Interrogatories
To CL&P, questions 1 thru 20
Files1
26-05-10 CLF Sierra Club Interrogatories Set 1 Corrected.pdf
PDF · 150 KB · 16 pagesText searchable
Download 26-05-10 CLF Sierra Club Interrogatories Set 1 Corrected.pdfRead the text of 26-05-10 CLF Sierra Club Interrogatories Set 1 Corrected.pdf
September 4, 2026
VIA ELECTRONIC MAIL
RE:
Docket No. 26-05-10 – Application of the Connecticut Light and Power
Company d/b/a Eversource Energy To Amend Its Rate Schedules
Dear Counsel:
Enclosed please find the corrected first set of information requests from Conservation
Law Foundation and Sierra Club in the above-referenced matter, issued to Connecticut Light
and Power Company d/b/a Eversource Energy. This version has been corrected to remove CLFSC-21 through -23, as those information requests were filed separately in CLF and Sierra
Club’s second set of information requests. If there are any questions about this correction please
contact the undersigned counsel.
Sincerely,
Shannon Laun
Senior Attorney
Conservation Law Foundation
195 Church Street
Mezzanine Level, Suite B
New Haven, CT 06510
Phone: [phone removed]
Email: [email removed]
Sarah Krame
Staff Attorney
Sierra Club Environmental Law Program
50 F St. NW, 8th Floor
Washington, DC 20001
Phone: [phone removed]
Email: [email removed]
Enclosures
cc:
Service List
1
INSTRUCTIONS
The responses to these interrogatories and production requests must be submitted in the
following manner:
A.
Documents provided shall be complete and, unless privileged, unredacted,
submitted as found in the responding party’s files (e.g., documents that in their
original condition were stapled, clipped or otherwise fastened together or
maintained in separate file folders shall be produced in such form). The
responding party may submit photocopies (with color photocopies where
necessary to accurately reproduce the document), in lieu of original documents,
provided that such copies are true, correct, and complete copies of the original
document.
B.
Documents submitted shall be produced in the order in which they appear in the
responding party’s files and shall not be shuffled or otherwise rearranged. Mark
each page with identification and consecutive document control numbers.
C.
Data must be produced in the data format in which it is typically used and
maintained. Moreover, to the extent a responsive document has been
electronically scanned (for any purpose), that document must be produced in a
readable and accessible electronic format, with the opportunity provided to review
the original document.
D.
Provide English translations of all responsive documents that exist in a language
other than English.
E.
Documents to be produced include all documents in the possession, custody or
control of the responding party, wherever located, including documents in the
possession, custody, or control of the responding party’s directors, officers,
employees, representatives, or agents. Without limitation on the term “control,” a
document is deemed to be in a responding party’s control if it has the right to
secure that document or a copy thereof from another person.
F.
Where an Interrogatory asks to provide all documents please provide all data,
assumptions, schedules, and calculations relied upon. Provide the source of and
basis for all data and assumptions employed. Include all studies, reports and
planning documents from which data, estimates, or assumptions were drawn and
support for how the data or assumptions were used in developing the projections
or estimates. Provide and explain all supporting workpapers. Where applicable,
provide supporting workpapers and calculations in the form of live unlocked
Microsoft Excel spreadsheet files with all cell references/links and formulae
intact.
G.
Each Interrogatory to provide all documents or similar phrases includes a request
to “identify” all such documents. “Identify” means to state the nature of the
2
document, the date on which it was prepared, the subject matter and the titles and
the names and positions of each person who participated in the preparation of the
document, the addressee and the custodian of the documents. To the extent that a
document is self-identifying, it need not be separately identified.
H.
If the Company finds any request to be ambiguous, please notify Conservation
Law Foundation and Sierra Club through their counsel so that the request can be
clarified prior to the preparation of a written response.
I.
If information requested is not available and cannot be made available in the exact
form requested, provide such information or documents as can be made available
that best respond to the request.
CLAIMS OF PRIVILEGE
If you contend that any answer to any interrogatory or any document demanded by these
interrogatories is privileged in whole or in part, file with your response to these interrogatories a
statement in writing and under oath and in such statement: (1) identify each such interrogatory
answer or document; (2) state its general subject matter; and (3) state in detail the basis for each
claim of privilege made with respect to it. If a claim of privilege is made to only a part of a
document, then in addition to the statement required herein, produce a public copy of such
document from which the alleged privileged portion has been redacted, noting where in the
document such redactions have been made.
