Interrogatory responses
Answers to questions 379, 380, 381, 382, 383
Files11
EOE-379_Final.pdf
PDF · 181 KB · 5 pagesText searchable
Download EOE-379_Final.pdfRead the text of EOE-379_Final.pdf
EOE-379 Attachment 1.pdf
PDF · 1.2 MB · 2 pagesText searchable
Download EOE-379 Attachment 1.pdfRead the text of EOE-379 Attachment 1.pdf
EOE-380_Final.pdf
PDF · 96 KB · 3 pagesText searchable
Download EOE-380_Final.pdfRead the text of EOE-380_Final.pdf
EOE-381_Final.pdf
PDF · 89 KB · 2 pagesText searchable
Download EOE-381_Final.pdfRead the text of EOE-381_Final.pdf
EOE-382_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download EOE-382_Final.pdfRead the text of EOE-382_Final.pdf
EOE-383_Final.pdf
PDF · 133 KB · 4 pagesText searchable
Download EOE-383_Final.pdfRead the text of EOE-383_Final.pdf
EOE-383 Attachment 1.pdf
PDF · 1.3 MB · 125 pagesText searchable
Download EOE-383 Attachment 1.pdfRead the text of EOE-383 Attachment 1.pdf
EOE-383 Attachment 2.pdf
PDF · 3.5 MB · 182 pagesText searchable
Download EOE-383 Attachment 2.pdfRead the text of EOE-383 Attachment 2.pdf
EOE-383 Attachment 3.pdf
PDF · 3.5 MB · 55 pagesText searchable
Download EOE-383 Attachment 3.pdfRead the text of EOE-383 Attachment 3.pdf
EOE-383 Attachment 4.pdf
PDF · 715 KB · 2 pagesText searchable
Download EOE-383 Attachment 4.pdfRead the text of EOE-383 Attachment 4.pdf
EOE-383 Attachment 5.pdf
PDF · 730 KB · 7 pagesText searchable
Download EOE-383 Attachment 5.pdfRead the text of EOE-383 Attachment 5.pdf
Text of EOE-381_Final.pdf
Extracted from the file · 2 pages · 3,490 characters
Text of EOE-382_Final.pdf
Extracted from the file · 1 page · 2,648 characters
Text of EOE-383_Final.pdf
Extracted from the file · 4 pages · 10,383 characters
Text of EOE-383 Attachment 1.pdf
Extracted from the file · 125 pages · 401,903 characters
Text of EOE-383 Attachment 2.pdf
Extracted from the file · 182 pages · 461,233 characters
Page 32 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 32 of 55 Docket No. 12-01-10 Page 29 14. The SVMTF recommended that municipalities provide the traffic control or ensure the traffic control services are provided at straight time rather than overtime rates for either flag crews and/or police. 15. The electric gain is typically located on the upper seven feet of the utility pole and is reserved for electric power line facilities. 16. The communications gain is comprised of a number of attached facilities for purposes of communications. 17. AT&T and Verizon perform vegetation maintenance only on an as-needed basis. IV. CONCLUSION AND ORDERS A. CONCLUSION In light of the reviews and recommendations from the SVMTF reports, legislative mandates and the Authority requirements, the EDCs’ approved vegetation maintenance plans have resulted in a significant increase to their budgets for their annual vegetation management programs over the next five to eight years. The EDCs were directed to incorporate legislative mandates from the Acts and their proposed standards to the SVMTF, as amended by the Authority, into their annual system maintenance plans. Increased education for the public on compatible plant trees through the RTRP program would significantly help to prevent infrastructure damage from falling trees and future pruning costs. Falling trees and branches caused utility outages with significant costs and increased public safety expenses. This is an issue affecting all companies and their respective customers. Thus, all utility companies/attachers should share in the responsibility of proper vegetation management. The Authority will further review the costs and responsibilities of vegetation management by the pole owners and attachers in a separate proceeding. Conn. Gen. Stat. §16-234 and the changes ordered to line clearance standards for vegetation management within this Decision provide a fair balance between customer concerns, costs, safety, infrastructure reliability and faster restoration of service due to major storms. B. ORDERS For the following Orders, submit an original of the required documentation to the Executive Secretary, 10 Franklin Square, New Britain, Connecticut 06051, and file an electronic version through the PURA’s website at www.ct.gov/pura. Submissions filed in compliance with PURA Orders must be identified by all three of the following: Docket Number, Title and Order Number. 1. No later than July 11, 2014, the EDCs shall incorporate the EDCs’ proposed standards, as amended by the Authority, into their respective annual Maintenance Plans and only file the changes made to its current Maintenance Plan with the Authority.Page 33 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 33 of 55 Docket No. 12-01-10 Page 30 2. No later than July 30, 2014, each EDC shall provide to the Authority an explanation of how it will record and track objections to its respective vegetation management activity and all follow-up actions it will take with the property owner. 