Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

5 pages match
  1. Page 97 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 97 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 X. Communications and Outage Information Storms present unique challenges for utility customer service. Many customers can simultaneously lose power, causing a flood of calls to the utility. The bigger the storm in terms of customers affected, the higher the number of customers trying to contact the company. Solutions have evolved over the years, with the development of various technologies and service providers, to help utilities better respond to a sudden, extreme, and often extended peak in call volume associated with a storm or outage. Most utilities have embraced the use of Interactive Voice Response (IVR) technology to offer self-service outage reporting and status updates via telephone. However, the number of calls can exceed in-house capacity quickly during a large outage. After-hours outages can be especially challenging as more customers are at home and fewer agents are on-hand to answer calls. Generally, it is cost prohibitive to configure an inhouse IVR system large enough to handle the largest spike in call volume. Attempting to staff a call center, or to outsource to a center large enough to handle these calls, also is cost prohibitive. A more economical approach is to outsource or offload overflow to a third party IVR when call volumes threaten to exceed capacity—effectively renting capacity as needed. Most large electric utilities in the United States have adopted this approach, contracting with a high volume outage handling IVR service to handle overflow. To be adequately prepared for the high volume of calls into a call center during a large outage, utilities should also have adequate supply of experienced agents on hand to respond. To assist with the need to ramp up staffing beyond normal staffing levels, customer service organizations should have a call-center resource plan that it activates during major storms or large outage events. Integrated with this plan should be a staffing model that will provide guidelines for adding resources, based on the predicted severity of the event, projected call volumes, the timing, and expected duration. In certain situations, when weather makes travel difficult, a pre-storm staging strategy for call center agents becomes prudent. Typically the pre-storm planning processes request customer service representatives (CSRs) and other contact center personnel to come to the centers prepared to spend several days away from home, if necessary, and arrange for cots or rooms in a nearby hotel, along with meals and other logistics. In addition to responding to customer inquiries and outage notification calls, utilities must be prepared to communicate storm restoration status to the general public as well as local and state officials and community leaders. One of the most vital functions of a utility’s corporate communications department during a major storm is to make sure that all employees present the same information about storm restoration to their contacts outside the company. In addition, it must effectively disseminate storm restoration status information to stakeholders—state and local government officials, large industrial customers, the media, employees, and customers. The goal is to deliver the same message to the press, mayors, legislators, city officials, and the next customer calling into the call center. To manage and disseminate information effectively, corporate communications must work closely with the Emergency Operations Center (EOC) to gather information on storm restoration progress, the number of customers out of power, and projected restoration times. Ultimately, the outage management system is the repository and source for this information. It effectively links April 16, 2012 The Liberty Consulting Group page 94
  2. Page 98 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 98 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 the field with other areas of the company to manage the restoration effort and communicate progress. An effective strategy is to time storm restoration progress-reports for release around the local news media cycles, early morning, noon, 5 p.m., and 10 p.m., so the media can feature the reports on local radio and television newscasts. Equally important is the need to coordinate with operations prior to each release so the numbers are fresh and accurate. Concurrently, call center representatives and other key employees working with community and public officials, key accounts, and state emergency agencies can receive this same message. More recently, social media has provided additional communications channels for companies and customers. Utility corporate communications must now be prepared to effectively leverage these new channels during storms and large outages. Community Relations is another key utility function during a major storm, specifically charged with keeping state and local officials informed. This role usually falls to community relations officials, quite often filled by district or division management. No one knows their communities better than the people who work in them day-in and day-out. Before a storm even starts, community relations personnel begin contacting elected officials, community leaders, and key customers to start the flow of communication. During the storm, the community relations can assist local emergency and other