SCOPE
If subsequent to your initial compliance with these interrogatories and production
requests you discover additional or new material or information responsive to any interrogatory
or request for production, or you discover that any response you provide herein was totally or
partially incorrect or, though correction was made, is no longer true, you must promptly (a) file
any additional responsive documents that come into your possession, custody, or control, or (b)
file supplemented, corrected, and sworn responses. You are specifically directed to supplement,
modify, or correct your responses to each of these interrogatories and production throughout
until a final decision is adopted by the Authority in this Docket.
DEFINITIONS
1. The “Company” or “Eversource” refers to the Connecticut Light and Power Company d/b/a
Eversource Energy. Unless the request specifically provides otherwise, the term Company or
Eversource includes all witnesses, representatives, employees, and legal counsel.
2. “Document,” “documentation,” or “workpaper” is used in its broadest sense and includes,
without limitation, writings, drawings, graphs, charts, photographs, phono-records,
microfilm, microfiche, computer printouts, correspondence, handwritten notes, records or
3
reports, bills, checks, articles from journals or other sources, other data compilations from
which information can be obtained, and all copies of such documents that bear notations or
other markings that differentiate such copies from the original.
INTERROGATORIES
CLF-SC-1.
Please provide any quantitative heat pump adoption forecast(s) for the
Company's service territory prepared by the Company, or by a third party on
behalf of the Company, in CSV format or in live Microsoft Excel format with
all formulae intact. For each forecast, please provide results by year including,
as available:
a. the number of customers with heat pumps that year;
b. the percentage of customers with heat pumps in that year;
c. the additions to and/or reductions from summer and winter peak demand (in
MW) caused by heat pump adoption in that year.
If a forecast distinguishes among heat pump types (e.g., standard air-source,
cold-climate air-source, geothermal/ground-source, etc.), please provide
results broken out by heat pump type. If a forecast includes multiple scenarios,
please provide results for each scenario separately. If the Company does not
possess any such forecast, please explain in detail why not.
CLF-SC-2.
In reference to each heat pump adoption forecast provided in response to the
preceding request, please provide a detailed description of the methodology
used to develop the forecast, including but not limited to:
a. the heat pump technologies and/or equipment models assumed;
b. how each scenario was defined and the assumptions distinguishing one
scenario from another;
c. the data sources and key assumptions (e.g., baseline adoption rates, building
stock characteristics, retrofit versus new construction, incentive programs)
underlying the forecast.
If the Company is unable to provide any of the foregoing methodology details,
please explain in detail why not.
CLF-SC-3.
For the test year in this proceeding, please provide:
a. the number of residential electric customers with a heat pump as their primary
heating source;
b. the total electricity consumption (kWh) of these customers;
c. the total electric delivery revenue attributable to these customers, in the
aggregate.
4
The Company may provide this information either as a summary table or as
the underlying billing and customer data necessary to derive it (e.g.,
anonymized billing-quality data identifying each customer's heating source,
together with that customer's kWh consumption and delivery revenue for the
period). Please provide this information in CSV format or in live Microsoft
Excel format (with all formulae intact). If the Company does not possess the
information necessary to produce any of the three items requested (heat pump
customer count, consumption, or delivery revenue), please state specifically
which item(s) the Company is unable to provide, and explain in detail why not
for each. If the Company is not able to produce all three items requested for
the test year, but is able to do so for a different time period, please provide
these figures for the most recent time period available.
CLF-SC-4.
For the same test year specified in the preceding request, please provide the
number of residential electric customers, total electricity consumption (kWh),
and total electric delivery revenue, broken out separately for the residential
customer groups whose primary heating is:
a.
b.
c.
d.
electric resistance
natural gas
delivered fuels (e.g., fuel oil, propane)
other/unknown heating sources
Please provide this information in the same format requested in the preceding
request. If the Company does not possess the information necessary to
produce any of the three items requested (customer count, consumption, or
delivery revenue) for any of the residential customer categories listed above,
please state specifically which items and/or categories the Company is unable
to provide, and explain in detail why not for each item and category identified.
If the Company is not able to produce all three items requested for each
category for the test year, but is able to do so for a different time period,
please provide these figures for the same time period as is used in CLF-SC-3.
CLF-SC-5.
