Interrogatory responses
Answers to questions 379, 380, 381, 382, 383
Files11
EOE-379_Final.pdf
PDF · 181 KB · 5 pagesText searchable
Download EOE-379_Final.pdfRead the text of EOE-379_Final.pdf
EOE-379 Attachment 1.pdf
PDF · 1.2 MB · 2 pagesText searchable
Download EOE-379 Attachment 1.pdfRead the text of EOE-379 Attachment 1.pdf
EOE-380_Final.pdf
PDF · 96 KB · 3 pagesText searchable
Download EOE-380_Final.pdfRead the text of EOE-380_Final.pdf
EOE-381_Final.pdf
PDF · 89 KB · 2 pagesText searchable
Download EOE-381_Final.pdfRead the text of EOE-381_Final.pdf
EOE-382_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download EOE-382_Final.pdfRead the text of EOE-382_Final.pdf
EOE-383_Final.pdf
PDF · 133 KB · 4 pagesText searchable
Download EOE-383_Final.pdfRead the text of EOE-383_Final.pdf
EOE-383 Attachment 1.pdf
PDF · 1.3 MB · 125 pagesText searchable
Download EOE-383 Attachment 1.pdfRead the text of EOE-383 Attachment 1.pdf
EOE-383 Attachment 2.pdf
PDF · 3.5 MB · 182 pagesText searchable
Download EOE-383 Attachment 2.pdfRead the text of EOE-383 Attachment 2.pdf
EOE-383 Attachment 3.pdf
PDF · 3.5 MB · 55 pagesText searchable
Download EOE-383 Attachment 3.pdfRead the text of EOE-383 Attachment 3.pdf
EOE-383 Attachment 4.pdf
PDF · 715 KB · 2 pagesText searchable
Download EOE-383 Attachment 4.pdfRead the text of EOE-383 Attachment 4.pdf
EOE-383 Attachment 5.pdf
PDF · 730 KB · 7 pagesText searchable
Download EOE-383 Attachment 5.pdfRead the text of EOE-383 Attachment 5.pdf
Text of EOE-381_Final.pdf
Extracted from the file · 2 pages · 3,490 characters
Text of EOE-382_Final.pdf
Extracted from the file · 1 page · 2,648 characters
Text of EOE-383_Final.pdf
Extracted from the file · 4 pages · 10,383 characters
Text of EOE-383 Attachment 1.pdf
Extracted from the file · 125 pages · 401,903 characters
Text of EOE-383 Attachment 2.pdf
Extracted from the file · 182 pages · 461,233 characters
Page 7 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 7 of 55 Docket No. 12-01-10 Page 4 At the March 6, 2014 Public Comment Session, 53 members of the public spoke. New Haven Mayor Toni Harp urged the Authority to seek additional refinements to the plan, especially in the areas of implementing a tree replacement strategy for trees removed, additional input from municipal tree wardens, and a tighter definition of a hazardous tree. The City of New Haven’s tree warden, who described the city’s tree replacement policies, believed that the ETT should ensure that every healthy tree is saved. Senate Majority Leader Martin Looney (11th) also spoke regarding the ETT. Senator Looney was concerned about the aggressiveness of the plan and did not believe that it was an appropriate plan to implement. Senator Looney was also concerned that the ETT would allow the electric companies to supersede property owners’ rights. Finally, Senator Looney stated that for any ETT that is implemented, only experienced contractors and arborists should be performing the work. House Speaker Brendon Sharkey (88th) also noted his concerns with the ETT. The Representative noted that there is a legislative effort under way (HB 5408-AAC Tree Trimming) that is expected to ensure homeowners’ and municipal leaders’ rights in regard to tree trimming. State Senator Joseph Crisco, Jr. (17th) urged the Authority to find a balanced approach that would meet the needs of the utility companies, the homeowners and municipalities. Senator Crisco also suggested a “call before you cut” program be implemented to ensure that property owners were aware of any work to be done on their trees. State Representative Michael D’Agostino (91st) noted that he and his constituents recognize the need to remove/trim dead or hazardous trees that could impact the electric distribution system. However, a “one-size-fits-all” plan as put forward in the ETT is not a preferable method. Representative D’Agostino stated that each neighborhood has its own individuality, and control over the trees that are trimmed or removed should rest with those homeowners and municipalities. Derrylyn Gorski, First Selectman of the Town of Bethany argued that the utility companies should be spending more to upgrade and strengthen its infrastructure as opposed to implementing an ETT. Many consumers and organizations also provided testimony on the ETT and did not support the UI and CL&P tree trimming plans. Comments from members of the public and other organizations in attendance mirrored those previously provided by the public officials. In addition, a very significant