governmental agencies by providing critical infrastructure information, offering restoration progress updates, and redirecting resources to address emergency issues and community priorities. On an ongoing basis, it is important to play an educational role in communities regarding storm restoration. An excellent way to involve the community and open the lines of communication between local officials and the company is to host community workshops promoting storm response awareness. These forums also provide an opportunity for the utility to gather feedback and learn expectations. To be effective at community relations, utilities need to emphasize training for community relations representatives and other employees actively interfacing with the community and public. Training should familiarize employees with sources of outage information and with how best to interact with the public, governmental officials, and community leaders. This section of the report provides a description and evaluation of CL&P’s and UI’s event communications and performance of its call centers. Liberty’s focus was on the performance of these systems and processes during the 2011 storms. However, Liberty also examined the modifications or enhancements made since the storms. Liberty’s objectives were to: • • • Examine whether CL&P and UI demonstrated the ability to communicate effectively with customers and other stakeholders. This includes examining call center staffing and determining whether the performance of these centers was effective and efficient. Determine whether customers could reach the utility during the storms to report outages. Determine whether CL&P and UI kept key stakeholders informed during the storms. April 16, 2012 The Liberty Consulting Group page 95
  3. Page 99 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 99 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • • • Determine whether CL&P and UI communicated effectively with the public with regard to matters that may have contributed to the length of restoration times or that dealt with public safety. Determine how CL&P and UI employed industry best practices. Identify any areas that might be suitable for adoption of industry best practices. Liberty explored each of these objectives with representatives from both utilities. The results of this assessment are presented on the following pages. Each utility is discussed separately in sections that present background, findings, conclusions, and recommendations. A. CL&P 1. Customer Contact Center Operations CL&P’s contact center operations report to the vice president of Customer Experience and Chief Customer Officer, who reports directly to the president and chief executive officer of CL&P. Northeast Utilities (NU) created the Customer Experience organization in 2008 when it moved customer service functions from the operating companies to the NU Service Company. NU intended this change to increase the focus of the organization on better serving the needs of customers and various other stakeholders. NU’s Customer Experience organization strives to deliver a consistently compelling customer experience to customers located across three states, operating under three different regulatory environments. In late 2008, NU completed a project that resulted in the consolidation of six customer contact centers to two centers located in Windsor, Connecticut, and Manchester, New Hampshire, both supported by a new customer information system (C2). Operated in a virtual mode during major storms, this configuration enables the company to support customer outage reporting and inquiries from any of its territories through either or both centers.130 Customers calling CL&P are routed to the Windsor Customer Experience (CE) Center. When call volume exceeds Windsor CE Center capacity, calls are automatically routed to the Manchester CE Center. The Windsor CE Center operates off an Aspect Spectrum Automatic Call Distributor (ACD). As depicted in the following chart, the Windsor CE Center is supported by 20 dedicated inbound T1 private line services131 (473 ports) and 8 dedicated T-1 private line services feeding an Aspect IVR (192 ports). A similar but slightly smaller configuration is in place for the Manchester CE Center. Outbound calls are initiated from an Aspect outbound calling system located in the Windsor Data Center using eight separate outbound T-1 private lines services.132 130 Response to Witt-043. T-1 is a communications scheme of certain capacity and speed. 132 Response to Liberty 055 Attachment A. 131 April 16, 2012 The Liberty Consulting Group page 96
  4. Page 100 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 100 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 NU contracts with Twenty First Century Communications (TFCC) to accept incoming calls in the event NU’s internal phone infrastructure becomes overloaded. NU can manually overflow calls to TFCC’s IVRs during high volume periods. TFCC provides scripting and messaging similar to NU’s to help customers, whose phone number the system can identify and match, report a power outage and receive estimated restoration times (ERT). Any callers that cannot be identified by TFCC are provided an option to leave a message. TFCC routes these “exception” messages back to NU for resolution, including emergency calls.133 NU activated TFCC services for both storm Irene and the October snowstorm. CL&P can monitor its 800-network traffic to verify that calls are terminating successfully in its