For the test year provided by the Company in this rate case, please provide (a.)
the Company's calculation of the cost of service (i.e., cost to serve)
attributable to residential electric customers with a heat pump as their primary
heating source, in the aggregate, together with (b.) a detailed description of
the methodology used to develop this cost of service figure, as well as (c.)
data sources, allocators, and assumptions used, in live Microsoft Excel format
with all formulae unlocked. If the Company's cost of service calculations use a
different period than the one specified above, please identify the period
actually used. If the Company does not possess the information necessary to
calculate the cost of service for heat pump customers, please explain in detail
why not. If the Company is unable to produce this figure for the test year, but
is able to do so for a different time period, please use the same time period
5
used to satisfy CLF-SC-3 and CLF-SC-4.
CLF-SC-6.
For the test year provided by the Company in this rate case, please provide (a.)
the Company's calculation of the cost of service (i.e., cost to serve) for each of
the following residential customers groups: residential customers whose
primary heating is 1. electric resistance, 2. natural gas, 3. delivered fuels (e.g.,
fuel oil, propane), and 4. other/unknown. Please also provide (b.) a detailed
description of the methodology used to develop these cost of service figures,
as well as all (c.) data sources, allocators, and assumptions used, in live
Microsoft Excel format with all formulae unlocked. If the Company does not
possess the information necessary to calculate the cost of service for any of
the four customer groups above, please explain in detail why not for each such
group. If the Company is unable to produce these figures for the test year, but
is able to do so for a different time period, please use the same time period
used to satisfy CLF-SC-3 and CLF-SC-4.
CLF-SC-7.
To the extent the Company is unable to provide the specific cost of service
data requested in CLF-SC-5 and/or CLF-SC-6 above for any heating source
category, please provide a detailed technical description of the methodology
the Company would use to calculate cost of service by heating source
category, if the Company were asked to do so. This description should be in
sufficient technical detail that a third party, given access to the underlying
source data, could independently replicate the analysis. Please identify:
a. what data sources would be needed (e.g., the Company's ECOSS
functionalized/classified costs and allocators, customer billing records, AMI
interval data, HVAC equipment or permit records, customer surveys,
appliance saturation studies, or similar);
b. whether the Company possesses that source data, and if not, who would
possess the data;
c. the specific analytical steps that would be required to convert that source data
into a cost of service figure for each heating source category.
CLF-SC-8.
Please provide the aggregate hourly (or, if hourly is not available, the finest
available sub-hourly interval, e.g., 15-minute or 30-minute) electric energy
usage (in kWh per interval), summed across all residential electric customers
with a heat pump as their primary heating source, for each hour (or interval)
of the test year in this proceeding. If interval or AMI data are not available for
that exact period, please provide data for the same twelve-month period used
to satisfy CLF-SC-3 through CLF-SC-6, and identify the period provided.
Monthly or less granular data will not satisfy this request; the resolution
requested is hourly or finer. Please provide this information in a machinereadable live Microsoft Excel or CSV format, with one row per
6
timestamp/interval and a labeled timestamp column (not a static image, PDF,
or pivoted/merged-cell table), together with a description of how the
underlying interval or AMI data were aggregated (e.g., whether the figures
reflect gross metered usage or are net of any behind-the-meter generation, and
how customers with incomplete interval data, if any, were treated). Please use
the same timestamp convention — including time zone, whether intervals are
labeled by interval-beginning or interval-ending, and treatment of daylight
saving time transitions — in this response and in the responses to CLF-SC-9
through 11 below, and identify that convention, so that the results can be
directly and unambiguously aligned and summed across heating source
categories, rate schedules, and total system load. If the Company does not
possess the information necessary to produce this aggregated load profile
(including because the Company cannot identify which customers have a heat
pump), please explain in detail why not.
CLF-SC-9.
For the same twelve-month period used to satisfy CLF-SC-3 through CLFSC-6, please provide the same aggregate hourly (or finest available interval)
electric energy usage, broken out separately for each of the following
remaining residential customer primary heating source categories:
a.
b.
c.
d.
electric resistance
natural gas
delivered fuels (e.g., fuel oil, propane)
other/unknown heating sources
If the Company does not possess the information necessary to produce
aggregated load profiles for any of the categories listed above (including
because the Company cannot identify which customers use natural gas,
delivered fuels, or other heating sources as their primary heating), please state
specifically which categories the Company is unable to provide, and explain
in detail why not for each category identified.
