Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

Text of EOE-383 Attachment 2.pdf

Extracted from the file · 182 pages · 461,233 characters

7 pages match
  1. Page 15 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 15 of 55 Docket No. 12-01-10 Page 12 alternatives to tree trimming and/or removal. First class mail does not provide written documentation that a notice was received. The EDCs must retain written documentation that a notice was received by each property owner by electronic, direct personal contact or certified mail for 24 months. The retention of written verification of vegetation management notifications shall begin no later than July 9, 2014. E. PUBLIC ACT NO. 14-151 P.A. 14-151 passed the Legislature on May 7, 2014, and proposed a requirement to Conn. Gen. Stat. §16-32h that the Authority review the use of mediation in resolving objections to proposed activities relating to vegetation management and the circumstances in which stump grinding may be performed within the UPZ. P.A. 14151also required the utility to recover all reasonable incremental costs through the nonbypassable federally mandated congestion charge. Additionally, P.A. 14-151 proposed that the DEEP review the vegetation management practices of each EDC. Further, within one year after the Authority completes its vegetation mediation review, and every two years thereafter, the Authority must submit a report to the General Assembly that reviews each EDC’s vegetation management practices. Moreover, the bill proposed several changes to Conn. Gen. Stat. §16-234 relative to the processes that utilities must follow before conducting vegetation management. Changes include the provision of additional information that allows property owners to request modification to the proposed utility work, clarifying the due dates providing for property owner objection and providing for an option for a PURA mediation and hearing process. These changes are addressed in the Authority’s analysis below. Lastly, P.A. 14-151requires that each utility operate an electronic mail account to receive objections, requests for modification, inquiries or complaints related to its vegetation management program. P.A. 14-151 is appended hereto as Attachment C.7 F. EDC VEGETATION MANAGEMENT PLAN The EDC vegetation management program includes everyday tree trimming on lateral wires to prevent the growth of vines and weeds. With ETT, limbs are pruned back from backbone wires and hazard trees are removed. The EDCs manage the tree trimming programs in the public right of way (PROW) through their private contractors, currently the Asplundh Tree Expert Company and Lewis Tree Service. Annually, each EDC files its tree trimming standards with the Authority. The most recent standards were filed in December 2013 in Docket No. 13-12-25, PURA Review of Electric Companies' and Electric Distribution Companies' Plans for Maintenance of Transmission and Distribution Overhead and Underground Lines (2014 Maintenance Plan). Both CL&P and UI attested that they have adopted and incorporated the proposed SVMTF line clearance standards within their respective Vegetation Management Plans. CL&P Responses to Interrogatories EN-2 and EN-3; UI Vegetation Management Plan Distribution Plan Cycle, dated November 1, 2013, pp. 7 On June 9, 2014, Governor Malloy signed Public Act No. 14-151 into law.
  2. Page 16 of 55Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 16 of 55 Docket No. 12-01-10 Page 13 3-10. The proposed line clearance standards were not endorsed by the SVMTF. SVMTF Report, p. 63. 1. CL&P Program CL&P allows tree growth up to 10 feet below the lowest primary and no closer than 15 feet over the highest primary wire. Exceptions were allowed for branches having a diameter greater than six inches. Hazard trees having a diameter at breast height (DBH) less than 16 inches are required to be removed.8 The removal of any tree greater than 16 inches DBH must be approved by CL&P. CL&P 2013 Maintenance Plan, Appendix 3, p. 4, filed December 20, 2012. CL&P’s ETT program has greater clearances around electric distribution facilities than the clearances in its scheduled maintenance program. CL&P Response to Interrogatory EN-1. CL&P will be moving from a five-year to a four-year cycle for scheduled vegetation maintenance, re-establishing ETT clearances on system backbones, performing ETT on laterals with large numbers of customers, removing risk trees, performing mid-cycle inspections and tree work, and performing vine removal on poles and guy wires. CL&P claimed that its system resiliency initiatives as related to vegetation management that were approved in the Decision dated January 16, 2013, in Docket No. 12-07-06 Application of The Connecticut Light and Power Company for Approval of Its System Resiliency Plan (CL&P Resiliency Decision), will reduce the impact of trees on the company’s infrastructure during storm events and improve day to day system performance. CL&P Brief, p. 2. CL&P also indicated that over the next three years it will develop a Geographic Information System (GIS) based work planning and performance tracking system that will: 1) integrate several paper-based and disparate legacy systems; 2) continue to implement the program enhancements outlined in the CL&P Resiliency Decision; and 3) develop contracts that recruit, train and maintain a local tree worker labor force. CL&P Written Comments, pp. 2 and 7; CL&P Brief, p. 3. 