Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 95 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 95 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • 25 Osmose contractors on the day shift. UI has 443 circuits (6.3 circuits per team deployed) and 263 of these circuits sustained damage. Liberty found that the amount of patroller resources UI deployed was adequate.127 The Damage Assessment Team Lead managed the overall damage assessment process. They had two Damage Assessment Coordinators that were direct reports. Damage assessment was a 24hour operation using a day shift and a night shift. The Damage Assessment Coordinators directly managed the teams. They gave the teams their patrolling assignments (circuit maps) for the shift, and the teams gathered notes on maps and forms. UI then gave the notes along with the maps to other storm personnel called Classifiers who entered the data and printed packets for the work crews. UI entered all data manually. UI patrolled mainlines first, and then patrolled side taps. After completion of the formal patrolling, some of the assessors worked with outside crews. They led the crews to the work and made sure of a clean sweep of all outages on the circuits they worked. After the storm, the assessors performed a post-assessment sweep of each circuit to locate items needing repair that did not cause any outages. UI used two-person teams with drivers from Meter Services and assessors who were field technicians, customer engineers, or other experienced employees. UI did not use retirees. There were both internal UI teams and contractor (Osmose) teams in place. An Osmose foreman directed the contractor teams and reported to the UI Damage Assessment Coordinators. The Osmose teams were familiar with the system. UI teams patrolled both day and night shifts. Osmose teams did not patrol at night due to a lack of proper lights and equipment. UI used the Automatic Metering System (AMR) to check on individual customers. The AMR meters did not have active power-off or power-on call-in capability. Rather, UI pinged each meter to determine the power status. During the 2011 storms, the Damage Assessors completed the backbone circuit patrols within two days.128 UI did not total the damage found (poles, crossarms, etc.) for use in estimating system-wide resource requirements. With regard to restoration status performance, UI said it followed an “interim plan.” It is not clear if there were any changes to the restoration status task at the time of these two storms. UI did report that job completion information from the field came back “in batches” as opposed to real-time reports from the field. The UI process for receiving this information and updating the outage management system was labor-intensive and cumbersome. Delays resulted in updating restoration status.129 127 While this number is double the CL&P per circuit numbers, the miles per circuit average less than half of the CL&P circuit miles. 128 Ibid 129 UI response to Liberty audit request #13 April 16, 2012 The Liberty Consulting Group page 92
  2. Page 96 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 96 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 c. 1. Conclusions UI had in place a centralized, structured damage assessment process. UI’s plan contained good documentation with several process charts, detailed position descriptions, and checklists. A Damage Assessment Team Lead managed the overall damage assessment process. 2. UI did not use the damage assessment data on a system-wide basis to estimate resource requirements. The current process does not collect or use this data. For the 2011 storms, there was not any process in place for totaling up of the damage found (poles, crossarms, etc.) for use in estimating resource needs. It is an industry best practice to use statistical damage assessment data to predict accurately overall resource requirements and associated system restoration timelines. 3. UI did not have a clear plan in place for restoration status updates, and performance in this area was not adequate. UI followed an “interim plan” during these two storms. Job completion information from the field came back “in batches,” and the UI process for receiving this information and updating the outage management system was labor-intensive and cumbersome. Delays resulted in updating restoration status. d. IX-UI-1 Recommendations Develop a process to use damage assessment information in a statistical manner for overall crew resource-requirement projections. A new function listed in UI’s revised 2011 plan is the Planning Analyst function. The Planning Analyst assists with storm restoration planning by using the damage assessment data and producing a resource requirements plan. This new function should improve data analysis in the damage assessment process. IX-UI-2 Verify that the 2011 EPP adequately covers restoration status updates, and address the issues identified during the two storms. UI should provide field crews with mobile data terminals and improve the process to increase the frequency of field feedback. April 16, 2012 The Liberty Consulting Group page 93
