Interrogatories
To GB II New Haven LLC, questions 20 thru 23
Files1
26-06-03 Interrogatories GBII Set1.pdf
PDF · 324 KB · 5 pagesText searchable
Download 26-06-03 Interrogatories GBII Set1.pdfRead the text of 26-06-03 Interrogatories GBII Set1.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
RE: GB II NEW HAVEN LLC
APPLICATION TO ESTABLISH
2027 REVENUE REQUIREMENTS
:
:
:
DOCKET NO. 26-06-03
JULY 8, 2026
THE OFFICE OF CONSUMER COUNSEL’S
FIRST SET OF INTERROGATORIES
The Office of Consumer Counsel (“OCC”) hereby requests responses from GB II New
Haven, LLC (“GB II”) to the following interrogatories in the above-captioned proceeding by July
22, 2026. If there are objections to any questions, or if providing responses to certain questions
would be unduly burdensome, please contact the undersigned counsel as soon as possible.
I. INSTRUCTIONS
The responses to these interrogatories and production requests must be submitted in the following
manner:
A.
Documents provided shall be complete and, unless privileged, unredacted, submitted
as found in the responding party’s files (e.g., documents that in their original condition
were stapled, clipped or otherwise fastened together or maintained in separate file
folders shall be produced in such form). The responding party may submit photocopies
(with color photocopies where necessary to accurately reproduce the document), in
lieu of original documents, provided that such copies are true, correct and complete
copies of the original documents.
B.
Documents submitted shall be produced in the order in which they appear in the
responding party’s files and shall not be shuffled or otherwise rearranged. Mark each
page with identification and consecutive document control numbers.
C.
Data must be produced in the data format in which it is typically used and maintained.
Moreover, to the extent a responsive document has been electronically scanned (for
any purpose), that document must be produced in a readable and accessible electronic
format, with the opportunity provided to review the original document.
D.
Provide English translations of all responsive documents that exist in a language other
than English.
E.
Documents to be produced include all documents in the possession, custody or control
of the responding party, wherever located, including documents in the possession,
custody or control of the responding party’s directors, officers, employees,
representatives or agents. Without limitation on the term “control,” a document is
deemed to be in a responding party’s control if it has the right to secure that document
or a copy thereof from another person.
CLAIMS OF PRIVILEGE
If you contend that any answer to any interrogatory or any document demanded by these
interrogatories is privileged in whole or in part, file with your response to these Interrogatories a
statement in writing and under oath and in such statement: (1) identify each such interrogatory
answer or document; (2) state its general subject matter; and (3) state in detail the basis for each
claim of privilege made with respect to it. If a claim of privilege is made to only a part of a
document, then in addition to the statement required herein, produce a public copy of such
document from which the alleged privileged portion has been redacted, noting where in the
document such redactions have been made.
SCOPE
If subsequent to your initial compliance with these interrogatories and production request you
discover additional or new material or information responsive to any interrogatory or request for
production, or you discover that any response you provide herein was totally or partially incorrect
or, though correction was made, is no longer true, you must promptly (a) file any additional
responsive documents that come into your possession, custody or control or (b) file supplemented,
corrected, and sworn responses. You are specifically directed to supplement, modify or correct
your responses to each of these interrogatories and production throughout until a final decision is
adopted by the Authority in this Docket.
II. INTERROGATORIES
Interrogatories OCC-1 through OCC-23 are directed to GB II:
OCC-1.
(Spare Parts) Provide an itemized list of what is contained in GB II’s Spare Parts
Inventory.
OCC-2.
(Spare Parts) Referring to GB II 2027 AFRR – Exhibits MB-3 through MB-8
spreadsheet, tab MB-4p2, row 14. How does GB II calculate the “Annual Rate on
(Over)/Under Collection”; explain the inputs. As applicable, provide all formulae
relied on.
OCC-3.
(Regulatory Fees) Referring to GB II 2027 AFRR – Exhibits MB-3 through MB-8
spreadsheet, tab MB-7p1 and p2. What is the regulatory operating compliance fee
listed on tab MB-7p1 and MB-7p2? Which regulatory entity is the fee associated
with and how is it estimated?
OCC-4.
(Variable O&M) Referring to GB II 2027 AFRR – Exhibit GB II-3 spreadsheet.
Provide support for the 2025 actual Variable O&M Expenses incurred.
OCC-5.
