STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-05-12
APPLICATION OF KEARSARGE STERLING, LLC FOR
QUALIFICATION OF 2 OLD PRINCETON ROAD
(SYSTEM 2), STERLING, MA AS A CLASS I
RENEWABLE ENERGY SOURCE
June 22, 2026
By the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Janice A. Beecher
Holly H. Cheeseman
Everett Smith, III
PROPOSED FINAL DECISION
This proposed final Decision is being distributed to the parties in this proceeding for comment. The
proposed Decision is not final. The Authority will consider the parties’ arguments and exceptions before
reaching a final Decision, which may differ from the proposed Decision. Therefore, this proposed Decision
does not establish any precedent and does not necessarily represent the Authority’s final conclusion.
PROPOSED FINAL DECISION
I.
INTRODUCTION
A.
SUMMARY
In this Decision, the Public Utilities Regulatory Authority determines that the
System 2 solar generation facility located at 2 Old Princeton Road in Sterling,
Massachusetts qualifies as a Class I renewable energy source.
B.
BACKGROUND OF THE PROCEEDING
By Application received May 27, 2026 (Application), Kearsarge Sterling, LLC
(Company) requests that the Public Utilities Regulatory Authority (Authority) determine
that the System 2 solar generation facility (Facility or Project) qualifies as a Class I
renewable energy source.
C.
CONDUCT OF THE PROCEEDING
There is no statutory requirement for a hearing, no person requested a hearing,
and none was held.
D.
PARTICIPANTS
The Authority recognized the following as Participants to this proceeding:
Kearsarge Sterling, LLC, 1380 Soldiers Field Road, Suite 3900, Boston, MA 02135; the
Office of Consumer Counsel, Ten Franklin Square, New Britain, CT 06051; and the
Commissioner of the Department of Energy and Environmental Protection, 79 Elm
Street, Hartford, CT 06106.
II.
STANDARD REVIEW
Pursuant to General Statutes § 16-1(a)(20), “Class I renewable energy source”
includes energy derived from solar power.
III.
AUTHORITY ANALYSIS
As provided in the Application, the Facility generates electricity using solar power.
The Project began commercial operation on December 22, 2025, and has an installed
capacity of 1.4 MW. The Facility's NEPOOL GIS Identification Number is NON229277.
The Project is a behind-the-meter generation facility located in Massachusetts, which is
within the control area of the ISO-NE. AlsoEnergy, Inc. is the third-party verifier of the
electricity produced.
Docket No. 26-05-12
IV.
Page 2
CONCLUSION
The Authority reviewed all information in the record and finds that pursuant to
General Statutes § 16-1(a)(20), the Facility qualifies as a Class I renewable energy
source, effective January 1, 2026. The Authority assigns the Facility Connecticut
Renewable Portfolio Standard Registration No. CT260512.
The Authority’s determination in this docket is based on the information
submitted by the Company. The Authority may reverse its ruling or revoke the
Company’s registration if any material information provided proves to be false or
misleading. The Company is reminded that it is obligated to notify the Authority within
10 days of any changes to any of the information it has provided.
DOCKET NO. 26-05-12
APPLICATION OF KEARSARGE STERLING, LLC FOR
QUALIFICATION OF 2 OLD PRINCETON ROAD
(SYSTEM 2), STERLING, MA AS A CLASS I
RENEWABLE ENERGY SOURCE
This Decision is adopted by the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Holly H. Cheeseman
Janice A. Beecher
Everett Smith, III
CERTIFICATE OF SERVICE
The foregoing is a true and correct copy of the Decision issued by the Public
Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail
to all parties of record in this proceeding on the date indicated.
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
May 6, 2026
Date
As listed on the current system
Draft Decision, 06/22/2026 [26-05-12]