3. No later than July 30, 2014, each utility shall provide proof to the Authority that it has informed their respective customers of its electronic mail account and its purpose to receive objections, requests for modification, inquiries or complaints related to its VMP. 4. No later than July 30, 2014, CL&P shall provide a status report on the UCONN Stormwise study of the value of the wood from removed trees and large limbs and file the results of the study to the Authority when it is completed. 5. No later than August 4, 2014, each EDC shall submit to the Authority an example of its notice to their respective customers and property owners by email, fax, first class mail and certified mail with return receipt to perform any vegetation management activity. 6. No later than September 2, 2014, each utility shall provide proof to the Authority that it has established and is operating their respective electronic mail account to receive objections, requests for modification, inquiries or complaints related to its vegetation management program. 7. No later than September 2, 2014 Verizon and CL&P shall report on the status of their discussions to update their respective Agreements regarding vegetation management plan’s cost sharing purposes and submit any renegotiated agreement to the Authority for its approval. 8. No later than December 1, 2014, each EDC shall provide proof to the Authority that they have included the information required by P.A. 14-151in their respective notices for vegetation management activities. 9. No later than December 1, 2014, the EDCs shall initiate discussions with Frontier/SNET regarding the update to their Agreements for vegetation management plan’s cost sharing purposes and inform the Authority of such. 10. No later than 15 business days following the completion of its investigation into Ms. Bradford’s complaint, CL&P shall report to the Authority the results of the investigation and CL&P’s follow-up actions. 11. The EDCs shall include the information listed in Section II.C. in their annual VMP.Page 34 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 34 of 55 Docket No. 12-01-10 V. Page 31 APPENDICES APPENDIX A - SERVICE LISTPage 35 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 35 of 55 Docket No. 12-01-10 Page 32Page 36 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 36 of 55 Docket No. 12-01-10 Page 33Page 37 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 37 of 55 Docket No. 12-01-10 Page 34Page 38 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 38 of 55 Docket No. 12-01-10 Page 35 APPENDIX B – PUBLIC ACT NO. 13-198 Public Act No. 13-298 AN ACT CONCERNING IMPLEMENTATION OF CONNECTICUT'S COMPREHENSIVE ENERGY STRATEGY AND VARIOUS REVISIONS TO THE ENERGY STATUTES. Sec. 60. Section 16-234 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2013): [No telegraph, telephone or electric light company or association, nor any company or association engaged in distributing electricity by wires or similar conductors or in using an electric wire or conductor for any purpose, shall exercise any powers which may have been conferred upon it to change the location of, or to erect or place, wires, conductors, fixtures, structures or apparatus of any kind over, on or under any highway or public ground, without the consent of the adjoining proprietors, or, if such company or association is unable to obtain such consent, without the approval of the Public Utilities Regulatory Authority, which shall be given only after a hearing upon notice to such proprietors; or to cut or trim any tree on or overhanging any highway or public ground, without the consent of the owner thereof, or, if such company or association is unable to obtain such consent, without the approval of the tree warden or the consent of the authority, which consent shall be given only after a hearing upon notice to such owner; but the authority may, if it finds that public convenience and necessity require, authorize the changing of the location of, or the erection or placing of, such wires, conductors, fixtures, structures or apparatus over, on or under such highway or public ground; and the tree warden in any town or the authority may, if he or it finds that public convenience and necessity require, authorize the cutting and trimming and the keeping trimmed of any brush or tree in such town on or overhanging such highway or public ground, which action shall be taken only after notice and hearing as aforesaid, which hearing shall be held within a reasonable time after the application therefor.] (a) As used in this section: (1) "Utility" means a telephone, telecommunications, electric or electric distribution company, each as defined in section 16-1, as amended by this act; (2) "Utility protection zone" means any rectangular