  3. Page 97 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 97 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 X. Communications and Outage Information Storms present unique challenges for utility customer service. Many customers can simultaneously lose power, causing a flood of calls to the utility. The bigger the storm in terms of customers affected, the higher the number of customers trying to contact the company. Solutions have evolved over the years, with the development of various technologies and service providers, to help utilities better respond to a sudden, extreme, and often extended peak in call volume associated with a storm or outage. Most utilities have embraced the use of Interactive Voice Response (IVR) technology to offer self-service outage reporting and status updates via telephone. However, the number of calls can exceed in-house capacity quickly during a large outage. After-hours outages can be especially challenging as more customers are at home and fewer agents are on-hand to answer calls. Generally, it is cost prohibitive to configure an inhouse IVR system large enough to handle the largest spike in call volume. Attempting to staff a call center, or to outsource to a center large enough to handle these calls, also is cost prohibitive. A more economical approach is to outsource or offload overflow to a third party IVR when call volumes threaten to exceed capacity—effectively renting capacity as needed. Most large electric utilities in the United States have adopted this approach, contracting with a high volume outage handling IVR service to handle overflow. To be adequately prepared for the high volume of calls into a call center during a large outage, utilities should also have adequate supply of experienced agents on hand to respond. To assist with the need to ramp up staffing beyond normal staffing levels, customer service organizations should have a call-center resource plan that it activates during major storms or large outage events. Integrated with this plan should be a staffing model that will provide guidelines for adding resources, based on the predicted severity of the event, projected call volumes, the timing, and expected duration. In certain situations, when weather makes travel difficult, a pre-storm staging strategy for call center agents becomes prudent. Typically the pre-storm planning processes request customer service representatives (CSRs) and other contact center personnel to come to the centers prepared to spend several days away from home, if necessary, and arrange for cots or rooms in a nearby hotel, along with meals and other logistics. In addition to responding to customer inquiries and outage notification calls, utilities must be prepared to communicate storm restoration status to the general public as well as local and state officials and community leaders. One of the most vital functions of a utility’s corporate communications department during a major storm is to make sure that all employees present the same information about storm restoration to their contacts outside the company. In addition, it must effectively disseminate storm restoration status information to stakeholders—state and local government officials, large industrial customers, the media, employees, and customers. The goal is to deliver the same message to the press, mayors, legislators, city officials, and the next customer calling into the call center. To manage and disseminate information effectively, corporate communications must work closely with the Emergency Operations Center (EOC) to gather information on storm restoration progress, the number of customers out of power, and projected restoration times. Ultimately, the outage management system is the repository and source for this information. It effectively links April 16, 2012 The Liberty Consulting Group page 94
  4. Page 98 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 98 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 the field with other areas of the company to manage the restoration effort and communicate progress. An effective strategy is to time storm restoration progress-reports for release around the local news media cycles, early morning, noon, 5 p.m., and 10 p.m., so the media can feature the reports on local radio and television newscasts. Equally important is the need to coordinate with operations prior to each release so the numbers are fresh and accurate. Concurrently, call center representatives and other key employees working with community and public officials, key accounts, and state emergency agencies can receive this same message. More recently, social media has provided additional communications channels for companies and customers. Utility corporate communications must now be prepared to effectively leverage these new channels during storms and large outages. Community Relations is another key utility function during a major storm, specifically charged with keeping state and local officials informed. This role usually falls to community relations officials, quite often filled by district or division management. No one knows their communities better than the people who work in them day-in and day-out. Before a storm even starts, community relations personnel begin contacting elected officials, community leaders, and key customers to start the flow of communication. During the storm, the community relations can assist local emergency and other governmental agencies by providing critical infrastructure information, offering restoration progress updates, and redirecting resources to address emergency issues and community priorities. On an ongoing basis, it is important to play an educational role in communities regarding storm restoration. An excellent way to involve the community and open the lines of communication