    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-044 Page 1 of 3 Date Filed: August 14, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, Mark P. Baldwin, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (STORM: RIGHT OF FIRST REFUSAL-RoFR) Respond to the following: a. Discuss the nature of a RoFR contract. b. Identify all external vendors subject to a RoFR agreement and separately provide a listing of all instances where a RoFR was initiated. c. Provide a complete copy of each vendor’s RoFR contract and the corresponding pricing schedules. d. For each vendor/contract identified in subsection b & c above, identify if the RoFR rates are in excess of the Company’s standard contract rates. If the RoFR rates are higher, provide an unlocked Excel spreadsheet that compares the rates. Response: a. A Right of First Refusal (“RoFR”) agreement is a supplemental storm-resource arrangement designed to improve the Company’s ability to secure qualified external line crews in advance of a potentially catastrophic weather event, under circumstances where there is competition for crews due to an expected or ongoing regional impact. The agreements were established to support the Company’s objective of having access to up to 2,000 crews when significant restoration needs were anticipated. The electric utility industry has a limited supply of qualified line crews and demand for those resources increases significantly when major storms are emerging in weather forecasts. This is particularly relevant for East Coast storms that may initially affect southern utilities before moving into the Eversource service territory. Contractors may commit their available crews to utilities earlier in the projected storm path, thereby reducing the number of resources available to Eversource and other utilities located in more northern areas. Under the RoFR agreement, participating contractors who are requested by a utility other than Eversource are required to contact Eversource Emergency Preparedness and notify Eversource that they have been solicited to work for another utility. Eversource then has a limited time period to either activate the RoFR conditions and engage that contractor or to allow the requesting contractor to engage in work for another utility. The RoFR arrangement provides Eversource with the first opportunity to secure an agreed-upon
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-044 Page 2 of 3 number of crews from participating contractors within specified mobilization timeframes. When Eversource formally activates the RoFR and hires the committed resources under the agreement, the contractor is provided with a minimum three-day compensation commitment. This provision is intended to encourage contractors to reserve and mobilize resources for Eversource rather than commit those resources elsewhere. b. The external vendors subject to a Right of First Refusal (“RoFR”) agreement during the period are identified in the contractor listing provided below: 1. Elecnor Energy Services 2. Grattan Line Construction Corp. 3. Holland Power 4. IB Abel 5. Iconic Power Systems US Inc. 6. Michels Power, Inc. 7. MTV Solutions 8. One Source Power 9. Quality Lines Inc. 10. Sparks Energy Inc. 11. Support Operations Services (SOS) 12. Tempest Energy Eversource did not initiate or activate any RoFR agreements during the timeframe covered in this case. Accordingly, there were no instances of RoFR activation, no crews secured under the three-day minimum compensation provision, and no associated RoFR payments associated with the storms under review in this docket. c. Please reference EOE-044, Attachment 1, for a complete listing of each vendor’s RoFR contract and corresponding pricing schedule. The chart below details the referenced page numbers for each contract.
  3. Page 3

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-044 Page 3 of 3 Vendor / Description ELECNOR ENERGY SERVICES LLC GRATTAN LINE CONSTRUCTION CORP HOLLAND POWER SERVICES INC IB ABEL INC ICONIC POWER SYSTEMS INC MICHELS POWER INC MTV SOLUTIONS INC ONE SOURCE POWER LLC QUALITY LINES INC SUPPORT OPERATIONS SERVICES LLC SPARKS ENERGY INC TEMPEST ENERGY LLC Attachment 2 2 2 2 2 2 2 2 2 2 2 2 Page Number 1 61 90 117 137 193 226 260 288 307 369 402 d. The RoFR agreements do not establish separate or increased labor, equipment, or stormservice rates. Rather, each RoFR agreement supplements the contractor’s existing storm agreement by identifying the number of crews the contractor may be required to commit to Eversource and the timeframe within which those crews must be available. Contractors performing work pursuant to a RoFR activation are compensated using the applicable rates contained in their existing storm contracts. Accordingly, the RoFR arrangement does not cause the contractor’s underlying rates to exceed the Company’s standard contract rates. There are no upfront costs to Eversource solely for maintaining a RoFR agreement. The three-day minimum compensation commitment applies only when Eversource formally activates the RoFR, hires the resources under that agreement, and directs the contractor to reserve or mobilize the committed crews. Because the RoFR agreements do not contain separate or higher rate schedules, a rate-comparison spreadsheet is not applicable.

As listed on the current system

Question(s) Answered 44 (CL&P dba Eversource Energy) Date Filed: 08/14/2026