CE Centers using AT&T’s Business Direct services. CE staffs its contact centers to handle calls from 7:00 am to 7:00 pm Monday through Friday and from 7:00 am to 4:00 pm on Saturday. During these business hours, call center representatives handle customer calls relating to service, billing and collections, and calls to report power interruptions. Upon calling CL&P’s toll-free number customers enter the Automatic Call Distributor (ACD) and hear a company greeting and outage messaging (if activated). Calls then proceed to the IVR for call classification and self-service. Callers can request to speak with an agent and the system transfers them to an agent queue. Emergency calls (reporting gas odor or downed wires) received at any time of the day are immediately queued to an agent group. Otherwise, all other call types will request authentication to provide self-service options or additional account information. At any point in the call flow, in the IVR or the ACD, customers can abandon their call. CL&P also maintains a toll-free emergency number and 19 local emergency phone numbers that are distributed to fire, police, and emergency personnel across Connecticut. These calls are moved to the top of the call queue for priority handling in the contact centers. In addition, there 133 Response to Liberty-100. April 16, 2012 The Liberty Consulting Group page 97
  5. Page 101 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 101 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 is another dedicated line for emergency 911 calls for use by qualified emergency response dispatchers. This line rings directly in the Systems Operations Center (SOC).134 Management forecasts staffing levels to fit projected workload derived from historical call volumes, known events, and seasonal variations. On a day-to-day basis, the Windsor CE Center establishes service level goals to answer 80 percent of all calls within 30 seconds, with an average speed of answer of 60 seconds of less. CL&P’s service level goals are consistent with other utilities. Based on these service levels, management determines the number of employees required to handle projected call volumes. This is a common call center staffing approach used by other utilities and other industries. On the basis of seat capacity, average call handle time, service level goals, and agent availability, NU can handle approximately 2,000 to 3,000 calls per hour at maximum staffing (during normal business hours) and up to 15,000 per hour using IVR self-service.135 NU has adequately sized the total contact center capacity to handle day-to-day call volumes. Storm Irene Response CE has formal Emergency Operations Procedures (Storm Plan) for both contact center locations.136 It formalized these plans for both centers in 2011 and tested with smaller storms prior to storm Irene. CE’s Storm Plan includes pre-storm planning checklists as well as detailed descriptions of roles and responsibilities to guide personnel during large power outages or other emergencies. The plan also designates a Customer Experience Emergency organization and details levels of supervision, lines of authority, and channels of communication. Typically, CE’s Emergency Operating Plans are activated when the Emergency Operations Center (EOC) is activated for one of the Operating Companies. CE can also activate emergency plans sooner if call volume and other factors dictate the need for additional phone center support above and beyond normal staffing. Guided by the Storm Plan’s pre-storm checklist, CE’s Storm Team undertook numerous measures in preparation during the week leading up to projected landfall:137 • Daily pre-storm conference calls within CE • Formal monitoring of the weather • All telephony systems and overflow options were tested • CE Emergency Operations Plan was activated to assign alternate storm duties and establish the Escalated Response Team • Two days prior to the storm, CL&P initiated 1.1 million automated outbound calls to inform customers of storm preparations, provide important safety reminders, and offer guidance for customers with medical conditions. • Prepare to close for regular business on Monday, August 29, 2011 • Participated in daily CL&P Operations Preparations & Communication conference calls 134 Response to Liberty-035. Liberty Interview #49. 136 Response to Witt-046 137 Response to CSU-001. 135 April 16, 2012 The Liberty Consulting Group page 98
  6. Page 102 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 102 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • • • Drafted outbound messaging in anticipation of major event Removed global restoration message from IVR Notified employees of 12-hour storm staffing schedules ahead of the storm. CL&P, Yankee Gas, and WMECO were closed for normal business starting on Sunday, August 28, 2011, as NU focused on storm damage assessment and restoration efforts. This included closing the walk-in centers in Berlin and Hartford, suspending service disconnects, and instructing CSRs to only handle emergency calls. Normal business operations were suspended through noon on Thursday, September 1. CL&P returned to full operations on Tuesday, September 6. Unlike other weather events, storm Irene affected each of NU’s service territories. Resources were required to support outage calls from all three states. During a storm, NUSCO’s two CE Contact Centers act as a single, virtual center, with calls answered by the next available representative. Staffing was also supplemented in the Windsor center through additional resources from the billing and collections departments. CL&P scheduled CE employees to work extended 12-hour shifts, beginning on Sunday, August 28, 2011, to provide 24-hour coverage during the storm. In the first 24 hours of the storm, the contact centers handled approximately 476,000 calls. Outages peaked on August 28, 2011, at 9:00 pm with 671,000 customers without service. NU handled more than 1 million calls throughout the duration of the storm, more than 70 percent of which were self-served.138 138 Response to AG-03 and CSU-002. April 16, 2012 The Liberty Consulting Group page 99