number of the speakers called for in the initiation of a program to begin undergrounding utility lines as opposed to implementing an ETT. Many of the speakers stated that burying utility lines would be much more preferable to the damage that they perceived an ETT would cause to their homes and neighborhoods. They also noted the economic benefits provided by street trees. Besides the impact on property values, there were other socio-economic factors and environmental factors that the speakers thought the utility companies were ignoring with the ETTs’ implementation. Many persons commenting were also supportive of a program that ensured that healthy trees were saved and that some form of treereplacement protocol be implemented should dead or hazardous trees be removed. The Garden Club of New Haven noted that it does not endorse service outages, but endorses the continued preservation of healthy, valuable trees.Page 8 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 8 of 55 Docket No. 12-01-10 F. Page 5 THE FORESTRY DIVISION OF THE DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION’S POSITION Christopher Martin, from the Department of Energy and Environmental Protection’s (DEEP) Bureau of Natural Resources, Forestry Division (DFU), spoke at the March 5, 2014 afternoon session. He stated that it is important to appropriately balance the state's interests in maintaining a resilient energy infrastructure while simultaneously preserving and protecting the environmental, aesthetic, and economic value of the state's natural vegetation. Connecticut has one of the most dense tree canopies in the United States and is number one in woodland urban interface tree density. Mr. Martin also stated that Connecticut-specific industry standards for tree trimming do not exist. Findings of the State Vegetation Management Task Force (SVMTF) included tree pruning and removal of roadside trees, and the emphasized need for flexibility due to differences among the roadside landscape in Connecticut's urban, suburban, and rural gradients. Mr. Martin also noted the benefits of trees when they are healthy and well maintained. He sees this area as one of management to protect the utility infrastructure, an area where resiliency and practices of arboriculture and silviculture can take place so that the trees and wires can coexist. Mr. Martin also discussed the October 2011 Snowstorm, which was more extreme than Irene. Two out of five trees that catastrophically failed and impacted utility wires came from private property. According to Mr. Martin, in the absence of increased tree care of forest management, together with an overall decline in forest health, increased tree failure must be anticipated. Mr. Martin recommended that a multifaceted approach continue to increase Connecticut's electric power grid resiliency. Smart-grid technology, micro-grid deployment and hardening of the utility infrastructure combined with judicious tree trimming should help ensure a balanced approach. Public benefits from roadside trees vary along landscape gradients from urban, suburban to rural, and those benefits increase proportionately to the density of the population. Mr. Martin also suggested that utility tree trimming should complement smart-growth principles that encourage the public's interest in downtown residencies. Also, communication and coordination with the municipal tree wardens is essential for a successful tree-trimming program. In the opinion of Mr. Martin, while large structurally sound and healthy trees near utility wires may be acceptable, no amount of pruning in Connecticut can completely avoid outages from occurring during extreme weather events. DFU noted Governor Malloy's Two-Storm Panel Recommendation Number 24, which advised the DEEP to convene appropriate state agencies, municipalities, utilities for the purpose of creating a five-year collaborative effort for an enhanced tree-trimming maintenance program, and the development of an educational effort regarding the use of appropriate and diverse tree species in both public and private spaces. DFU suggested that this be done by convening a multidisciplinary team to develop best management tree-trimming practices that recognize public benefits along the roadside tree gradient from urban, suburban to rural landscapes. DFU recommended that the Authority consider creating a standing advisory board comprised of roadside tree and forest management experts. This advisory board could then develop utility treetrimming recording and