CLF-SC-10.
For the same period, resolution, timestamp convention, and machine-readable
Microsoft Excel or CSV format specified in CLF-SC-8 (i.e., the test year in
this proceeding, at hourly or finer resolution, with one row per
timestamp/interval), please provide the aggregate electric energy usage (in
kWh per interval), summed across all of the Company's electric customers,
across all customer classes (i.e., total system load). If the Company does not
possess the information needed to produce this aggregated load profile, please
explain in detail why not.
CLF-SC-11.
For the same period, resolution, timestamp convention, and machine-readable
Microsoft Excel or CSV format specified in CLF-SC-8, please provide the
same aggregate electric energy usage, broken out separately by rate
schedule/customer class, with each rate schedule's interval data aligned to the
same timestamps used in the preceding request so that the class-level results
can be summed interval-by-interval. Please identify each rate schedule
7
included in the response, and state whether the sum of the class-level results
reconciles, interval-by-interval, to the systemwide total provided in response
to the preceding request; if it does not reconcile, please explain the difference
in detail. If the Company does not possess the information needed to produce
the load profile for any rate schedule, please state specifically which
schedule(s) the Company is unable to provide, and explain in detail why not
for each.
CLF-SC-12.
For every feeder on the Company's electric distribution system, please provide
a table, in CSV format or in live Microsoft Excel format with all formulae
intact, containing the following information for each feeder as of the test year
in this proceeding:
a. a unique feeder identifier
b. the substation, and, if applicable, the specific substation transformer(s), that
supply the feeder
c. the feeder's nominal operating voltage class (e.g., 34.5 kV, 13.2 kV, or 4.16
kV)
d. the feeder's summer normal rating, in amps, kW, or MVA (whichever unit the
Company uses natively for feeder ratings)
e. the feeder's winter normal rating, in the same unit used in item 4 above
f. the total number of customers served by the feeder
g. the number of customers served by the feeder broken out by major customer
class (e.g., residential, small commercial, and large commercial/industrial)
h. the number of customers served by the feeder with heat pumps as their
primary heating type
If the Company does not possess the information to produce the data fields
requested above at the individual feeder level, please state specifically which
item(s) it is unable to provide, and explain in detail why not. If the Company
is not able to produce all of the items requested above for the test year, but is
able to do so for a different time period, please provide these figures for the
most recent time period available.
CLF-SC-13.
For each feeder identified in response to CLF-SC-12, please provide, in CSV
format or in the same live Microsoft Excel format:
a. the feeder's coincident summer peak demand and winter peak demand, in the
same unit used for the feeder's rating in response to CLF-SC-12 (amps, kW, or
MVA), for each of the three most recently completed calendar years (i.e., three
summer peaks and three winter peaks per feeder) and for the test year itself (if
test year is not contained within the three most recently completed calendar
years), together with the specific date and hour (or finest available timestamp)
at which each summer and winter peak occurred. These historical peaks
should reflect actual metered values, not weather-normalized estimates; if the
Company does not maintain actual metered peak demand at the individual
feeder level and is only able to provide weather-normalized historical peaks,
8
please state so explicitly and explain in detail why actual metered data is
unavailable at the feeder level.
b. the feeder's forecasted summer peak demand and winter peak demand, in the
same unit used in item a above, for each year of the Company's most recent
long-term feeder-level load forecast, together with the assumed month, day,
and hour (or hour range) at which the Company's forecasting model assumes
the coincident summer and winter peaks occur. Please also state the assumed
weather condition or percentile (e.g., 50/50 or 90/10 weather-normalized
design conditions) underlying the forecast provided. Please provide this
information with one row per feeder and one column per year (or,
equivalently, one row per feeder per year), broken out separately for summer
and winter.
If the Company does not possess the information needed to produce the
historical peaks and forecasted peaks itemized in this Request at the individual
feeder level, please state specifically which item(s) it is unable to provide, and
explain in detail why not.
The Company may provide the information requested in CLF-SC-12 and
CLF-SC-13 as two separate tables, or as a single combined table containing
both the feeder identifying/rating information described in CLF-SC-12 and the
peak demand information described in CLF-SC-13, joined on the unique
feeder identifier described in CLF-SC-12, item a, above; either format is
acceptable, provided that the items requested can be unambiguously matched
to the correct feeder.
CLF-SC-14.
