To GB II New Haven LLC, questions 20 thru 23

Files1

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY RE: GB II NEW HAVEN LLC APPLICATION TO ESTABLISH 2027 REVENUE REQUIREMENTS : : : DOCKET NO. 26-06-03 JULY 8, 2026 THE OFFICE OF CONSUMER COUNSEL’S FIRST SET OF INTERROGATORIES The Office of Consumer Counsel (“OCC”) hereby requests responses from GB II New Haven, LLC (“GB II”) to the following interrogatories in the above-captioned proceeding by July 22, 2026. If there are objections to any questions, or if providing responses to certain questions would be unduly burdensome, please contact the undersigned counsel as soon as possible. I. INSTRUCTIONS The responses to these interrogatories and production requests must be submitted in the following manner: A. Documents provided shall be complete and, unless privileged, unredacted, submitted as found in the responding party’s files (e.g., documents that in their original condition were stapled, clipped or otherwise fastened together or maintained in separate file folders shall be produced in such form). The responding party may submit photocopies (with color photocopies where necessary to accurately reproduce the document), in lieu of original documents, provided that such copies are true, correct and complete copies of the original documents. B. Documents submitted shall be produced in the order in which they appear in the responding party’s files and shall not be shuffled or otherwise rearranged. Mark each page with identification and consecutive document control numbers. C. Data must be produced in the data format in which it is typically used and maintained. Moreover, to the extent a responsive document has been electronically scanned (for any purpose), that document must be produced in a readable and accessible electronic format, with the opportunity provided to review the original document. D. Provide English translations of all responsive documents that exist in a language other than English. E. Documents to be produced include all documents in the possession, custody or control of the responding party, wherever located, including documents in the possession, custody or control of the responding party’s directors, officers, employees, representatives or agents. Without limitation on the term “control,” a document is deemed to be in a responding party’s control if it has the right to secure that document or a copy thereof from another person. CLAIMS OF PRIVILEGE If you contend that any answer to any interrogatory or any document demanded by these interrogatories is privileged in whole or in part, file with your response to these Interrogatories a statement in writing and under oath and in such statement: (1) identify each such interrogatory answer or document; (2) state its general subject matter; and (3) state in detail the basis for each claim of privilege made with respect to it. If a claim of privilege is made to only a part of a document, then in addition to the statement required herein, produce a public copy of such document from which the alleged privileged portion has been redacted, noting where in the document such redactions have been made. SCOPE If subsequent to your initial compliance with these interrogatories and production request you discover additional or new material or information responsive to any interrogatory or request for production, or you discover that any response you provide herein was totally or partially incorrect or, though correction was made, is no longer true, you must promptly (a) file any additional responsive documents that come into your possession, custody or control or (b) file supplemented, corrected, and sworn responses. You are specifically directed to supplement, modify or correct your responses to each of these interrogatories and production throughout until a final decision is adopted by the Authority in this Docket. II. INTERROGATORIES Interrogatories OCC-1 through OCC-23 are directed to GB II: OCC-1. (Spare Parts) Provide an itemized list of what is contained in GB II’s Spare Parts Inventory. OCC-2. (Spare Parts) Referring to GB II 2027 AFRR – Exhibits MB-3 through MB-8 spreadsheet, tab MB-4p2, row 14. How does GB II calculate the “Annual Rate on (Over)/Under Collection”; explain the inputs. As applicable, provide all formulae relied on. OCC-3. (Regulatory Fees) Referring to GB II 2027 AFRR – Exhibits MB-3 through MB-8 spreadsheet, tab MB-7p1 and p2. What is the regulatory operating compliance fee listed on tab MB-7p1 and MB-7p2? Which regulatory entity is the