performance criteria so the effectiveness of various treetrimming best management practices can be measured and that those practices be refined as necessary. He also requested that the work of the UCONN extension andPage 9 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 9 of 55 Docket No. 12-01-10 Page 6 the Connecticut Agricultural Experiment Station on Stormwise and their conclusions and findings be used to advise further roadside tree and forest management decisions and recommendations. According to Mr. Martin, there is some preliminary indication that Stormwise, when implemented, could reduce tree-trimming frequencies from 5 to 15year cycles. This would be in more rural areas of the state where the Stormwise principles are most effective; however, they could translate into suburban areas and maybe some urban areas. Tr. 03/05/14, pp. 383-394. Tracy Babbidge, DEEP Energy and Technology Policy Bureau, Bureau Chief, also spoke at the March 6, 2014 session in Hamden and reiterated many of the points made by Mr. Martin. Chris Donnelly, an Urban Forestry Coordinator for the DEEP, spoke at the March 27, 2014 Technical Meeting and claimed that tree risk assessment is very active in treecare circles. Mr. Donnelly stated that the increase in knowledge and information has grown exponentially due to the amount of detailed data derived from inventory technology and remote sensing technology, to develop a better understanding of the environment where these trees grow, which is a major reason why certain trees fail and others do not. Also, there are many new tools that measure tree decay. These tools are moving out to the field. There should be skilled, knowledgeable professional people in the field making such decisions and assessing trees. Tr. 03/27/14, pp. 839-842. II. AUTHORITY ANALYSIS During 2011 and 2012, there were three major storms that each caused utility outages, which exceeded the highest number of service outages ever experienced in the state.1 The majority of service outages were caused by trees falling on overhead electrical distribution lines and broken utility poles. Connecticut is the fifth most forested state in the nation (72.6%), and leads the nation in the forest cover found in urban areas (67.4%). Connecticut has the highest percentage of forested land that has homes and trees in close proximity. This situation has evolved over the course of many decades. SVMTF Report, p. 8.2 A. UTILITY SERVICE TERRITORY CL&P and UI are the EDCs that serve approximately 94% of state territory. The remaining 6% of the state’s area is served by municipal utilities. CL&P covers 87% of the geographic area of Connecticut and serves approximately 1.2 million customers. Decision dated August 21, 2013 in Docket No. 13-07-01, DPUC 2013 Annual Report to the General Assembly on Electric Distribution Company System Reliability, p. 3. CL&P’s service territory includes urban, suburban, and rural areas with an extensive amount of wooded and hilly terrain. The rural area and high density of trees in much of CL&P’s territory can have a significant effect on its distribution system, both in terms of the design of many of the circuits and the performance of the circuits that traverse such areas. Id. UI covers 7% of the geographic area of Connecticut and serves approximately 320,000 customers. UI’s service territory includes predominantly urban 1 In 2011, Tropical Storm Irene occurred on August 28, 2011, resulting in 815,000 total peak power outages, the October Snowstorm occurred on October 29, 2011, resulting in 832,000 total peak power outages. August 1, 2012 Decision in Docket No. 11-09-09, PURA Investigation of Public Service Companies' Response to 2011 Storms, p. 2. Storm Sandy occurred on October 28, 2012, resulting in 657,000 total peak power outages. August 21, 2013 Decision in Docket No. 12-11-07, PURA Investigation into the Performance of Connecticut’s Electric Distribution Companies and Gas Companies in Restoring Service Following Storm Sandy, pp. 5 and 26. 