Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 379, 380, 381, 382, 383

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 18 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of EOE-381_Final.pdf

Extracted from the file · 2 pages · 3,490 characters

Words on different pagesRead the text of EOE-381_Final.pdf

Text of EOE-382_Final.pdf

Extracted from the file · 1 page · 2,648 characters

Words on different pagesRead the text of EOE-382_Final.pdf

Text of EOE-383_Final.pdf

Extracted from the file · 4 pages · 10,383 characters

Words on different pagesRead the text of EOE-383_Final.pdf

Text of EOE-383 Attachment 1.pdf

Extracted from the file · 125 pages · 401,903 characters

Text of EOE-383 Attachment 2.pdf

Extracted from the file · 182 pages · 461,233 characters

7 pages match
  1. Page 35 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 35 of 55 Docket No. 12-01-10 Page 32
  2. Page 36 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 36 of 55 Docket No. 12-01-10 Page 33
  3. Page 37 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 37 of 55 Docket No. 12-01-10 Page 34
  4. Page 38 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 38 of 55 Docket No. 12-01-10 Page 35 APPENDIX B – PUBLIC ACT NO. 13-198 Public Act No. 13-298 AN ACT CONCERNING IMPLEMENTATION OF CONNECTICUT'S COMPREHENSIVE ENERGY STRATEGY AND VARIOUS REVISIONS TO THE ENERGY STATUTES. Sec. 60. Section 16-234 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2013): [No telegraph, telephone or electric light company or association, nor any company or association engaged in distributing electricity by wires or similar conductors or in using an electric wire or conductor for any purpose, shall exercise any powers which may have been conferred upon it to change the location of, or to erect or place, wires, conductors, fixtures, structures or apparatus of any kind over, on or under any highway or public ground, without the consent of the adjoining proprietors, or, if such company or association is unable to obtain such consent, without the approval of the Public Utilities Regulatory Authority, which shall be given only after a hearing upon notice to such proprietors; or to cut or trim any tree on or overhanging any highway or public ground, without the consent of the owner thereof, or, if such company or association is unable to obtain such consent, without the approval of the tree warden or the consent of the authority, which consent shall be given only after a hearing upon notice to such owner; but the authority may, if it finds that public convenience and necessity require, authorize the changing of the location of, or the erection or placing of, such wires, conductors, fixtures, structures or apparatus over, on or under such highway or public ground; and the tree warden in any town or the authority may, if he or it finds that public convenience and necessity require, authorize the cutting and trimming and the keeping trimmed of any brush or tree in such town on or overhanging such highway or public ground, which action shall be taken only after notice and hearing as aforesaid, which hearing shall be held within a reasonable time after the application therefor.] (a) As used in this section: (1) "Utility" means a telephone, telecommunications, electric or electric distribution company, each as defined in section 16-1, as amended by this act; (2) "Utility protection zone" means any rectangular area extending horizontally for a distance of eight feet from any outermost electrical conductor or wire installed from pole to pole and vertically from the ground to the sky; (3) "Hazardous tree" means any tree or part of a tree that is (A) dead, (B) extensively decayed, or (C) structurally weak, which, if it falls, would endanger utility infrastructure, facilities or equipment;
  5. Page 39 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 39 of 55 Docket No. 12-01-10 Page 36 (4) "Vegetation management" means pruning or removal of trees, shrubs or other vegetation that pose a risk to the reliability of the utility infrastructure, and the retention of trees and shrubs that are compatible with the utility infrastructure. Until such time as the Department of Energy and Environmental Protection issues standards for identifying such compatible trees and shrubs, the standards and identification of such compatible trees and shrubs shall be as set forth in the 2012 final report of the State Vegetation Management Task Force; and (5) "Pruning" means the selective removal of plant parts to meet specific goals and objectives, when performed according to current professional tree care standards. (b) A utility may perform vegetation management within the utility protection zone to secure the reliability of utility services by protecting overhead wires, poles, conductors or other utility infrastructure from trees and shrubs, parts of trees and shrubs or other vegetation located within the utility protection zone. (c) (1) In conducting vegetation management, no utility shall prune or remove any tree or shrub within the utility protection zone, or on or overhanging any highway or public ground, without delivering notice to the abutting property owner. Notice shall be considered delivered when it is (A) mailed to the abutting property owner via first class mail, (B) delivered, in writing, at the location of the abutting property, or (C) simultaneously conveyed verbally and provided in writing to the abutting property owner. A utility shall deliver such notice to the abutting property owner if (i) pursuant to subparagraph (A) or (B) of this subdivision, at least fifteen business days before the