  7. Page 103 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 103 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The following chart details the peak staffing for each day of storm Irene. CE was able to secure considerable staffing to handle incoming calls. CL&P’s staffing levels peaked on the 4th day of the storm, a Tuesday.139 Throughout the storm, CE continued to monitor weather on an hourly basis. CE conducted twicedaily conference calls to review staffing, crew welfare, technology, restoration priorities, and deliver status from other CE Emergency Operations teams. Upfront messaging for inbound customer calls was also reviewed and updated twice a day. Training tips and reminders on various relevant topics were distributed as refreshers to all CE employees throughout the storm. Early in the storm, CE manually cutover to Twenty First Century Communications high-volume overflow IVRs. CE created the Exceptions Group to address any calls that could not be handled automatically by Twenty First Century Communications’ IVR (TFCC), CL&P’s high-volume overflow vendor. During a large storm, such as Irene, call volumes can quickly exceed CL&P capacity. At this point, outage calls will be forwarded to TFCC for automated handling. If TFCC can find the incoming phone number in its database, an outage ticket is automatically created and forwarded to CL&P’s outage management system. If TFCC cannot match the phone number it is recorded on an exceptions log that is forwarded every 30 minutes to CL&P for manual processing. Each exception represents a reported outage in which TFCC was unable to associate an account with the phone number. As a result, CL&P must contact the phone number associated with each exception to identify the correct CL&P account and then manually enter an outage in the outage management system. This can be a lengthy process. CE staffed the Exceptions group with 14 individuals from the C2 Systems Support group. During Irene, CL&P received 14,830 exceptions from TFCC, of which 1,270 were identified as an emergency such as wires down or tree on wire. At times, CE assigned as many as 30 people in 139 Response to CSU-002. April 16, 2012 The Liberty Consulting Group page 100
  8. Page 104 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 104 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 12-hour shifts to work the exceptions queue until it completed all exceptions, representing a significant manual effort. It worked all exceptions within 2.5 days.140 However, had CL&P designed a different call flow for TFCC, exceptions could have been routed in real-time back to live agents for immediate handling, thereby eliminating the exceptions backlog and subsequent extensive manual effort to record outages. Of real concern though are the 1,270 emergency calls that could not be matched in real-time. Even though it gave these calls top priority for follow-up by the exceptions team, they did not handle these calls in real time. During a storm, emergency calls should be routed back immediately to CL&P’s contact center for prompt handling. CE also established director-level presence in the Emergency Operations Center (EOC). CE’s Director of Customer Experience Support was assigned to represent CE in the EOC. This position participated in conference calls, worked with Corporate Communications team members on customer messaging and outbound campaigns, and helped communicate restoration status information back to CE Communications Leads to package for contact center representatives (talking points). CE also conducted several special outreach efforts during the storm including:141 • Medical hardship customers without power were contacted and provided a referral to Red Cross for assistance (pre-recorded calling campaign) • Nursing homes were contacted regarding restoration efforts (live calling campaign) • Outreach to towns in eastern Connecticut to confirm power restoration (pre-recorded calling campaign) • Sent close to 500,000 outage updates via text messaging to CL&P customer mobile phones. A group of employees, primarily in-house attorneys, staffed the Escalated Response Team to deal with difficult calls, complaints, issues needing special attention, and customers asking to speak with supervisors or company executives. This process worked very well during storm Irene and continued in the October snowstorm. In retrospect, CE’s contact centers performed well throughout the storm and very few contact center issues were encountered: • This was the first time CE used TFCC’s overflow services. As a result, CE had no clear-cut rules or thresholds for when to start and stop TFCC overflow services, aside from all trunks busy. As a result, some customers experienced busy signals during a brief period of time at the onset of the storm. Customers had approximately 4,500 calls blocked on August 28, from 7:00 am to noon. 142 In hindsight, CE could have cutover to TFCC sooner and further minimized busy signals. 140 Response to Liberty-100. Response to CSU-001. 142 Response to CSU-002. 141 April 16, 2012 The Liberty Consulting Group page 101