2 The SVMTF issued its final report on August 28, 2012.Page 10 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 10 of 55 Docket No. 12-01-10 Page 7 and suburban areas, with one small rural area in Easton, Connecticut. Id. The Southern New England Telephone Company d/b/a AT&T Connecticut (AT&T) and Verizon New York, Inc. (Verizon) are the telephone companies that serve the state.3 B. TIMELINE OF STORM EVENTS AND REVIEWS There were several reviews of the utilities’ preparation and restoration efforts for the three major storms conducted by consultants, taskforces and the Authority. As a result of those reviews, there were many requirements and recommendations to make the utility infrastructure more resilient to storm damage providing for shorter restoration times following outages. The recommendations included several actions for utilities to implement their vegetation management practices to reduce future infrastructure damage caused by falling trees and branches. Most of the reviews’ recommendations have been implemented by the utilities. The following table is a chronological listing of the 2011-2012 major storm events and related reviews of utility performance in preparing for the storm and during the storm recovery. EVENT REPORT/DOCKET REVIEW PURPOSE Tropical Storm Irene, August 28, 2011 October Snowstorm, October 29, 2011 Connecticut October 2011 Snowstorm Power Restoration Report, Witt Associates, Report issued December 1, 2011 Report of the Two Storm Panel, Report issued January 5, 2012 Gov. Malloy Announces Storm Disaster Preparedness & Recovery Initiatives issued January 11, 2012 Docket No. 11-09-09, PURA Investigation of Public Service Companies' Response to 2011 Storms, Decision issued August 1, 2012 3 Verizon’s territory covers only a small portion of Greenwich. Evaluation of restoration efforts for October Snowstorm. Evaluation of restoration efforts for Tropical Storm Irene and October Snowstorm. Enhance and augment the ability of the state, municipalities and its partners to better prepare for and respond to natural disasters and intense weather situations Evaluation of restoration efforts for Tropical Storm Irene and October Snowstorm.Page 11 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 11 of 55 Docket No. 12-01-10 EVENT Page 8 REPORT/DOCKET REVIEW State Vegetation Management Task Force Final Report, Report issued on August 28, 2012 PURPOSE Management of roadside trees in Connecticut. Storm Sandy, October 28, 2012 Docket No. 12-06-09, PURA Establishment of Industry Performance Standards for Electric and Gas Companies, Decision issued on November 1, 2012 Docket No. 12-07-06, Application of The Connecticut Light and Power Company for Approval of its System Resiliency Plan, Decision issued on January 16, 2013 Establishment of restoration performance standards and penalties. CL&P $300 million for a 5 year plan for additional tree trimming and system hardening during 20132017. Section 60 of the Act, revised legislation to maintain utility protection zone and simplify electric distribution company tree pruning notification process. Public Act No. 13-298, An Act Concerning Implementation Of Connecticut's Comprehensive Energy Strategy And Various Revisions To The Energy Statutes (Act), Signed by Governor Malloy on July 8, 2013. Docket No. 12-11-14, PURA Investigation into the Performance of Connecticut's Telecommunications, Cable Television Providers and Water Companies in Restoring Service Following Storm Sandy, Decision issued on July 12, 2013 Evaluation of restoration efforts for Storm Sandy. Docket No. 12-06-10, PURA Establishment of Industry Performance Standards for Telecommunications Companies, Decision issued on August 14, 2013 Establishment of restoration performance standards.Page 12 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 12 of 55 Docket No. 12-01-10 EVENT Public Act No. 14-151, An Act Concerning Tree Trimming, Signed by Governor Malloy on June 9, 2014 C. Page 9 REPORT/DOCKET PURPOSE REVIEW Docket No. 13-01-19, UI $100 million for an 8 year Application of The United plan for tree pruning during Illuminating Company to 2014-2021; $12.5 million Increase Rates and per year. Charges, Decision issued on August 14, 2013 Docket No. 12-11-07, Evaluation of restoration PURA Investigation into the efforts for Storm Sandy. Performance of Connecticut’s Electric Distribution Companies and Gas Companies in Restoring Service Following Storm Sandy, Decision issued on August 21, 2013 The bill made several changes to Conn. Gen. Stat. §16-234 for the process utilities must follow before conducting vegetation management. THE STATE VEGETATION MANAGEMENT TASKFORCE The DEEP established and appointed the members of the SVMTF.4 Its mission was to develop standards for roadside tree care in Connecticut, vegetation management practices and schedules for utility rights of way, Right Tree Right Place (RTRP) standards, standards for tree wardens, municipal tree inventories and pruning schedules. SVMTF Report, p. 8. The SVMTF Report contained a joint proposal by