2. UI Program In the Decision dated August 4, 2013 in Docket No. 13-01-19, Application of The United Illuminating Company to Increase Rates and Charges, the Authority required UI, before the start of ETT work, to develop and submit to the Authority for review, a more carefully considered, optimized plan for ETT which: a) specifically addressed how the work is being packaged and prioritized for optimum effectiveness; and b) contained reporting requirements that included spending, miles trimmed and impacts on reliability of the program on a circuit and annual system basis. Decision dated August 4, 2013 in Docket No. 13-01-19, Order No. 8.9 UI allows a minimum of 6-10 feet side clearance, 12-15 feet clearance from overhanging limbs, and 5-8 feet under the primary conductor. The three-phase portion of the system is trimmed on a four-year cycle, while the single-phase portion of the system is trimmed on an eight-year cycle or where performance triggers more frequent 8 DBH is a measure of tree size where the diameter of the trunk is measured at four and one half (4-1/2) feet above the ground. SVMTF Report, p. 16. 9 On November 4, 2013, UI submitted the information in Docket No. 13-01-19, which is currently being reviewed by the Authority.
  3. Page 17 of 55Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 17 of 55 Docket No. 12-01-10 Page 14 trimming. Any single-phase portion of the system that experiences two or more tree related outages in a 36-month period is, at a minimum, trimmed to minimize the potential for future outage. UI 2013 Maintenance Plan, p. 7, filed December 17, 2012. UI’s hazard tree removal program is designed to remove trees identified as dead, dying, diseased or structurally defective and located outside of the normal trim area, but pose a potential hazard to UI facilities. Vine management involves the removal of various vines from poles and guy wires including the ground cut, removal, chip and disposal of debris. Id. UI works with local tree wardens and civic and professional groups to help educate customers about the proper selection and care of trees that may be planted near UI’s electric facilities. Safety brochures are distributed annually through bill inserts, and other events are held to educate the public on the dangers associated with energized wires and the importance of having qualified tree contractors or UI line clearance crews remove hazardous tree growth. Id., p. 8. UI indicated that it will revise its current program to create greater clearance between the vegetation and conductor to reduce the likelihood that a tree will impact the electric system during extreme weather events. Low height or ornamental trees that are already within the UPZ or those that are planted under a RTRP program will be allowed in the UPZ. Tr. 07/31/13, p. 108; UI Brief, p. 2. UI claimed that its ETT program is expected to begin in June 2014 and has a variety of benefits. These include a reduction in safety risks associated with high tree/brush density/canopy along the roadside forest as well as a reduction in Operations and Maintenance expense for future maintenance trimming as the cycle maintenance requirements will be reduced to branch trimming. UI claims its ETT program would reduce the total number of customers affected and total restoration time by 25-50% for future storms as severe as the Tropical Storm Irene and Storm Sandy events. Tr. 07/31/13, p. 109; UI Brief, p. 2. 3. EDC Vegetation Management Plan Costs The EDCs increased the amount of tree trimming work since 2011 to harden their distribution systems. The EDCs proposed plans in 2013 to significantly increase vegetation management expenditures over the next five to eight years. In the Decision dated June 30, 2010, in Docket No. 09-12-05 Application of The Connecticut Light and Power Company to Amend Its Rate Schedules (CL&P 2010 Rate Case Decision), CL&P was allowed $24.6 million for annual tree trimming ($21.5 million for expense and $3.1 million for capital spending) to be collected through rates for 5 years. CL&P 2010 Rate Case Decision, p. 37; Response to Interrogatory EL-11 in Docket No. 09-12-05. In the CL&P Resiliency Decision, the Authority permitted CL&P to increase its total tree trimming expenditures by $191 million during 2013 through 2017 ($35 million for maintenance tree trimming and $156 million for ETT program). CL&P Resiliency Plan Decision, p. 7; Late Filed Exhibit No. 2 filed in Docket No. 12-07-06. Thus, over
  4. Page 18 of 55Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 18 of 55 Docket No. 12-01-10 Page 15 the next 5 years, CL&P will spend $314 million [($24.6 million x 5 = $123 million) + $191 million] for vegetation maintenance. In 2011, UI spent $5.0 million on tree trimming. UI Response to Interrogatory EN-31 in Docket No. 12-06-09, PURA Establishment of Industry Performance Standards for Electric and Gas Companies. In the Decision dated August 14, 2013 in Docket No. 13-01-19 on page 14, the Authority approved UI’s $100 million ETT program to be carried out over 8 years (at $12.5 million per year). The Authority recognizes that there could be incremental cost increases and schedule impacts associated with the implementation of P.A. 14-151 that became effective after the EDC budgets were authorized by the PURA. Therefore, the Authority will require the EDCs to submit a summary of the cost, schedule and any other impacts associated with the implementation of Public Act 14-151 in its 2015 T&D Maintenance Plan. The Authority will also review any associated cost increase for CL&P in Docket No. 14-05-06, Application of The Connecticut Light and Power Company to Amend Rate Schedules. 