between local officials and the company is to host community workshops promoting storm response awareness. These forums also provide an opportunity for the utility to gather feedback and learn expectations. To be effective at community relations, utilities need to emphasize training for community relations representatives and other employees actively interfacing with the community and public. Training should familiarize employees with sources of outage information and with how best to interact with the public, governmental officials, and community leaders. This section of the report provides a description and evaluation of CL&P’s and UI’s event communications and performance of its call centers. Liberty’s focus was on the performance of these systems and processes during the 2011 storms. However, Liberty also examined the modifications or enhancements made since the storms. Liberty’s objectives were to: • • • Examine whether CL&P and UI demonstrated the ability to communicate effectively with customers and other stakeholders. This includes examining call center staffing and determining whether the performance of these centers was effective and efficient. Determine whether customers could reach the utility during the storms to report outages. Determine whether CL&P and UI kept key stakeholders informed during the storms. April 16, 2012 The Liberty Consulting Group page 95
  5. Page 99 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 99 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • • • Determine whether CL&P and UI communicated effectively with the public with regard to matters that may have contributed to the length of restoration times or that dealt with public safety. Determine how CL&P and UI employed industry best practices. Identify any areas that might be suitable for adoption of industry best practices. Liberty explored each of these objectives with representatives from both utilities. The results of this assessment are presented on the following pages. Each utility is discussed separately in sections that present background, findings, conclusions, and recommendations. A. CL&P 1. Customer Contact Center Operations CL&P’s contact center operations report to the vice president of Customer Experience and Chief Customer Officer, who reports directly to the president and chief executive officer of CL&P. Northeast Utilities (NU) created the Customer Experience organization in 2008 when it moved customer service functions from the operating companies to the NU Service Company. NU intended this change to increase the focus of the organization on better serving the needs of customers and various other stakeholders. NU’s Customer Experience organization strives to deliver a consistently compelling customer experience to customers located across three states, operating under three different regulatory environments. In late 2008, NU completed a project that resulted in the consolidation of six customer contact centers to two centers located in Windsor, Connecticut, and Manchester, New Hampshire, both supported by a new customer information system (C2). Operated in a virtual mode during major storms, this configuration enables the company to support customer outage reporting and inquiries from any of its territories through either or both centers.130 Customers calling CL&P are routed to the Windsor Customer Experience (CE) Center. When call volume exceeds Windsor CE Center capacity, calls are automatically routed to the Manchester CE Center. The Windsor CE Center operates off an Aspect Spectrum Automatic Call Distributor (ACD). As depicted in the following chart, the Windsor CE Center is supported by 20 dedicated inbound T1 private line services131 (473 ports) and 8 dedicated T-1 private line services feeding an Aspect IVR (192 ports). A similar but slightly smaller configuration is in place for the Manchester CE Center. Outbound calls are initiated from an Aspect outbound calling system located in the Windsor Data Center using eight separate outbound T-1 private lines services.132 130 Response to Witt-043. T-1 is a communications scheme of certain capacity and speed. 132 Response to Liberty 055 Attachment A. 131 April 16, 2012 The Liberty Consulting Group page 96
  6. Page 100 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 100 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 NU contracts with Twenty First Century Communications (TFCC) to accept incoming calls in the event NU’s internal phone infrastructure becomes overloaded. NU can manually overflow calls to TFCC’s IVRs during high volume periods. TFCC provides scripting and messaging similar to NU’s to help customers, whose phone number the system can identify and match, report a power outage and receive estimated restoration times (ERT). Any callers that cannot be identified by TFCC are provided an option to leave a message. TFCC routes these “exception” messages back to NU for resolution, including emergency calls.133 NU activated TFCC services for both storm Irene and the October snowstorm. CL&P can monitor its 800-network traffic to verify that calls are terminating successfully in its CE Centers using AT&T’s Business Direct services. CE staffs its contact centers to handle calls from 7:00 am to 7:00 pm Monday through Friday and from 7:00 am to 4:00 pm on Saturday. During these business hours, call center representatives handle customer calls relating to service, billing and collections, and calls to report power interruptions. Upon