STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
RE: GB II LLC APPLICATION
TO ESTABLISH 2027 REVENUE
REQUIREMENTS
:
:
:
DOCKET NO. 26-06-03
SEPTEMBER 2, 2026
THE OFFICE OF CONSUMER COUNSEL’S
SECOND SET OF INTERROGATORIES
The Office of Consumer Counsel (“OCC”) hereby requests responses from GB II New
Haven, LLC (“GB II”) to the following interrogatories in the above-captioned proceeding by
September 16, 2026. If there are objections to any questions, or if providing responses to certain
questions would be unduly burdensome, please contact the undersigned counsel as soon as
possible.
I. INSTRUCTIONS
The responses to these interrogatories and production requests must be submitted in the following
manner:
1. Documents provided shall be complete and, unless privileged, unredacted, submitted as found
in the responding party’s files (e.g., documents that in their original condition were stapled,
clipped or otherwise fastened together or maintained in separate file folders shall be produced
in such form). The responding party may submit photocopies (with color photocopies where
necessary to accurately reproduce the document), in lieu of original documents, provided that
such copies are true, correct and complete copies of the original documents.
2. Documents submitted shall be produced in the order in which they appear in the responding
party’s files and shall not be shuffled or otherwise rearranged. Mark each page with
identification and consecutive document control numbers.
3. Data must be produced in the data format in which it is typically used and maintained.
Moreover, to the extent a responsive document has been electronically scanned (for any
purpose), that document must be produced in a readable and accessible electronic format, with
the opportunity provided to review the original document.
4. Provide English translations of all responsive documents that exist in a language other than
English.
5. Documents to be produced include all documents in the possession, custody or control of the
responding party, wherever located, including documents in the possession, custody or control
of the responding party’s directors, officers, employees, representatives or agents. Without
limitation on the term “control,” a document is deemed to be in a responding party’s control if
it has the right to secure that document or a copy thereof from another person.
CLAIMS OF PRIVILEGE
If you contend that any answer to any interrogatory or any document demanded by these
interrogatories is privileged in whole or in part, file with your response to these Interrogatories a
statement in writing and under oath and in such statement: (1) identify each such interrogatory
answer or document; (2) state its general subject matter; and (3) state in detail the basis for each
claim of privilege made with respect to it. If a claim of privilege is made to only a part of a
document, then in addition to the statement required herein, produce a public copy of such
document from which the alleged privileged portion has been redacted, noting where in the
document such redactions have been made.
SCOPE
If subsequent to your initial compliance with these interrogatories and production request you
discover additional or new material or information responsive to any interrogatory or request for
production, or you discover that any response you provide herein was totally or partially incorrect
or, though correction was made, is no longer true, you must promptly (a) file any additional
responsive documents that come into your possession, custody or control or (b) file supplemented,
corrected, and sworn responses. You are specifically directed to supplement, modify or correct
your responses to each of these interrogatories and production throughout until a final decision is
adopted by the Authority in this Docket.
II. INTERROGATORIES
Interrogatories OCC-24 through OCC-33 are directed to GB II.
OCC-24: According to the information provided in Exhibit OCC-12, at page 3, GB II is required
to obtain three sealed bids through a request for proposals (“RFP”) for a project of this size.
Exhibit OCC-12 further indicates that GB II is required to complete an evaluation template for
the bids and an award memorandum after selecting the winning bid. Please provide copies of: (1)
all bids solicited or received by GB II in connection with the transformer project; (2) the
completed bid evaluation template; and (3) the completed award memorandum.
OCC-25: Please provide a table identifying every project for which GB II has contracted with
Rizzo Electric during the past ten years. For each project, please provide the following
information:
a. The date the contract was awarded;
b. The date the project was completed, if applicable;
c. The total contract amount;
d. A description of the project;
e. Whether GB II solicited bids from other contractors for the project (Yes/No); and
f. If other bids were solicited, whether Rizzo Electric submitted the lowest-cost bid
(Yes/No).
OCC-26: Referring to OCC-13 Interrogatory, OCC-17 Interrogatory, and OCC-17 Interrogatory
Response. Why is the Company stating Rizzo Electric’s cost as $424,000 if the procurement
price is $865,000?
OCC-27: Referring to OCC-15 Interrogatory Response and Docket #25-06-03 Interrogatory
Response Exhibit OCC-2 spreadsheet: How did Rizzo Electric submit the most competitive unit
pricing among the disclosed options in the prior case if Rizzo Electric is the highest cost?
OCC-28: Referring to OCC-19 Interrogatory Response, Docket #25-06-03 Time Schedule, and
Docket 25-06-03 Transcript. Why was Rizzo Electric not discussed in the Docket 25-06-03
Hearing that occurred on October 30, 2025, if the Company was already in discussions with
them? OCC asked on page 49 of the transcript what is the difference between the five companies
the Company can contract with to get the new transformer.
OCC-29: Referring to OCC-19 Interrogatory Response and OCC-20 Interrogatory Response. If
Rizzo Electric has supported the New Haven site for 20 years, recently played a critical role in
removing and installing several large 4160V motors, and overall is a critical partner supporting
all phases of work than why was it not considered during planning for a New Transformer and
not included in the New Transformer Replacement Plan?
OCC-30: Referring to OCC-20 Interrogatory Response. When did Rizzo Electric remove and
install several large 4160V motors? Please provide Rizzo Electric’s bid and all other bid for that
project.
OCC-31: Docket 25-06-03 Transcript, page 58. Is it correct that the Company has never run
economically on natural gas?
OCC-32: Is it correct that the Company has only used the natural gas as a fuel source during
testing?
OCC-33: Why should ratepayers pay for the most expensive, longest lead time transformer for a
fuel source the Company has never run on?
Respectfully submitted,
CLAIRE E. COLEMAN
CONSUMER COUNSEL
By: /s/ Julie Lelek
Julie Lelek
Staff Attorney
Office of Consumer Counsel
10 Franklin Square
New Britain, CT 06051
CERTIFICATE OF SERVICE
I do hereby certify that on this day the foregoing document was filed with the
Public Utilities Regulatory Authority, and copies thereof were served upon each person
designated on the official service list in this proceeding in accordance with R.C.S.A. § 16-1-15.
Dated at New Britain, Connecticut this 2nd day of September 2026.
/s/Julie Lelek
Commissioner of the Superior Court
As listed on the current system
Interrogs from OCC to GB II New Haven LLC 24 thru 33-Issued 09/02/2026 [26-06-03]