area extending horizontally for a distance of eight feet from any outermost electrical conductor or wire installed from pole to pole and vertically from the ground to the sky; (3) "Hazardous tree" means any tree or part of a tree that is (A) dead, (B) extensively decayed, or (C) structurally weak, which, if it falls, would endanger utility infrastructure, facilities or equipment;Page 39 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 39 of 55 Docket No. 12-01-10 Page 36 (4) "Vegetation management" means pruning or removal of trees, shrubs or other vegetation that pose a risk to the reliability of the utility infrastructure, and the retention of trees and shrubs that are compatible with the utility infrastructure. Until such time as the Department of Energy and Environmental Protection issues standards for identifying such compatible trees and shrubs, the standards and identification of such compatible trees and shrubs shall be as set forth in the 2012 final report of the State Vegetation Management Task Force; and (5) "Pruning" means the selective removal of plant parts to meet specific goals and objectives, when performed according to current professional tree care standards. (b) A utility may perform vegetation management within the utility protection zone to secure the reliability of utility services by protecting overhead wires, poles, conductors or other utility infrastructure from trees and shrubs, parts of trees and shrubs or other vegetation located within the utility protection zone. (c) (1) In conducting vegetation management, no utility shall prune or remove any tree or shrub within the utility protection zone, or on or overhanging any highway or public ground, without delivering notice to the abutting property owner. Notice shall be considered delivered when it is (A) mailed to the abutting property owner via first class mail, (B) delivered, in writing, at the location of the abutting property, or (C) simultaneously conveyed verbally and provided in writing to the abutting property owner. A utility shall deliver such notice to the abutting property owner if (i) pursuant to subparagraph (A) or (B) of this subdivision, at least fifteen business days before the starting date of any such pruning or removal, and (ii) pursuant to subparagraph (C) of this subdivision, at any time before any such pruning or removal, provided no utility may start such pruning or removal unless (I) the objection period pursuant to subdivision (2) of this subsection has been met, or (II) such property owner affirmatively waives, in writing, the right to object. (2) The notice shall indicate that (A) objection to pruning or removal shall be filed in writing with the utility and either the tree warden of the municipality or the Commissioner of Transportation, as appropriate, not later than ten business days after delivery of the notice, and (B) the objection may include a request for consultation with the tree warden or the Commissioner of Transportation, as appropriate. (3) If no objection is filed by the abutting property owner in accordance with subdivision (2) of this subsection, the utility may prune or remove the trees or shrubs for which notice of pruning or removal has been delivered. (4) If the abutting property owner files an objection pursuant to subdivision (2) of this subsection, the tree warden of the municipality or the Commissioner of Transportation, as appropriate, shall issue a written decision as to the disposition of the tree or shrub not later than ten business days after the filing date of such objection. This decision shall not be issued before a consultation with the abutting property owner if such a consultation has been requested. The abutting property owner or the utility may appeal the tree warden's decision to the Public Utilities Regulatory Authority within ten business days after the tree warden's decision. The authority shall hold a hearing withinPage 40 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 40 of 55 Docket No. 12-01-10 Page 37 sixty business days of receipt of the abutting property owner's or utility's written appeal of the tree warden's decision and shall provide notice of such hearing to the abutting property owner, the tree warden and the utility. The authority may authorize the pruning or removal of any tree or shrub whose pruning or removal has been at issue in the hearing if it finds that public convenience and necessity require such action. (5) When an objection has been filed pursuant to subdivision (2) of this subsection, no tree or shrub subject to the objection shall be pruned or removed until a final decision has been reached pursuant to subdivision (4) of this subsection. (d) No utility shall be required to provide notice pursuant to subsection (c) of this section if the tree warden of the municipality or the Commissioner of Transportation, as