calling CL&P’s toll-free number customers enter the Automatic Call Distributor (ACD) and hear a company greeting and outage messaging (if activated). Calls then proceed to the IVR for call classification and self-service. Callers can request to speak with an agent and the system transfers them to an agent queue. Emergency calls (reporting gas odor or downed wires) received at any time of the day are immediately queued to an agent group. Otherwise, all other call types will request authentication to provide self-service options or additional account information. At any point in the call flow, in the IVR or the ACD, customers can abandon their call. CL&P also maintains a toll-free emergency number and 19 local emergency phone numbers that are distributed to fire, police, and emergency personnel across Connecticut. These calls are moved to the top of the call queue for priority handling in the contact centers. In addition, there 133 Response to Liberty-100. April 16, 2012 The Liberty Consulting Group page 97
  7. Page 101 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 101 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 is another dedicated line for emergency 911 calls for use by qualified emergency response dispatchers. This line rings directly in the Systems Operations Center (SOC).134 Management forecasts staffing levels to fit projected workload derived from historical call volumes, known events, and seasonal variations. On a day-to-day basis, the Windsor CE Center establishes service level goals to answer 80 percent of all calls within 30 seconds, with an average speed of answer of 60 seconds of less. CL&P’s service level goals are consistent with other utilities. Based on these service levels, management determines the number of employees required to handle projected call volumes. This is a common call center staffing approach used by other utilities and other industries. On the basis of seat capacity, average call handle time, service level goals, and agent availability, NU can handle approximately 2,000 to 3,000 calls per hour at maximum staffing (during normal business hours) and up to 15,000 per hour using IVR self-service.135 NU has adequately sized the total contact center capacity to handle day-to-day call volumes. Storm Irene Response CE has formal Emergency Operations Procedures (Storm Plan) for both contact center locations.136 It formalized these plans for both centers in 2011 and tested with smaller storms prior to storm Irene. CE’s Storm Plan includes pre-storm planning checklists as well as detailed descriptions of roles and responsibilities to guide personnel during large power outages or other emergencies. The plan also designates a Customer Experience Emergency organization and details levels of supervision, lines of authority, and channels of communication. Typically, CE’s Emergency Operating Plans are activated when the Emergency Operations Center (EOC) is activated for one of the Operating Companies. CE can also activate emergency plans sooner if call volume and other factors dictate the need for additional phone center support above and beyond normal staffing. Guided by the Storm Plan’s pre-storm checklist, CE’s Storm Team undertook numerous measures in preparation during the week leading up to projected landfall:137 • Daily pre-storm conference calls within CE • Formal monitoring of the weather • All telephony systems and overflow options were tested • CE Emergency Operations Plan was activated to assign alternate storm duties and establish the Escalated Response Team • Two days prior to the storm, CL&P initiated 1.1 million automated outbound calls to inform customers of storm preparations, provide important safety reminders, and offer guidance for customers with medical conditions. • Prepare to close for regular business on Monday, August 29, 2011 • Participated in daily CL&P Operations Preparations & Communication conference calls 134 Response to Liberty-035. Liberty Interview #49. 136 Response to Witt-046 137 Response to CSU-001. 135 April 16, 2012 The Liberty Consulting Group page 98
  8. Page 102 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 102 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • • • Drafted outbound messaging in anticipation of major event Removed global restoration message from IVR Notified employees of 12-hour storm staffing schedules ahead of the storm. CL&P, Yankee Gas, and WMECO were closed for normal business starting on Sunday, August 28, 2011, as NU focused on storm damage assessment and restoration efforts. This included closing the walk-in centers in Berlin and Hartford, suspending service disconnects, and instructing CSRs to only handle emergency calls. Normal business operations were suspended through noon on Thursday, September 1. CL&P returned to full operations on Tuesday, September 6. Unlike other weather events, storm Irene affected each of NU’s service territories. Resources were required to support outage calls from all three states. During a storm, NUSCO’s two CE Contact Centers act as a single, virtual center, with calls answered by the next available representative. Staffing was also supplemented in the Windsor center through additional resources from the billing and collections departments. CL&P scheduled CE employees to work extended 12-hour shifts, beginning on Sunday, August 28, 2011, to provide 24-hour coverage during the storm. In the first 24 hours of the storm, the contact centers handled approximately 476,000 calls. Outages peaked on August 28, 2011, at 9:00 pm with 671,000 customers without service. NU handled more than 1 million calls throughout the duration of the storm, more than 70 percent of which were self-served.138 138 Response to AG-03 and CSU-002. April 16, 2012 The Liberty Consulting Group page 99