4. Clean-Up and Disposal CL&P requires its contractors to make every effort to minimize the amount of wood and wood chip hauled away from the work site. This can be accomplished by making arrangements with property owners to leave logs and larger limbs at the site for use as firewood, blowing chips onto the ground and in rural and unimproved natural locations, offering the chips to property owners for use as mulch. Where chips cannot be left on site, they must be transported to the nearest appropriate disposal space. Normally, the site shall be cleaned up daily and left in at least as neat and orderly condition as it was found. All debris must be disposed of in accordance with all local laws and regulations. CL&P 2014 Maintenance Plan, Appendix 3, pp. 2, 7 and 8. Additionally, logs from tree trunks and larger limbs must be cut into mutually agreed upon or convenient handling lengths. No logs can be split. Logs must be left at the work site in a safe location, not pose a hazard to anyone for a maximum of seven days, during which time they will be available for anyone to pick up. Any logs remaining after seven days must be delivered to the appropriate disposal site. Id., p. 8. Contractors may not leave cut-off brush overnight except on off-road sections. The contractors cannot sell any unwanted logs or chips directly from their trucks during the normal scheduled workday. Id. UI requires its contractors to completely remove all brush and debris from the work area. Brush or wood cannot remain on public thoroughfares or on private property overnight unless arrangements have been made by the contractor’s crew leader or UI supervisor with the proper authorities or property owner. All line clearance by-products must be disposed of at approved sites and in the most economical manner. Brush or wood may not be burned. UI 2014 Maintenance Plan, p. 37. The removal of brush and debris resulting from a storm is normally not the utility contractor’s responsibility, unless otherwise authorized by UI. Id.
  5. Page 19 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 19 of 55 Docket No. 12-01-10 Page 16 The Authority is interested in the economic value of the tree wood as a potential offset to the cost of the VMPs. Because it was not fully explored in the proceeding, the Authority will direct CL&P to provide a status report on the University of Connecticut’s (UCONN) Stormwise study of the value of the wood from removed trees and large limbs and file the results of the study with the Authority when it is completed. Tr. 3/5/14, p. 349. Both towns and utility contract line clearance tree crews work together to remove hazardous trees. UI Response to Interrogatory EN-11. On occasion, the EDCs and towns make arrangements to work together where the EDC will prune or remove the tree and the towns cleans up and discard the wood. Providing its VMP and work schedule to the towns so that they may schedule and coordinate their work is one way for the EDC to reduce their total costs. Consequently, the Authority directs the EDCs to work together with the towns to coordinate their vegetation management work to reduce vegetation management costs to ratepayers, tax payers, utilities and municipalities. G. AUTHORITY MODIFICATIONS TO THE EDC MANAGEMENT PLAN Conn. Gen. Stat. §16-234(b) also raised a high level of public concern. Conn. Gen. Stat. §16-234(b), as amended by P.A. 14-151states: A utility may perform vegetation management within the UPZ, as necessary, to secure the reliability of utility services. (Emphasis added). Vegetation management means the retention of trees and shrubs that are compatible with the utility infrastructure and the pruning or removal of trees, shrubs or other vegetation that pose a risk to the reliability of the utility infrastructure. Conn. Gen. Stat. §16-234(b) provides that vegetation management activities may be performed in the UPZ as necessary to ensure the reliability of utility services which may necessitate the pruning or removal of trees on the opposite side of the street or PROW which is outside the UPZ. Thus, the Authority expects the utility companies to use alternative solutions (other than the outright removal of vegetation) within the UPZ whenever conditions permit. In response to the SVMTF Report, the EDCs proposed tree clearance standards. A copy of those standards are appended hereto as Appendix D. The Authority has reviewed those standards and finds them acceptable with the following modifications. 1. Line Clearance Requirements The Authority will require the EDCs to modify their line clearance standards to incorporate the requirements of P.A. 14-151 as indicated below: 1. Routine maintenance tree and brush work (tree pruning) shall be performed on a four-year cycle. All roadside and off-road primary voltage lines shall be cleared at least once every four years. 2. The UPZ shall be the area eight feet to the side of all primary conductors from the ground to the sky. The 8 foot line clearance dimension is a starting point for evaluation of the UPZ. The actual distance will result from the required cut of the tree so that a healthy tree remains.