(Plant in Service) Referring to GB II 2027 AFRR – Exhibit GB II-2 spreadsheet, tab
Schedule B-2.1, row 31: Miscellaneous Equipment. What is the Miscellaneous
Equipment?
OCC-6.
(Cash Working Capital) Referring to GB II 2027 AFRR – Exhibit GB II-2
spreadsheet, tab Schedule B.4.0. Provide support for why GB II assumes 1/8 of
operation & maintenance expenses is the appropriate cash working capital number.
OCC-7.
(Book Life) Referring to GB II 2027 AFRR – Exhibit GB II-2 spreadsheet, tab WP
C-2.1, Notes section. Provide support for the assumed book lives. Did GB II utilize
the 1994 NARUC Public Utility Depreciation Practices when determining the book
lives?
OCC-8.
(Interconnection) Is GB II requesting recovery of interconnection fees related to
maintenance?
OCC-9.
(Interconnection) When did GB II stop recovery of interconnection fees related to
maintenance?
OCC-10.
(CPI-U Regional) Referring to GB II 2027 AFRR – Bruneau Testimony pages 25 and
26. Provide support for the CPI-U Regional percentages listed in the table.
OCC-11.
(Credit Rating) Provide the parent company’s latest available credit rating and
impact associated with the change, if any, include credit reports if available.
OCC-12.
(Procurement) Provide, or describe in detail, the procurement procedures for
procuring assets or services from vendors.
OCC-13.
(Procurement) With respect to the proposed new gas compressor transformer, how
was the $865,000 price from Rizzo Electric evaluated for reasonableness? What
specific cost components are included in the Rizzo proposal (labor, equipment
handling, testing, contingency, etc.)?
OCC-14.
(Procurement) Were other vendors solicited for this replacement? If so, how many
and what were their quotes/bids?
OCC-15.
(Lead Time) Referring to GB II 2027 AFRR – Reynolds Testimony page 3. Why did
GB II select a vendor with a lead time of 62 weeks?
OCC- 16. (Rizzo Electric) Provide all support for how GB II made the decision to select Rizzo
Electric.
OCC-17.
(Rizzo Electric) Referring to GB II 2027 AFRR – Reynolds Testimony page 3 and
Docket # 25-06-03 Interrogatory Response Exhibit OCC-2 spreadsheet. Is GB II
aware that Rizzo Electric is the most expensive and has the longest lead time to
complete the project of all new options listed? If yes, why were they selected?
OCC-19.
(Rizzo Electric) Referring to GB II 2027 AFRR – Reynolds Testimony page 3 and
Docket # 25-06-03 Interrogatory Response Exhibit RRU-29. Please state when GB II
first identified Rizzo Electric as a potential contractor for the transformer
replacement project. If Rizzo Electric was under consideration during preparation of
the New Transformer Replacement Plan, please explain why Rizzo Electric was not
identified or discussed in that Plan.
OCC-20.
(Rizzo Electric) Please identify any current or prior business, financial, contractual,
or other relationships between GB II and Rizzo Electric. If any such relationships
exist, please describe their nature and duration.
OCC-21.
(Rizzo Electric) Please state whether GB II identified or discussed Rizzo Electric in
Docket No. 25-06-03, GB II New Haven, LLC Application to Establish 2026
Revenue Requirements. If so, please identify each filing, testimony, exhibit, or other
document in which Rizzo Electric was referenced and describe the context of the
reference.
OCC-22.
(Gas Compressor replacement) What contingency plans exist if the Fortune Electric
unit delivery is delayed beyond Q4 2027?
OCC-23.
(Gas Compressor replacement) Does the “in-kind replacement” include identical
voltage, capacity, and specification, or are any upgrades or modifications being made
to the transformer?
Respectfully submitted,
CLAIRE E. COLEMAN
CONSUMER COUNSEL
By: /s/ Julie Lelek
Julie Lelek
Staff Attorney
Rory Apollonia
Utilities Examiner
CERTIFICATE OF SERVICE
I do hereby certify that on this day the foregoing document was filed with the
Public Utilities Regulatory Authority, and copies thereof were served upon each person
designated on the official service list in this proceeding in accordance with R.C.S.A. § 16-1-15.
Dated at New Britain, Connecticut this 8th day of July, 2026.
/s/Julie Lelek
Commissioner of the Superior Court
As listed on the current system
Interrogs from OCC to GB II New Haven LLC 20 thru 23-Issued 07/08/2026 [26-06-03]