Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 33

Files7

Text of RSR-033 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RSR-033 Attachment 3.pdf

Extracted from the file · 1 page · 1,002 characters

Text of RSR-033 Attachment 2 REDACTED.pdf

Extracted from the file · 60 pages, 21 without text · 78,965 characters

  1. Page 1 of 28

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  2. Page 2 of 28

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 29, 2026 RSR-033 Attachment 4 REDACTED Page 2 of 28 Creation of an “Of Choice” Program – Due to anticipated amount of work needing to be performed during the 3-year term of this contract, Procurement and EAD determined an “Of Choice” program would be the best tool to execute the work. Similar to the Constructor of Choice program, suppliers would be evaluated on a technical and commercial basis to develop a pool of suppliers where low dollar/low risk projects under $250K could be direct assigned on a T&M basis and higher dollar/higher risk projects over $250K would be competitively bid on a lump sum basis. • • Technical Qualification/Evaluation: (30%) i. Bidders evaluated on qualifications as remediation contractors, examples of previous experiences, equipment list, capabilities, and a company statement of qualifications. Commercial Evaluation: (70%) i. Key Time and Materials Rates – A comprehensive Schedule of Values was provided by the bidders and the 30 most anticipated rate classifications for labor, equipment, and materials were selected for evaluation ii. Scenario Pricing – Worked with the ERG Project Team to create pricing scenarios using the rates provided in the comprehensive pricing sheet, to see what “typical” small jobs and “typical” large jobs would be valued at – these values were evaluated for all bidders. iii. Percentage Mark-up – Bidders were evaluated on Subcontractor Mark up, Equipment and Material Mark-up, and Disposal Mark up. Bidders with the highest composite technical and commercial evaluation were selected for the smaller/low risk/direct assign work on a T&M basis (“small jobs”). The team worked to ensure an adequate number of suppliers were available to support all regions within the Eversource service territory. • Under $250K, direct assign, T&M • Projects under $250K, but with disposal costs over $100K shall be competitively bid (this is due to so many unknown waste streams on these projects, obtaining rates for disposal facilities would be a fruitless effort – the project team agreed to obtain a competitive markup percentage for disposal). Bidders with the highest technical score (proved capable of supporting more complex, larger, projects, such as MGP sites) were selected for the larger/high risk/competitive bid work on a lump sum basis ("large jobs"). The team worked to ensure an adequate number of suppliers were available to support all regions within the Eversource service territory. • Over $250K, competitive bid, lump sum
  3. Page 3 of 28

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  4. Page 4 of 28

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 29, 2026 RSR-033 Attachment 4 REDACTED Page 4 of 28 Procurement Milestones: MILESTONE RFX is issued Pre-bid Conference Call RFX is closed Preliminary Bid Evaluation is complete Preliminary Recommendation approved by Procurement Manager Meeting with EAD Management and to Recommend Contractors for Negotiation and Award Subsidiary Board Approval Contract Award RFP/Project Team: DEPARTMENT Procurement EAD Project Team EAD Remediation Manager NAME DATE 12/31/18 1/11/19 2/8/19 3/29/19 3/29/19 4/17/19 6/18/19 7/1/19
  5. Page 5 of 28

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  6. Page 6 of 28

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  7. Page 7 of 28

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  8. Page 8 of 28

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  9. Page 9 of 28

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  10. Page 10 of 28

    No text on this page. It may be a picture of a page, such as a scan or a chart.

As listed on the current system

Question(s) Answered 33 (The Connecticut Light and Power Company) Date Filed: 10/16/2026