  6. Page 20 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 20 of 55 Docket No. 12-01-10 Page 17 a. Enhanced clearance shall be performed, subject to paragraph 4 below, to achieve the following clearances on all circuit backbone and lateral conductors selected for enhanced tree work: i) remove all tall growing tree species below the infrastructure within the UPZ; and ii) remove all overhanging limbs within the UPZ. ETT with Compatible Trees in the UPZ b. Scheduled maintenance clearance shall be performed, subject to paragraph 4 below, to achieve the following clearance around all primary voltage conductors not selected for enhanced tree work: i) 10 feet below within the clearance zone, and ii) 15 feet overhead within the clearance zone. 3. Remove hazard trees within the UPZ and on private property after obtaining the private property owner’s written consent. 4. Retention and planting of compatible trees and shrubs in the UPZ: a. Each tree shall be evaluated by the EDC at least 10 days prior to sending a notice and by the tree crew at the time that it is pruned. The EDC shall consider tree species, condition, growth rate and failure characteristics, PROW limitations, tree location, the potential combined movement of vegetation and conductors during routine winds, and sagging of conductors due to elevated temperatures or icing when performing line clearance. b. Pruning of vegetation shall be performed in a manner that retains the structural integrity and health of the vegetation.
  7. Page 21 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 21 of 55 Docket No. 12-01-10 Page 18 c. The EDC shall consider critical loads and the number of customers on the circuit served downstream of the pruning area. d. Any non-hazardous tree located in whole or in part within the UPZ may be retained, provided that its species, condition and growth rate indicate that pruning without removal will reduce the risk of harm to the utility infrastructure e. Compatible trees and shrubs listed in the SVMTF Report or added by the DEEP in the future may remain in or be planted in the future in the UPZ. 5. Written consent shall be obtained from the tree owner to prune or remove a tree on private property. 6. No tree shall be pruned in the PROW without a permit from the tree warden. 7. A written permit must be obtained from the local tree warden to remove a tree in the PROW. 7. Clearance shall be performed in accordance with the following tree care industry standards: a. American National Standards Institute (ANSI) Z133.1. b. Occupational Safety and Health Administration (OSHA) 29 CFR 1910.269. c. ANSI A300 Part 1: Tree, Shrub, and Other Woody Plant Maintenance – Standard Practices, Pruning. d. Best Management Practices, Utility Pruning of Trees. Id., pp. 46 and 47. The Authority will direct each EDC to incorporate the vegetation management plan and line clearance standards in its annual Maintenance Plan filings. VMPs must be comprehensive and flexible to accommodate the many vegetation differences across the state. For work to be performed under the line clearance standards, the EDC must consider the diversity of vegetation in urban, suburban and rural areas in determining the necessary pruning required to ensure reliability in those areas. The Authority will monitor the EDCs’ annual vegetation management plans and their actual achievements through the annual maintenance dockets and rate case proceedings. In addition, The Authority will require each EDC to include a schedule of its ETT work plan activities to be completed for each town in its VMP. The EDC should provide the municipalities its vegetation maintenance work plan so they can more efficiently schedule and coordinate their tree work with the EDC trimming schedule in their respective towns. The OCC stated that UI and CL&P and their contractors should be alerted to those situations that may result in creating “hazard trees” due to excessive pruning when making trees safer for storm events. A hazard tree may be created when a healthy tree is overly pruned or a substantial part of it is removed. OCC Brief, p. 4. In implementing the vegetative management program within the UPZ, the utility companies and their contractors should be mindful of this risk and remove the entire tree if pruning would create an unhealthy or a hazard tree condition. Any compatible tree that is in the UPZ and is on the SVMTF list of RTRP, as described in Section II. I., Right Tree, Right Place Program, below, shall remain and be properly trimmed unless there is a special circumstance requiring its removal. For conditions where trees require extensive pruning (shaving) on one side of the tree, the EDC shall inform the property owner of the specific type of pruning required, the resulting aesthetics and health of the tree and its potential to fall compared to complete
