Interrogatory responses
Answers to questions 37
Filed by The Connecticut Light and Power Company3 files
Part of docket 26-05-10Files3
RSR-037_Final.pdf
PDF · 112 KB · 1 pageText searchable
Download RSR-037_Final.pdfRead the text of RSR-037_Final.pdf
RSR-037 Attachment 1 REDACTED.pdf
PDF · 2.7 MB · 11 pagesText searchable
Download RSR-037 Attachment 1 REDACTED.pdfRead the text of RSR-037 Attachment 1 REDACTED.pdf
RSR-037 Attachment 2 REDACTED.pdf
PDF · 22 KB · 1 pageNo text in this file
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set PURA-09
Date Issued September 29, 2026
RSR-037
Page 1 of 1
Date Filed: October 14, 2026
Witness:
Marc J. Richards and Gary A. Iadarola
Request from: Public Utilities Regulatory Authority
Question:
(ENVIRONMENTAL REMEDIATION) Application, Ex. CLP-ENV-1, pp. 34–35. Regarding Site
#103 Parsons Lane Durham Mineral Oil Dielectric Fluid Release:
a. Provide a copy of the settlement agreement;
b. Provide the total portion of project costs recovered through the settlement agreement
and the portion of costs requested for recovery in this proceeding;
c. Explain why these costs are recovered through the deferred accounting mechanism
rather than as a routine environmental remediation cost; and
d. Describe why the utility pole failed and provide the age of the pole at the time of failure.
Response:
a. Please refer to RSR-037, Attachment 1 CONFIDENTIAL, for a copy of the settlement
agreement.
b. Please refer to RSR-037, Attachment 2 CONFIDENTIAL, for the requested information.
c. As noted in the testimony in Exhibit CLP-ENV-1 of Marc J. Richards, Gary A. Iadarola, and
Clare B. Connolly, the sequence, timing, and magnitude of response activities can vary from
site to site depending upon the size of the site, the degree of contamination, nearby sensitive
receptors, land ownership, the degree of oversight and control exercised by regulators, and
many other site-specific factors. These dynamic circumstances, on-site conditions and state
and municipal requirements or expectations speed projects up or slow projects down,
impacting not only timing but cost. All of these variables make it extremely difficult to
accurately forecast the level of expense to be incurred in a year and cause significant
fluctuations year-over-year in the level of expense incurred. Therefore, these costs do not fit
well with traditional base rate recovery which is designed to establish base distribution rates
based on expected future levels of annual costs. The variability in these environmental
remediation costs drives the need for the continuation of deferral treatment. This request is not
a blank check, but rather a treatment that requires the Company to meet the burden of a
prudence review on its environmental remediation costs in the next rate case.
d. The pole was installed in 1962. The reason for failure is unknown.
As listed on the current system