  9. Page 105 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 105 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 • A couple of days into the storm CE realized that the upfront messaging on TFCC’s IVR was not the same as that of the internal IVR. As a result, CE was not seeing the benefit of that message (callers hanging up after they have heard the message). CE addressed this issue following the storm and made sure that messaging was consistent during future storms, including the October snowstorm. October Snowstorm Response Beginning as early as Friday, CE began to supplement staffing for the weekend. It added ten CSRs to the Saturday schedule (afternoon) and placed 15 more on paid standby (in each center). Other pre-storm preparations included:143 • Daily pre-storm conference calls within CE leadership • Formal monitoring of the weather • All telephony systems and overflow options were tested • IT was notified to prepare to overflow calls to Twenty First Century Communications • Prepared to close for regular business on Monday, October 31, 2011 • Participated in CL&P Operations Preparations & Communication conference calls • Drafted outbound messaging in anticipation of major event • Removed global restoration message from IVR CE held a Storm Call at 1:00 pm on Saturday to evaluate storm conditions and predictions. At this time, it activated the CE Storm Plan. CE also extended the schedules for CSRs already onsite, added 10 more CSRs at each center, and called in the 15 on standby. From Saturday on, CE scheduled its employees to work extended 12-hour shifts to provide 24-hour coverage during the storm. Unlike storm Irene, CE did not decide to preposition employees in the CE Centers. It made the decision to call in “all hands” on Saturday afternoon, after it activated the Storm Plan, as the number of outages climbed and conditions worsened. Unfortunately, worsening conditions also made it challenging for employees to get to the contact center. As a result, the Windsor CE Center’s staffing levels were at their lowest during the highest volume of calls. Pre-positioning employees in the contact centers ensures that employees are not trying to get to work during or after the storm. Rather, employees are in the centers ready to respond when customers begin to lose power. Ramping up to full staffing proved to be a lengthy and somewhat onerous process. CE first initiated an Everbridge automated notification asking all CE employees to report for storm duty, followed up by blast pages. To reach everyone, the CE Storm Staffing Team ended up having to call 200 to 250 employees that had not responded to the notification, further delaying the ramp up to full staff. The Windsor Center did not reach near-peak staffing until the fourth day of the storm. Center staffing levels actually peaked on the tenth day of the storm.144 143 Response to CSU-001. Response to CSU-109. 144 April 16, 2012 The Liberty Consulting Group page 102
  10. Page 106 of 182

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 2 Page 106 of 182 Report on the Response of CL&P and UI to Storms in August and October 2011 The CE Storm Team booked a half a dozen hotel rooms ahead of the storm, for employees who did not feel comfortable driving in storm conditions. However, the hotel lost power in the storm so employees were unable to use the rooms. Cots were provided in the Center as well. CE focused more on employee welfare during this storm, recognizing what they were asking of employees. It made provisions for three meals a day to all Windsor employees, as well as snacks and refreshments. CE also distributed Meals-Ready-to-Eat to employees to take home with them, because many employees had no power at home. It conducted stretching sessions frequently during the storm, led by CL&P’s Well-Aware coordinator. On November 3, CE brought in therapists to help employees deal with the stress caused by the storm. Therapists remained on site through November 8. CE also hired two massage therapists to provide 10-minute massages to employees on November 3 and 4. Expecting a high volume of callers over the weekend, CL&P reprogrammed its IVRs to the “after-hours” mode, informing callers that CL&P was handling emergency calls only. This remained in effect until Monday, November 7. It also placed the following upfront message on the IVR to alert callers to the storm: As of 4 p.m. on Sunday, the early nor’easter has caused unprecedented damage throughout [Connecticut/Western Massachusetts/New Hampshire]. As we work to restore the majority of customers within seven days, there may be customers in hardest hit areas where outages could last longer. We are continuing damage assessments and are working with town leaders on emergency response activities. As on location assessments are completed, we will use that information as the basis for restoration projections. We are working around the clock and will have additional support from other utilities. To report an immediate emergency such as burning wires or any other situation requiring a 911 response, or to report a April 16, 2012 The Liberty Consulting Group page 103

Text of EOE-383 Attachment 3.pdf

Extracted from the file · 55 pages · 132,814 characters

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)