  8. Page 22 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 22 of 55 Docket No. 12-01-10 Page 19 removal before a contractor begins to prune the tree. When service reliability and safety conditions permit, the EDC may relax its ETT standards to allow tall healthy trees to remain in the UPZ. While such trees should be properly pruned, they need not be removed if the tree location is at the end of a line, does not affect downstream customers nor serves critical loads. 2. Notification of Vegetation Management Activities P.A. 14-151 requires that no utility shall prune or remove any tree or shrub within the UPZ or on or overhanging any public road, public highway or public ground, without providing notice of the proposed vegetation management to the abutting property owner or private property owner. That notice must include an option for the abutting property owner or private property owner to consent, in writing, to the pruning or removal, an option to object to the proposed pruning or removal or the ability to modify the pruning or removal. The notice must also include instructions regarding how the recipient may object. If requested by an owner of private property, the utility, municipality or the Commissioner of Transportation, must provide the owner with information regarding whether a tree or shrub to be pruned or removed is in the public right-of-way or whether such tree or shrub is on the owner's private property. The notice will be considered delivered to the abutting property owner or private property owner when it is: (a) mailed via first class mail, electronic mail or text message; (b) delivered, in writing at the location of the property owner; or (c) simultaneously expressed verbally and provided in writing. A utility must deliver notice to the abutting property owner or private property owner at least 15 business days before the starting date of pruning or removal. The notice must indicate that: (a) an objection to pruning or removal must be filed, in writing, with the utility and either the tree warden of the municipality or the Commissioner of Transportation, as appropriate, not later than ten business days after delivery of the notice; and (b) the objection may include a request for consultation with the tree warden or the Commissioner. No utility is required to provide notice if the tree warden of the municipality or the Commissioner, authorizes in writing, pruning or removal by the utility of a hazardous tree within the UPZ or on or overhanging any public highway or public ground. If the hazardous tree is outside of the public right-of-way, the utility must make a reasonable effort to notify the property owner of the proposed pruning or removal at least three days prior to performing pruning or removal. There are no requirements in this subsection that require a utility to prune or remove a tree. H. OBJECTION, MEDIATION AND HEARING PROCESS Conn. Gen. Stat. §16-234(c)(4), as amended by P.A. 14-151, provides a process for abutting property owners to object to the EDCs’ tree pruning or removal proposal or request for modification by filing a complaint with either the local tree warden or the Commissioner of Transportation. In the event that an abutting property owner remains
  9. Page 23 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 23 of 55 Docket No. 12-01-10 Page 20 dissatisfied following a filing of their formal complaint with the tree warden or, the abutting property owner may appeal to the Authority for final resolution. P.A. 14-151 requires the Authority to hold a hearing within 60 calendar days of receipt of an abutting property owner's or utility's written appeal of the tree warden's decision. The Authority may authorize the pruning or removal of any tree or shrub at issue in the hearing if it finds that public interest requires such action. The burden of proving public interest is the responsibility of the utility. Additionally, P.A. 14-151requires that the Authority complete a review for the use of mediation to resolve objections to proposed vegetation management activities and when stump grinding may be performed within the UPZ. Following that review, the Authority will designate an entity to oversee the mediation sessions as determined in the review. Those sessions must be held not later than 30 calendar days after receipt of an abutting property owner or utility appeal of the tree warden's or the Commissioner’s decision. Also as part of P.A. 14-151, the abutting property owner has an option to directly proceed to a PURA hearing. When the appeal is not settled by mediation, or the abutting owner elects not to use a mediation session, the Authority must hold a hearing not later than 30 calendar days after the conclusion of the mediation session, or within 60 calendar days when there is no mediation session. The Authority may authorize the pruning, removal or stump grinding of any tree or shrub in the hearing if it finds that public interest requires such action. The burden of proving public