fee associated with and how is it estimated? OCC-4. (Variable O&M) Referring to GB II 2027 AFRR – Exhibit GB II-3 spreadsheet. Provide support for the 2025 actual Variable O&M Expenses incurred. OCC-5. (Plant in Service) Referring to GB II 2027 AFRR – Exhibit GB II-2 spreadsheet, tab Schedule B-2.1, row 31: Miscellaneous Equipment. What is the Miscellaneous Equipment? OCC-6. (Cash Working Capital) Referring to GB II 2027 AFRR – Exhibit GB II-2 spreadsheet, tab Schedule B.4.0. Provide support for why GB II assumes 1/8 of operation & maintenance expenses is the appropriate cash working capital number. OCC-7. (Book Life) Referring to GB II 2027 AFRR – Exhibit GB II-2 spreadsheet, tab WP C-2.1, Notes section. Provide support for the assumed book lives. Did GB II utilize the 1994 NARUC Public Utility Depreciation Practices when determining the book lives? OCC-8. (Interconnection) Is GB II requesting recovery of interconnection fees related to maintenance? OCC-9. (Interconnection) When did GB II stop recovery of interconnection fees related to maintenance? OCC-10. (CPI-U Regional) Referring to GB II 2027 AFRR – Bruneau Testimony pages 25 and 26. Provide support for the CPI-U Regional percentages listed in the table. OCC-11. (Credit Rating) Provide the parent company’s latest available credit rating and impact associated with the change, if any, include credit reports if available. OCC-12. (Procurement) Provide, or describe in detail, the procurement procedures for procuring assets or services from vendors. OCC-13. (Procurement) With respect to the proposed new gas compressor transformer, how was the $865,000 price from Rizzo Electric evaluated for reasonableness? What specific cost components are included in the Rizzo proposal (labor, equipment handling, testing, contingency, etc.)? OCC-14. (Procurement) Were other vendors solicited for this replacement? If so, how many and what were their quotes/bids? OCC-15. (Lead Time) Referring to GB II 2027 AFRR – Reynolds Testimony page 3. Why did GB II select a vendor with a lead time of 62 weeks? OCC- 16. (Rizzo Electric) Provide all support for how GB II made the decision to select Rizzo Electric. OCC-17. (Rizzo Electric) Referring to GB II 2027 AFRR – Reynolds Testimony page 3 and Docket # 25-06-03 Interrogatory Response Exhibit OCC-2 spreadsheet. Is GB II aware that Rizzo Electric is the most expensive and has the longest lead time to complete the project of all new options listed? If yes, why were they selected? OCC-19. (Rizzo Electric) Referring to GB II 2027 AFRR – Reynolds Testimony page 3 and Docket # 25-06-03 Interrogatory Response Exhibit RRU-29. Please state when GB II first identified Rizzo Electric as a potential contractor for the transformer replacement project. If Rizzo Electric was under consideration during preparation of the New Transformer Replacement Plan, please explain why Rizzo Electric was not identified or discussed in that Plan. OCC-20. (Rizzo Electric) Please identify any current or prior business, financial, contractual, or other relationships between GB II and Rizzo Electric. If any such relationships exist, please describe their nature and duration. OCC-21. (Rizzo Electric) Please state whether GB II identified or discussed Rizzo Electric in Docket No. 25-06-03, GB II New Haven, LLC Application to Establish 2026 Revenue Requirements. If so, please identify each filing, testimony, exhibit, or other document in which Rizzo Electric was referenced and describe the context of the reference. OCC-22. (Gas Compressor replacement) What contingency plans exist if the Fortune Electric unit delivery is delayed beyond Q4 2027? OCC-23. (Gas Compressor replacement) Does the “in-kind replacement” include identical voltage, capacity, and specification, or are any upgrades or modifications being made to the transformer? Respectfully submitted, CLAIRE E. COLEMAN CONSUMER COUNSEL By: /s/ Julie Lelek Julie Lelek Staff Attorney Rory Apollonia Utilities Examiner CERTIFICATE OF SERVICE I do hereby certify that on this day the foregoing document was filed with the Public Utilities Regulatory Authority, and copies thereof were served upon each person designated on the official service list in this proceeding in accordance with R.C.S.A. § 16-1-15. Dated at New Britain, Connecticut this 8th day of July, 2026. /s/Julie Lelek Commissioner of the Superior Court

As listed on the current system

Interrogs from OCC to GB II New Haven LLC 20 thru 23-Issued 07/08/2026 [26-06-03]

This filing on the current system (opens in a new tab)