  9. Page 103 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 103 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The following chart details the peak staffing for each day of storm Irene. CE was able to secure considerable staffing to handle incoming calls. CL&P’s staffing levels peaked on the 4th day of the storm, a Tuesday.139 Throughout the storm, CE continued to monitor weather on an hourly basis. CE conducted twicedaily conference calls to review staffing, crew welfare, technology, restoration priorities, and deliver status from other CE Emergency Operations teams. Upfront messaging for inbound customer calls was also reviewed and updated twice a day. Training tips and reminders on various relevant topics were distributed as refreshers to all CE employees throughout the storm. Early in the storm, CE manually cutover to Twenty First Century Communications high-volume overflow IVRs. CE created the Exceptions Group to address any calls that could not be handled automatically by Twenty First Century Communications’ IVR (TFCC), CL&P’s high-volume overflow vendor. During a large storm, such as Irene, call volumes can quickly exceed CL&P capacity. At this point, outage calls will be forwarded to TFCC for automated handling. If TFCC can find the incoming phone number in its database, an outage ticket is automatically created and forwarded to CL&P’s outage management system. If TFCC cannot match the phone number it is recorded on an exceptions log that is forwarded every 30 minutes to CL&P for manual processing. Each exception represents a reported outage in which TFCC was unable to associate an account with the phone number. As a result, CL&P must contact the phone number associated with each exception to identify the correct CL&P account and then manually enter an outage in the outage management system. This can be a lengthy process. CE staffed the Exceptions group with 14 individuals from the C2 Systems Support group. During Irene, CL&P received 14,830 exceptions from TFCC, of which 1,270 were identified as an emergency such as wires down or tree on wire. At times, CE assigned as many as 30 people in 139 Response to CSU-002. April 16, 2012 The Liberty Consulting Group page 100
  10. Page 104 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 104 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 12-hour shifts to work the exceptions queue until it completed all exceptions, representing a significant manual effort. It worked all exceptions within 2.5 days.140 However, had CL&P designed a different call flow for TFCC, exceptions could have been routed in real-time back to live agents for immediate handling, thereby eliminating the exceptions backlog and subsequent extensive manual effort to record outages. Of real concern though are the 1,270 emergency calls that could not be matched in real-time. Even though it gave these calls top priority for follow-up by the exceptions team, they did not handle these calls in real time. During a storm, emergency calls should be routed back immediately to CL&P’s contact center for prompt handling. CE also established director-level presence in the Emergency Operations Center (EOC). CE’s Director of Customer Experience Support was assigned to represent CE in the EOC. This position participated in conference calls, worked with Corporate Communications team members on customer messaging and outbound campaigns, and helped communicate restoration status information back to CE Communications Leads to package for contact center representatives (talking points). CE also conducted several special outreach efforts during the storm including:141 • Medical hardship customers without power were contacted and provided a referral to Red Cross for assistance (pre-recorded calling campaign) • Nursing homes were contacted regarding restoration efforts (live calling campaign) • Outreach to towns in eastern Connecticut to confirm power restoration (pre-recorded calling campaign) • Sent close to 500,000 outage updates via text messaging to CL&P customer mobile phones. A group of employees, primarily in-house attorneys, staffed the Escalated Response Team to deal with difficult calls, complaints, issues needing special attention, and customers asking to speak with supervisors or company executives. This process worked very well during storm Irene and continued in the October snowstorm. In retrospect, CE’s contact centers performed well throughout the storm and very few contact center issues were encountered: • This was the first time CE used TFCC’s overflow services. As a result, CE had no clear-cut rules or thresholds for when to start and stop TFCC overflow services, aside from all trunks busy. As a result, some customers experienced busy signals during a brief period of time at the onset of the storm. Customers had approximately 4,500 calls blocked on August 28, from 7:00 am to noon. 142 In hindsight, CE could have cutover to TFCC sooner and further minimized busy signals. 140 Response to Liberty-100. Response to CSU-001. 142 Response to CSU-002. 141 April 16, 2012 The Liberty Consulting Group page 101

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)