interest is on the utility. When an objection or request for modification has been filed, no tree or shrub subject to the objection or request for modification may be pruned or removed until a final decision has been reached. The Authority may request the DFU to participate in its review of an appeal to the PURA and seek recommendation(s) for required work to resolve the matter. The Authority will meet with the DFU to determine how it can assist the PURA when reviewing the EDCs’ annual vegetation management plans. This may be an opportunity for the DFU to issue and update its standards for identifying compatible trees and shrubs. The DFU also will be requested to advise the Authority of industry training programs concerning utility maintenance and best practices for care of the roadside forest. The Authority strongly supports the notion that property owner suggestions and objections to proposed vegetation management work be resolved at the local level. I. RIGHT TREE, RIGHT PLACE PROGRAM The RTRP program is an educational program that identifies compatible trees that can be planted under or alongside utility lines. Compatible trees have a short height and will not grow into the trim area for the EDC lines.10 The EDCs currently promote this program with their customers through bill inserts and on their websites. The program also illustrates non-compatible trees and how close they can be planted near the utility lines. The Authority encourages the EDCs to continue the promotion of the RTRP program. 10 The SVMTF listed a number of comparable trees with short mature heights. SMVTF Report, pp. 40-44. Until new standards are issued by the DEEP for identifying such comparable trees and shrubs, P.A. 13-298 requires that the SVMTF’s listing is followed. Act, Section 60(a)(4).
  10. Page 24 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 24 of 55 Docket No. 12-01-10 Page 21 Similarly, the Authority urges municipalities to continue to incorporate the RTRP guidelines in their ordinances and regulations. Tree Wardens should be informed of new property developments and be involved in their plans to assist in having compatible trees planted near utility lines and having non-compatible trees planted a safe distance away from utility infrastructure so as they mature, their fall zone will not enter the UPZ. J. OTHER ISSUES AND RECOMMENDATIONS A number of issues were not resolved by the SVMTF. Should the SVMTF be reconvened, the Authority recommends that it address the following issues. 1. Private Property Owners’ Responsibility CL&P indicated that the Act did not specifically address tree owner responsibility and liability for trees that cause damage to the company’s facilities. Since the storms of 2011, numerous experts and consultants have concluded that the condition of the trees growing alongside CL&P’s conductors has deteriorated and presents a growing risk to utility infrastructure. A key issue remaining to be addressed is the need for public and private tree owners to take an active role in maintaining trees along public roadways. CL&P Brief, p. 4. CL&P contended that roadside tree maintenance should not be the responsibility of the electric utilities only. A well-maintained roadside forest would reduce the number and duration of power outages and blocked roads as a result of tree failures. It is more cost effective to maintain trees than it is to restore damaged infrastructure. CL&P contended that public and private tree owners should be responsible for maintaining their trees within the rights of way and should be held responsible for resulting claims should their successful objection to line clearance work result in tree failure and damage. Id. The SVMTF concurred with CL&P regarding trees on private property that have potential to fail and impact public safety. It recommended that those trees be maintained by the owners of those trees. SVMTF Report, p. 35. Damage from trees located on private property adjacent to utility infrastructure remains problematic since these trees are not under the control of the utilities except for the branches that overhang the PROW. In the opinion of the Authority, the participation by private property owners would lead to improved reliability, safer roads, less cleanup costs and faster restoration. 2. Traffic Control CL&P indicated that traffic control remains a large and growing cost within the overall vegetation management program. Given the fact that trees within the PROW are typically within the jurisdiction of the local tree warden, CL&P contended that the towns requiring police officers to provide traffic control during vegetation management activities should provide such services at no cost to CL&P. This would incent the towns to deploy traffic control resources more efficiently and cost effectively, ultimately reducing costs to customers. CL&P Brief, p. 5.

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026