For each feeder identified in CLF-SC-13, please provide:
a. whether the Company identifies the feeder as currently having an N-0 thermal
constraint (i.e., forecasted peak at or above 100% of its summer or winter
normal rating under N-0 conditions) or an N-1 contingency overload (i.e., a
circumstance in which restoring the feeder's load following a contingency
event would require a neighboring feeder to exceed its own emergency rating
for an excessive period of time, or equivalent definition used by the
Company), and, if possible, the load at which that constraint occurred.
b. whether the Company has flagged the feeder as having a forecasted N-0
thermal constraint or N-1 contingency overload during the time horizon of the
load forecast provided in CLF-SC-13, and, if possible, the load level at which
that constraint is expected to occur. If the Company only tracks the year in
which a particular constraint is first forecast to occur, rather than every year it
is expected to occur, please provide this information instead.
c. for any such constraint identified in items a. and b. above, the remediation
status the Company has assigned to it (e.g., identified/monitoring only, under
9
evaluation, planned, approved, in construction, or in-service); and
d. if a remediation has been identified or is underway, the type of remediation
involved, such as a temporary operational measure (e.g., switching, feeder
reconfiguration, or load transfer to a neighboring feeder or substation), a nonwires alternative (e.g., battery storage, demand response, or other noninfrastructure solution), or a capacity project (e.g., a new or upgraded feeder,
conductor or cable upgrade, or new or expanded substation or substation
transformer), together with the associated project identifier (if any) and
expected in-service date or estimated completion year.
If the Company tracks remediation status or project type using its own
categories or flags that do not map cleanly onto the categories above, please
instead provide the Company's own categories or flags, along with a brief
description of what each one means, rather than attempting to force the
Company's data into the categories listed above. If the Company does not
possess the information needed to produce the forecasted thermal constraints
and remediation status itemized in this Request at the individual feeder level,
please state specifically which item(s) it is unable to provide, and explain in
detail why not.
As with CLF-SC-12 and CLF-SC-13, the Company may provide the
information requested in this Request as a separate table, or as a single
combined table with the peak demand information described in CLF-SC-13,
joined on the unique feeder identifier described in CLF-SC-12, item a, above;
either format is acceptable, provided that the items requested can be
unambiguously matched to the correct feeder.
CLF-SC-15.
For each feeder identified in response to CLF-SC-12, please provide the
feeder's actual hourly metered loading or demand, in the same unit used for
the feeder's rating in response to CLF-SC-12 (amps, kW, or MVA), for each of
the three most recently completed calendar years (i.e., up to 8,760 hourly
values per feeder per year — 8,784 in a leap year — for each of the three
years). These historical values should reflect actual metered data specific to
that feeder, not weather-normalized, estimated, or "representative" values
(e.g., a representative load profile assigned to a class of similar feeders, rather
than telemetry recorded for that specific feeder).
If the Company's systems already possess this feeder-level load data preaggregated to hourly resolution, please provide that data as maintained, and
state whether each hourly value represents an interval average, an
instantaneous/snapshot reading, an interval maximum, or some other
convention used by the Company. If the Company does not already maintain
this data at hourly resolution and must newly aggregate it from a finerresolution source (e.g., SCADA data polled at a sub-hourly interval) in order
to respond to this request, please use the interval average — i.e., the average
metered demand over each clock-hour — as the aggregation convention. If the
10
Company does not possess the information necessary to produce hourly
metered loading at the individual feeder level for the full three-year period
(including because, for some or all feeders, the Company has only a
representative or archetype load profile rather than actual metered telemetry),
please provide whatever actual metered feeder-level data it does maintain and
for the longest available sub-period of those three calendar years, identify the
resolution and period provided, and explain in detail why the data isn't
available for all feeders or for the entire requested time period.
Please provide this information in a machine-readable live Microsoft Excel or
CSV format, with one row per feeder per timestamp/interval and a labeled
timestamp column (not a static image, PDF, or pivoted/merged-cell table),
together with the unique feeder identifier described in CLF-SC-12, item 1,
above, so that this data can be joined to the feeder-level information provided
in response to CLF-SC-12 and CLF-SC-13. Please use the same timestamp
convention — including time zone, whether intervals are labeled by intervalbeginning or interval-ending, and treatment of daylight saving time transitions
— as used in response to CLF-SC-8 above, and identify that convention. If the
Company does not possess the information necessary to produce this feederlevel hourly load data, please explain in detail why not.