the EDCs recommending minimum line clearance standards to be adopted as part of the vegetation management plan.5 Id., pp. 47 and 48. The EDCs’ proposed standards are intended to protect each company’s primary electric lines and equipment during normal and severe weather. The EDCs’ proposed line clearance standards are appended hereto as Attachment C. The EDCs proposed to file an annual vegetation management plan with the Authority that would include but not be limited to: 1. Work scope and budget details: a. roadside miles scheduled, backbone and lateral; 4 There were 20 members assigned to the task force representing electrical and telecommunications utilities as well as state, municipal and private tree managers, non-profit environmental representatives and other experts. 5 The SVMTF did not analyze or endorse the EDCs’ proposed line clearance standards. SVMTF Written Exceptions filed December 13, 2013, pp. 2 and 3.Page 13 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 13 of 55 Docket No. 12-01-10 b. c. d. e. f. g. h. i. 2. 3. 4. 5. Page 10 right-of-way miles, brush control and side pruning; risk tree removal; vine control; traffic control; customer request tree work; mid-cycle; emergency restoration, minor storm; and other. Tree and brush work specification. Line clearance organization. Property owner notification and consent procedures. The planned maintenance within each town within the EDC’s service territory. Id., p. 46. The Authority will direct the EDCs to provide the above information in their annual vegetation management plans and also require that the following information also be included: 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. Number of property owner/customer objections by town in prior year. Number of property owner/customer objections by town in prior year accepted by the Tree Warden. Number of property owner/customer requests for modifications and decisions reached. Number of trees per town assessed to be hazardous or non-hazardous. Number of property owners/customers who give affirmative consent versus non responses. Number of mediations conducted and outcome of mediation. Number of objections appealed to PURA by either the EDC or landowner and outcome. Number of removals of non-hazardous trees. Number of RTRP trees planted by the EDC, reasons for planting, costs. Did property owner maintain the newly planted tree? Number of stumps ground by EDC, reasons for stump grinding, costs. The Authority plans to include the DFU in the review process for the annual vegetation management plans. The Authority will meet with the DFU in the coming months to determine how best to work with them in this review. Initial topics to be discussed will be the shared responsibility to evaluate the Vegetative Management Plans (VMP), additional data collection and the differences in vegetative management practices that are needed for utilization in urban, suburban and rural areas. The Authority may require additional data to be filed in its VMP after it meets with the DFU.Page 14 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 14 of 55 Docket No. 12-01-10 D. Page 11 PUBLIC ACT NO. 13-298 Section 60 of the Act6 amended Conn. Gen. Stat. §16-234. In particular, Section 60 streamlined the approval process for vegetation-related work. The Act in part, established a Utility Protection Zone (UPZ) that extends horizontally for a distance of eight feet from any outer-most conductor or wire installed from utility pole to utility pole and vertically from the ground to the sky. Additionally, the Act addressed utility tree pruning and removal requirements, retention of compatible trees and shrubs, utility rights and a process for the abutting property owner to object to tree-related work. The terminologies “trim or cut” has been replaced with “prune or remove” and “tree owner” has been replaced with “abutting property owner.” Further, the Act changed the requirement from “obtaining consent from the tree owner” to trim or remove a tree or shrub to “providing a notice to the abutting property owner” to trim a tree or shrub at least 15 business days in advance. Lastly, the Act included detailed information explaining how an abutting property owner can object to the trimming of a tree. Section 60 of the Act is appended hereto as Attachment B. Conn. Gen. Stat. §16-234(c)(1) effective July 1, 2013, fostered several complaints from customers concerning property owners not receiving notification of vegetation management activities along their property pursuant