appropriate, authorizes, in writing, pruning or removal by the utility of a hazardous tree within the utility protection zone or on or overhanging any public highway or public ground. Nothing in this subsection shall be construed to require a utility to prune or remove a tree. (e) No utility shall be required to obtain a permit pursuant to subsection (f) of section 23-65 or provide notice under subsection (c) of this section to prune or remove a tree, as necessary, if any part of a tree is in direct contact with an energized electrical conductor or has visible signs of burning. Nothing in this subsection shall be construed to require a utility to prune or remove a tree. (f) No utility shall exercise any powers which may have been conferred upon it to change the location of, or to erect or place, wires, conductors, fixtures, structures or apparatus of any kind over, on or under any highway or public ground, without the consent of the adjoining proprietors or, if such company is unable to obtain such consent, without the approval of the Public Utilities Regulatory Authority, which shall be given only after a hearing upon notice to such proprietors. The authority may, if it finds that public convenience and necessity require, authorize the changing of the location of, or the erection or placing of, such wires, conductors, fixtures, structures or apparatus over, on or under such highway or public ground.Page 41 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 41 of 55 Docket No. 12-01-10 Page 38 APPENDIX C - PUBLIC ACT NO. 14-151 AN ACT CONCERNING TREE TRIMMING. Be it enacted by the Senate and House of Representatives in General Assembly convened: 1 Section 1. Subsection (c) of section 16-32h of the general statutes is 2 repealed and the following is substituted in lieu thereof (Effective from 3 passage): 4 (c) The authority shall, in the docket initiated pursuant to subsection 5 (b) of this section, review: 6 (1) Each such utility's current practices concerning service 7 restoration after an emergency. Such review shall include, but not be 8 limited to, an analysis of each such utility's (A) estimates concerning 9 potential damage and service outages prior to any emergency, (B) 10 damage and service outage assessments after any emergency, (C) 11 restoration management after any emergency, including access to 12 alternate restoration resources via regional and reciprocal aid 13 contracts, (D) planning for at-risk and vulnerable customers, (E) 14 policies concerning communication with state and local officials and 15 customers, including individual customer restoration estimates and 16 the timeliness and usefulness of such estimates, and (F) need for 17 mutual assistance during any emergency; 18 (2) The adequacy of each such utility's infrastructure, facilities and 19 equipment, which shall include, but not be limited to, an analysis of 20 (A) whether such utility is following standard industry practice 21 concerning operation and maintenance of such infrastructure, facilities 22 and equipment, and (B) whether such utility had access to adequate 23 replacement equipment for such infrastructure, facilities and 24 equipment during the course of such emergency; 25 (3) Coordination efforts between each electric distribution company 26 and any telecommunications company, community antenna television 27 company, holder of a certificate of cable franchise authority or certified 28 competitive video service provider, as those terms are defined in 29 section 16-1, including coordinated planning before any emergency; 30 (4) Tree trimming policies of each electric distribution company and 31 shall determine (A) the amount spent by each electric distribution 32 company for tree trimming in each year since such company's most 33 recent rate case, (B) each such company's system average interruption 34 duration index, as described in section 16-245y, caused by falling trees 35 and limbs, (C) the impact of expanding the area adjacent to 36 distribution lines for tree trimming, including an analysis of the 37 benefits and the costs of such expansion to ratepayers and the 38 likelihood that such expansion would decrease damage to 39 infrastructure, facilities and equipment used to distribute electricity 40 and decrease service outage frequency or duration, (D) the percentage 41 of service outages during Tropical Storm Irene and the October, 2011 42 snowstorm caused by trees and limbs outside the current trim area 43 based on an analysis of the quantity and effectiveness of prior tree 44 trimming, and (E) the standards appropriate for road-side tree care in
Text of EOE-383 Attachment 4.pdf
Extracted from the file · 2 pages · 4,635 characters
Text of EOE-383 Attachment 5.pdf
Extracted from the file · 7 pages · 11,175 characters
As listed on the current system
Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026