CLF-SC-16.
For every substation transformer on the Company's electric distribution
system, please provide a table, in CSV format or in the same live Microsoft
Excel format, containing the following information for each substation
transformer as of the test year in this proceeding:
a.
b.
c.
d.
a unique transformer identifier
the substation at which the transformer is located
the transformer's nominal voltage class
the transformer's summer normal rating, in amps, kW, or MVA (whichever
unit the Company provides for the equivalent feeder data)
the transformer's winter normal rating, in the same unit used in item 4 above
the total number of customers served by the transformer
the number of customers served by the transformer broken out by major
customer class (e.g., residential, small commercial, and large
commercial/industrial)
the number of customers served by the transformer with heat pumps as their
primary heating type
e.
f.
g.
h.
If the Company does not maintain any of the items requested above at the
individual substation transformer level, please state specifically which item(s)
it is unable to provide, and explain in detail why not. If the Company is not
able to produce all of the items requested above for the test year, but is able to
do so for a different time period, please provide these figures for the most
recent time period available.
11
CLF-SC-17.
For each substation transformer identified in response to the CLF-SC-16,
please provide, in CSV format or in the same live Microsoft Excel format:
a. the transformer's coincident summer and winter peak loading, in the same unit
used for the transformer's rating in CLF-SC-16, for each of the three most
recently completed calendar years (i.e., three summer peaks and three winter
peaks per feeder) and for the test year itself (if test year is not contained
within three most recently completed calendar years), together with the
specific date and hour (or finest available timestamp) at which each summer
and winter peak occurred. These historical peaks should reflect actual metered
values, not weather-normalized estimates; if the Company does not maintain
actual metered peak demand at the individual substation transformer level and
is only able to provide weather-normalized historical peaks, please state so
explicitly and explain in detail why actual metered data is unavailable at the
substation transformer level.
b. the transformer's forecasted summer peak demand and winter peak demand, in
the same unit used in item a above, for each year of the Company's most
recent long-term substation-transformer-level load forecast, together with the
assumed month, day, and hour (or hour range) at which the Company's
forecasting model assumes the coincident summer and winter peaks occur.
Please also state the assumed weather condition or percentile (e.g., 50/50 or
90/10 weather-normalized design conditions) underlying the forecast
provided. Please provide this information with one row per transformer and
one column per year (or, equivalently, one row per transformer per year),
broken out separately for summer and winter.
If the Company does not possess the information needed to produce the
historical peaks and forecasted peaks itemized in this Request at the substation
transformer level, please state specifically which item(s) it is unable to
provide, and explain in detail why not.
As with CLF-SC-12 and CLF-SC-13, the Company may provide the
information requested in CLF-SC-16 and CLF-SC-17 as two separate tables,
or as a single combined table joined on the unique transformer identifier
described in CLF-SC-16; either format is acceptable, provided that the items
requested can be unambiguously matched to the correct transformer.
CLF-SC-18.
For each substation transformer identified in CLF-SC-17, please provide:
a. whether the Company identifies the substation transformer as currently having
an N-0 thermal constraint (i.e., forecasted peak at or above 100% of its
summer or winter normal rating under N-0 conditions) or an N-1 contingency
overload (i.e., a circumstance in which restoring the feeder's load following a
contingency event would require a neighboring feeder to exceed its own
emergency rating for an excessive period of time, or equivalent definition
used by the Company), and, if possible, the load at which that constraint
12
occurred.
b. whether the Company has flagged the substation transformer as having a
forecasted N-0 thermal constraint or N-1 contingency overload during the
time horizon of the load forecast provided in CLF-SC-13, and, if possible, the
load level at which that constraint is expected to occur. If the Company only
tracks the year in which a particular constraint is first forecast to occur, rather
than every year it is expected to occur, please provide this information instead.
c. for any such constraint identified in item a above, the remediation status the
Company has assigned to it (e.g., identified/monitoring only, under evaluation,
planned, approved, in construction, or in-service); and
d. if a remediation has been identified or is underway, the type of remediation
involved, such as a temporary operational measure (e.g., switching or load
transfer to a neighboring substation transformer or substation), a non-wires
alternative (e.g., battery storage, demand response, or other non-infrastructure
solution), or a capacity project (e.g., a new or upgraded substation
transformer, a new or expanded substation, or other infrastructure addition),
together with the associated project identifier (if any) and expected in-service
date or estimated completion year.