to the three methods of notification contained in that statute. For vegetation management purposes, Conn. Gen. Stat. §16-234(c) (1) provides that: …no utility shall prune or remove any tree or shrub within the utility protection zone, or on or overhanging any highway or public ground, without delivering notice to the abutting property owner. Notice shall be considered delivered when it is (A) mailed to the abutting property owner via first class mail, (B) delivered, in writing, at the location of the abutting property, or (C) simultaneously conveyed verbally and provided in writing to the abutting property owner. A utility shall deliver such notice to the abutting property owner…at least fifteen business days before the starting date of any such pruning or removal…at any time before any such pruning or removal, provided no utility may start such pruning or removal unless (I) the objection period…has been met, or (II) such property owner affirmatively waives, in writing, the right to object. To ensure that property owners receive proper notice of vegetation management activities along their property, the Authority will require that the EDCs provide advanced written and timely notice to each property owner of pending vegetation management activities by email, fax or direct, personal contact. The Authority will also require that any customer who cannot be reached by email, fax or direct, personal contact by the EDC, shall be notified by certified mail with return receipt. The sender of the certified letter shall be identified as, “EDC name-Tree Trimming Notification.” Written confirmation of direct personal contact may be established by having the property owner initial the Company’s field notes of the notification meeting. The EDCs shall keep a record of when it made personal contact with the property owner. Specifically, each public service company undertaking tree trimming activities shall provide advanced written notification of the tree trimming activity. Such notice should be provided in advance of the work activity so that the property owner has sufficient time to consider all 6 Section 60 of the Act was codified on January 1, 2014, as Conn. Gen. Stat. §16-234.Page 15 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 15 of 55 Docket No. 12-01-10 Page 12 alternatives to tree trimming and/or removal. First class mail does not provide written documentation that a notice was received. The EDCs must retain written documentation that a notice was received by each property owner by electronic, direct personal contact or certified mail for 24 months. The retention of written verification of vegetation management notifications shall begin no later than July 9, 2014. E. PUBLIC ACT NO. 14-151 P.A. 14-151 passed the Legislature on May 7, 2014, and proposed a requirement to Conn. Gen. Stat. §16-32h that the Authority review the use of mediation in resolving objections to proposed activities relating to vegetation management and the circumstances in which stump grinding may be performed within the UPZ. P.A. 14151also required the utility to recover all reasonable incremental costs through the nonbypassable federally mandated congestion charge. Additionally, P.A. 14-151 proposed that the DEEP review the vegetation management practices of each EDC. Further, within one year after the Authority completes its vegetation mediation review, and every two years thereafter, the Authority must submit a report to the General Assembly that reviews each EDC’s vegetation management practices. Moreover, the bill proposed several changes to Conn. Gen. Stat. §16-234 relative to the processes that utilities must follow before conducting vegetation management. Changes include the provision of additional information that allows property owners to request modification to the proposed utility work, clarifying the due dates providing for property owner objection and providing for an option for a PURA mediation and hearing process. These changes are addressed in the Authority’s analysis below. Lastly, P.A. 14-151requires that each utility operate an electronic mail account to receive objections, requests for modification, inquiries or complaints related to its vegetation management program. P.A. 14-151 is appended hereto as Attachment C.7 F. EDC VEGETATION MANAGEMENT PLAN The EDC vegetation management program includes everyday tree trimming on lateral wires to prevent the growth of vines and weeds. With ETT, limbs are pruned back from backbone wires and hazard trees are removed. The EDCs manage