Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 67

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy1 file
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files1

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-067 Page 1 of 1 Date Filed: August 18, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Education, Outreach, and Enforcement Question: (PHOTOGRAPHY) Provide a detailed listing of all photography related costs included within the Company’s Test Year O&M expenses and corresponding Rate Year expenses. Additionally, identify all Photography related expenses included within any other deferred cost, including storm costs. Response: Noted below are the photography related costs included in the Company’s Test Year O&M expenses and escalated based on the Gross Domestic Product Price Index (GDP-PI) for the Rate Year. Additionally, there is approximately $155 of deferred costs related to photography in this proceeding. Description Field Operations - Overhead Lines Residual O&M Photography Related Test Year Costs Schedule Schedule C-3.16 Schedule C-3.33 FERC Acct 923000 923000 Amounts $ $ 29,822 8,646 38,468 Interim GDP-PI Adjustment 4.73% 1,820 Rate Year GDP-PI Adjustment 1.64% 661 Photography Related Rate Year Costs $ 40,949

As listed on the current system

Question(s) Answered 67 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/18/2026

This filing on the current system (opens in a new tab)