starting date of any such pruning or removal, and (ii) pursuant to subparagraph (C) of this subdivision, at any time before any such pruning or removal, provided no utility may start such pruning or removal unless (I) the objection period pursuant to subdivision (2) of this subsection has been met, or (II) such property owner affirmatively waives, in writing, the right to object. (2) The notice shall indicate that (A) objection to pruning or removal shall be filed in writing with the utility and either the tree warden of the municipality or the Commissioner of Transportation, as appropriate, not later than ten business days after delivery of the notice, and (B) the objection may include a request for consultation with the tree warden or the Commissioner of Transportation, as appropriate. (3) If no objection is filed by the abutting property owner in accordance with subdivision (2) of this subsection, the utility may prune or remove the trees or shrubs for which notice of pruning or removal has been delivered. (4) If the abutting property owner files an objection pursuant to subdivision (2) of this subsection, the tree warden of the municipality or the Commissioner of Transportation, as appropriate, shall issue a written decision as to the disposition of the tree or shrub not later than ten business days after the filing date of such objection. This decision shall not be issued before a consultation with the abutting property owner if such a consultation has been requested. The abutting property owner or the utility may appeal the tree warden's decision to the Public Utilities Regulatory Authority within ten business days after the tree warden's decision. The authority shall hold a hearing within
  6. Page 40 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 40 of 55 Docket No. 12-01-10 Page 37 sixty business days of receipt of the abutting property owner's or utility's written appeal of the tree warden's decision and shall provide notice of such hearing to the abutting property owner, the tree warden and the utility. The authority may authorize the pruning or removal of any tree or shrub whose pruning or removal has been at issue in the hearing if it finds that public convenience and necessity require such action. (5) When an objection has been filed pursuant to subdivision (2) of this subsection, no tree or shrub subject to the objection shall be pruned or removed until a final decision has been reached pursuant to subdivision (4) of this subsection. (d) No utility shall be required to provide notice pursuant to subsection (c) of this section if the tree warden of the municipality or the Commissioner of Transportation, as appropriate, authorizes, in writing, pruning or removal by the utility of a hazardous tree within the utility protection zone or on or overhanging any public highway or public ground. Nothing in this subsection shall be construed to require a utility to prune or remove a tree. (e) No utility shall be required to obtain a permit pursuant to subsection (f) of section 23-65 or provide notice under subsection (c) of this section to prune or remove a tree, as necessary, if any part of a tree is in direct contact with an energized electrical conductor or has visible signs of burning. Nothing in this subsection shall be construed to require a utility to prune or remove a tree. (f) No utility shall exercise any powers which may have been conferred upon it to change the location of, or to erect or place, wires, conductors, fixtures, structures or apparatus of any kind over, on or under any highway or public ground, without the consent of the adjoining proprietors or, if such company is unable to obtain such consent, without the approval of the Public Utilities Regulatory Authority, which shall be given only after a hearing upon notice to such proprietors. The authority may, if it finds that public convenience and necessity require, authorize the changing of the location of, or the erection or placing of, such wires, conductors, fixtures, structures or apparatus over, on or under such highway or public ground.
  7. Page 41 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 41 of 55 Docket No. 12-01-10 Page 38 APPENDIX C - PUBLIC ACT NO. 14-151 AN ACT CONCERNING TREE TRIMMING. Be it enacted by the Senate and House of Representatives in General Assembly convened: 1 Section 1. Subsection (c) of section 16-32h of the general statutes is 2 repealed and the following is substituted in lieu thereof (Effective from 3 passage): 4 (c) The authority shall, in the docket initiated pursuant to subsection 5 (b) of this section, review: 6 (1) Each such utility's current practices concerning service 7 restoration after an emergency. Such review shall include, but not be 8 limited to, an analysis of each such utility's (A) estimates concerning 9 potential damage and service outages prior to any emergency, (B) 10 damage and service outage assessments after any emergency, (C) 11 restoration management after any emergency, including access to 12 alternate restoration resources via regional and reciprocal aid 13 contracts, (D) planning for at-risk and vulnerable customers, (E) 14 policies concerning communication with state and local officials and 15 customers, including individual customer restoration estimates and 16 the timeliness and usefulness of such estimates, and (F) need for 17 mutual assistance during any emergency; 18 (2) The adequacy of each such utility's infrastructure, facilities and 19 equipment, which shall include, but not be limited to, an analysis of 20 (A) whether such utility is following standard industry practice 21 concerning operation and