the tree trimming programs in the public right of way (PROW) through their private contractors, currently the Asplundh Tree Expert Company and Lewis Tree Service. Annually, each EDC files its tree trimming standards with the Authority. The most recent standards were filed in December 2013 in Docket No. 13-12-25, PURA Review of Electric Companies' and Electric Distribution Companies' Plans for Maintenance of Transmission and Distribution Overhead and Underground Lines (2014 Maintenance Plan). Both CL&P and UI attested that they have adopted and incorporated the proposed SVMTF line clearance standards within their respective Vegetation Management Plans. CL&P Responses to Interrogatories EN-2 and EN-3; UI Vegetation Management Plan Distribution Plan Cycle, dated November 1, 2013, pp. 7 On June 9, 2014, Governor Malloy signed Public Act No. 14-151 into law.Page 16 of 55
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 13, 2026 EOE-383 Attachment 3 Page 16 of 55 Docket No. 12-01-10 Page 13 3-10. The proposed line clearance standards were not endorsed by the SVMTF. SVMTF Report, p. 63. 1. CL&P Program CL&P allows tree growth up to 10 feet below the lowest primary and no closer than 15 feet over the highest primary wire. Exceptions were allowed for branches having a diameter greater than six inches. Hazard trees having a diameter at breast height (DBH) less than 16 inches are required to be removed.8 The removal of any tree greater than 16 inches DBH must be approved by CL&P. CL&P 2013 Maintenance Plan, Appendix 3, p. 4, filed December 20, 2012. CL&P’s ETT program has greater clearances around electric distribution facilities than the clearances in its scheduled maintenance program. CL&P Response to Interrogatory EN-1. CL&P will be moving from a five-year to a four-year cycle for scheduled vegetation maintenance, re-establishing ETT clearances on system backbones, performing ETT on laterals with large numbers of customers, removing risk trees, performing mid-cycle inspections and tree work, and performing vine removal on poles and guy wires. CL&P claimed that its system resiliency initiatives as related to vegetation management that were approved in the Decision dated January 16, 2013, in Docket No. 12-07-06 Application of The Connecticut Light and Power Company for Approval of Its System Resiliency Plan (CL&P Resiliency Decision), will reduce the impact of trees on the company’s infrastructure during storm events and improve day to day system performance. CL&P Brief, p. 2. CL&P also indicated that over the next three years it will develop a Geographic Information System (GIS) based work planning and performance tracking system that will: 1) integrate several paper-based and disparate legacy systems; 2) continue to implement the program enhancements outlined in the CL&P Resiliency Decision; and 3) develop contracts that recruit, train and maintain a local tree worker labor force. CL&P Written Comments, pp. 2 and 7; CL&P Brief, p. 3. 2. UI Program In the Decision dated August 4, 2013 in Docket No. 13-01-19, Application of The United Illuminating Company to Increase Rates and Charges, the Authority required UI, before the start of ETT work, to develop and submit to the Authority for review, a more carefully considered, optimized plan for ETT which: a) specifically addressed how the work is being packaged and prioritized for optimum effectiveness; and b) contained reporting requirements that included spending, miles trimmed and impacts on reliability of the program on a circuit and annual system basis. Decision dated August 4, 2013 in Docket No. 13-01-19, Order No. 8.9 UI allows a minimum of 6-10 feet side clearance, 12-15 feet clearance from overhanging limbs, and 5-8 feet under the primary conductor. The three-phase portion of the system is trimmed on a four-year cycle, while the single-phase portion of the system is trimmed on an eight-year cycle or where performance triggers more frequent 8 DBH is a measure of tree size where the diameter of the trunk is measured at four and one half (4-1/2) feet above the ground. SVMTF Report, p. 16. 9 On November 4, 2013, UI submitted the information in Docket No. 13-01-19, which is currently being reviewed by the Authority.
Text of EOE-383 Attachment 4.pdf
Extracted from the file · 2 pages · 4,635 characters
Text of EOE-383 Attachment 5.pdf
Extracted from the file · 7 pages · 11,175 characters
As listed on the current system
Question(s) Answered 379, 380, 381, 382, 383 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026