If the Company tracks remediation status or project type using its own
categories or flags that do not map cleanly onto the categories above, please
instead provide the Company's own categories or flags, along with a brief
description of what each one means, rather than attempting to force the
Company's data into the categories listed above. If the Company does not
possess the information needed to produce the forecasted thermal constraints
and remediation status itemized in this Request at the substation transformer
level, please state specifically which item(s) it is unable to provide, and
explain in detail why not.
As with CLF-SC-12 and CLF-SC-13, the Company may provide the
information requested in this Request as a separate table, or as a single
combined table with the peak demand information described in CLF-SC-17,
joined on the unique transformer identifier described in CLF-SC-16, item a,
above; either format is acceptable, provided that the items requested can be
unambiguously matched to the correct transformer.
CLF-SC-19.
For each substation transformer identified in response to CLF-SC-16 above,
please provide the transformer's actual hourly metered loading or demand, in
the same unit used for the transformer's rating in response to CLF-SC-16
(amps, kW, or MVA), for each of the three most recently completed calendar
years (i.e., up to 8,760 hourly values per transformer per year — 8,784 in a
leap year — for each of the three years). These historical values should reflect
actual metered data specific to that transformer, not weather-normalized,
estimated, or "representative" values (e.g., a representative load profile
13
assigned to a class of similar transformers, rather than telemetry recorded for
that specific transformer).
If the Company's systems already possess this transformer-level load data preaggregated to hourly resolution, please provide that data as maintained, and
state whether each hourly value represents an interval average, an
instantaneous/snapshot reading, an interval maximum, or some other
convention used by the Company. If the Company does not already maintain
this data at hourly resolution and must newly aggregate it from a finerresolution source (e.g., SCADA data polled at a sub-hourly interval) in order
to respond to this request, please use the interval average — i.e., the average
metered demand over each clock-hour — as the aggregation convention.
If the Company does not possess the information necessary to produce hourly
metered loading at the individual substation transformer level for the full
three-year period (including because, for some or all transformers, the
Company has only a representative or archetype load profile rather than actual
metered telemetry), please provide whatever actual metered transformer-level
data it does maintain and for the longest available sub-period of those three
calendar years, identify the resolution and period provided, and explain in
detail why the data isn't available for all transformers or for the entire
requested time period.
Please provide this information in a machine-readable live Microsoft Excel or
CSV format, with one row per transformer per timestamp/interval and a
labeled timestamp column (not a static image, PDF, or pivoted/merged-cell
table), together with the unique transformer identifier described in CLF-SC16, item 1, above, so that this data can be joined to the transformer-level
information provided in response to CLF-SC-16 and CLF-SC-17. Please use
the same timestamp convention — including time zone, whether intervals are
labeled by interval-beginning or interval-ending, and treatment of daylight
saving time transitions — as used in response to CLF-SC-8, and identify that
convention. If the Company does not possess the information necessary to
produce this transformer-level hourly load data, please explain in detail why
not.
CLF-SC-20.
For each feeder and substation transformer identified in response to CLF-SC12 through CLF-SC-19, to the extent the Company's feeder- and substation
transformer-level load forecasts separately model, or can isolate, the
incremental contribution of heat pump adoption to forecasted summer and
winter peak demand, please provide that incremental heat-pump contribution
(in the same units used in response to CLF-SC-13 and/or CLF-SC-17, as
applicable) by feeder / substation transformer, by year, for each year of the
Company's long-term forecast horizon. If the Company does not possess the
information to model or isolate the yearly contribution of heat pump adoption
to forecasted summer and winter peaks at either the feeder and/or substation
14
transformer levels, explain in detail why not, and describe in detail how heat
pump adoption impacts are incorporated into the forecasts, if at all.
15
CERTIFICATE OF SERVICE
This is to certify that on this 4th day of September, 2026, the foregoing document was filed with
the Public Utilities Regulatory Authority, and copies of the foregoing document were served
upon each person designated on the Authority’s official service list the applicable proceedings in
accordance with R.C.S.A. Section 16-1-15.
/s/ Sarah Krame
Sarah Krame, Esq.
Staff Attorney
Sierra Club Environmental Law Program
50 F St. NW, 8th Floor
Washington, DC 2000[phone removed]
[email removed]
16
As listed on the current system