maintenance of such infrastructure, facilities 22 and equipment, and (B) whether such utility had access to adequate 23 replacement equipment for such infrastructure, facilities and 24 equipment during the course of such emergency; 25 (3) Coordination efforts between each electric distribution company 26 and any telecommunications company, community antenna television 27 company, holder of a certificate of cable franchise authority or certified 28 competitive video service provider, as those terms are defined in 29 section 16-1, including coordinated planning before any emergency; 30 (4) Tree trimming policies of each electric distribution company and 31 shall determine (A) the amount spent by each electric distribution 32 company for tree trimming in each year since such company's most 33 recent rate case, (B) each such company's system average interruption 34 duration index, as described in section 16-245y, caused by falling trees 35 and limbs, (C) the impact of expanding the area adjacent to 36 distribution lines for tree trimming, including an analysis of the 37 benefits and the costs of such expansion to ratepayers and the 38 likelihood that such expansion would decrease damage to 39 infrastructure, facilities and equipment used to distribute electricity 40 and decrease service outage frequency or duration, (D) the percentage 41 of service outages during Tropical Storm Irene and the October, 2011 42 snowstorm caused by trees and limbs outside the current trim area 43 based on an analysis of the quantity and effectiveness of prior tree 44 trimming, and (E) the standards appropriate for road-side tree care in
  8. Page 42 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 42 of 55 Docket No. 12-01-10 Page 39
  9. Page 43 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 43 of 55 Docket No. 12-01-10 45 the state, vegetation management practices in utility rights-of-way, 46 right tree-right place standards, and any other tree maintenance 47 standard recommended by the State Vegetation Management Task 48 Force established by the Department of Energy and Environmental 49 Protection; [and] 50 (5) The use of mediation in resolving objections to proposed 51 activities relating to vegetation management, as defined in section 1652 234, as amended by this act, and the circumstances in which stump 53 grinding may be performed within the utility protection zone, as 54 defined in section 16-234, as amended by this act, provided, the utility, 55 as defined in section 16-234, as amended by this act, shall recover all 56 reasonable incremental costs incurred by such utility pursuant to the 57 directives of the authority, as established pursuant to this subdivision, 58 through the non-bypassable federally mandated congestion charge, as 59 defined in subsection (a) of section 16-1; and 60 [(5)] (6) Any other policy, practice or information that the authority 61 determines is relevant to a review of each such utility's ability to 62 ensure the reliability of such utility's services in an emergency and to 63 prevent, minimize and restore any long-term service outages or 64 disruptions caused by such emergency. 65 Sec. 2. (NEW) (Effective from passage) On and after the effective date 66 of this section, the Department of Energy and Environmental 67 Protection shall review the vegetation management practices of each 68 electric distribution company. Not later than one year after the final 69 decision has been issued by the Public Utilities Regulatory Authority 70 for the docket described in subsection (c) of section 16-32h of the 71 general statutes, as amended by this act, and every two years 72 thereafter, the authority shall submit a report, in accordance with the 73 provisions of section 11-4a of the general statutes, to the joint standing 74 committee of the General Assembly having cognizance of matters 75 relating to energy. Such report shall include a review of the vegetation 76 management practices of each electric distribution company. 77 Sec. 3. Section 16-234 of the 2014 supplement to the general statutes 78 is repealed and the following is substituted in lieu thereof (Effective 79 from passage): 80 (a) As used in this section: 81 (1) "Utility" means a telephone, telecommunications, electric or 82 electric distribution company, each as defined in section 16-1; 83 (2) "Utility protection zone" means any rectangular area extending 84 horizontally for a distance of eight feet from any outermost electrical 85 conductor or wire installed from pole to pole and vertically from the 86 ground to the sky; 87 (3) "Hazardous tree" means any tree or part of a tree that is (A) 88 dead, (B) extensively decayed, or (C) structurally weak, which, if it 89 falls, would endanger utility infrastructure, facilities or equipment; 90 (4) "Vegetation management" means the retention of trees and 91 shrubs that are compatible with the utility infrastructure and the 92 pruning or removal of trees, shrubs or other vegetation that pose a risk 93 to the reliability of the utility infrastructure. [, and the retention of trees 94 and shrubs that are compatible with the utility infrastructure.] Until 95 such time as the Department of Energy and Environmental Protection Page 40
  10. Page 44 of 55

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 44 of 55 Docket No. 12-01-10 Page 41

Text of EOE-383 Attachment 4.pdf

Extracted from the file · 2 pages · 4,635 characters

Text of EOE-383 Attachment 5.pdf

Extracted from the file · 7 pages · 11,175 characters

As listed on the current system

Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026

This filing on the current system (opens in a new tab)