the miles per circuit average less than half of the CL&P circuit miles. 128 Ibid 129 UI response to Liberty audit request #13 April 16, 2012 The Liberty Consulting Group page 92
  10. Page 96 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 96 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 c. 1. Conclusions UI had in place a centralized, structured damage assessment process. UI’s plan contained good documentation with several process charts, detailed position descriptions, and checklists. A Damage Assessment Team Lead managed the overall damage assessment process. 2. UI did not use the damage assessment data on a system-wide basis to estimate resource requirements. The current process does not collect or use this data. For the 2011 storms, there was not any process in place for totaling up of the damage found (poles, crossarms, etc.) for use in estimating resource needs. It is an industry best practice to use statistical damage assessment data to predict accurately overall resource requirements and associated system restoration timelines. 3. UI did not have a clear plan in place for restoration status updates, and performance in this area was not adequate. UI followed an “interim plan” during these two storms. Job completion information from the field came back “in batches,” and the UI process for receiving this information and updating the outage management system was labor-intensive and cumbersome. Delays resulted in updating restoration status. d. IX-UI-1 Recommendations Develop a process to use damage assessment information in a statistical manner for overall crew resource-requirement projections. A new function listed in UI’s revised 2011 plan is the Planning Analyst function. The Planning Analyst assists with storm restoration planning by using the damage assessment data and producing a resource requirements plan. This new function should improve data analysis in the damage assessment process. IX-UI-2 Verify that the 2011 EPP adequately covers restoration status updates, and address the issues identified during the two storms. UI should provide field crews with mobile data terminals and improve the process to increase the frequency of field feedback. April 16, 2012 The Liberty Consulting Group page 93

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)