STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-06-09
APPLICATION FOR CELLCO PARTNERSHIP DBA
VERIZON
WIRELESS
FOR
APPROVAL
OF
CONSTRUCTION
OF
SMALL
CELL
WIRELESS
FACILITIES IN THE PUBLIC RIGHT-OF-WAY – NHV
EROCK 310 CT
August 3, 2026
By the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Janice A. Beecher
Holly H. Cheeseman
Everett Smith, III
PROPOSED FINAL DECISION
This proposed final Decision is being distributed to the parties in this proceeding for comment. The
proposed Decision is not final. The Authority will consider the parties’ arguments and exceptions before
reaching a final Decision, which may differ from the proposed Decision. Therefore, this proposed Decision
does not establish any precedent and does not necessarily represent the Authority’s final conclusion.
PROPOSED FINAL DECISION
I.
INTRODUCTION
A.
SUMMARY
In this Decision, the Public Utilities Regulatory Authority grants approval of Cellco
Partnership d/b/a Verizon Wireless’s Application of a construction plan to install wireless
facilities within certain rights-of-way – NHV EROCK 310 CT.
B.
BACKGROUND OF THE PROCEEDING
On June 16, 2026, the Public Utilities Regulatory Authority (Authority or PURA)
received an application from Cellco Partnership d/b/a Verizon Wireless (Verizon or
Company), requesting that the Authority approve its construction plan to install a small
cell wireless telecommunications facility on a Utility Pole No. 414 located within the public
right-of-way (PROW) adjacent to 357 Whitney Avenue, New Haven, CT.
The Application was filed pursuant to pages 2-10 of the Authority’s Decision dated
June 2, 2017, in Docket No. 17-02-49, PURA Formalization of Small Cell Antenna
Applicant Processes and Procedures to Construct Facilities in Connecticut’s Public
Rights-of-Way (Small Cell Process Decision). The Company is a commercial mobile
radio service (CMRS) provider, as that term is described in 47 C.F.R. Part 20.
C.
CONDUCT OF THE PROCEEDING
There is no statutory requirement for a hearing, no person requested a hearing,
and none was held.
D.
PARTICIPANTS
The Authority recognized the following as Participants to this proceeding: Cellco
Partnership d/b/a Verizon Wireless, 20 Alexander Drive Road, Wallingford, CT 06492; the
Office of Education, Outreach, and Enforcement (EOE), Ten Franklin Square, New
Britain, CT 06051; the Office of Consumer Counsel (OCC), Ten Franklin Square, New
Britain, CT 06051; Claudia Groisman, 362 Whitney Avenue #2, New Haven, CT 06511;
and the Commissioner of the Department of Energy and Environmental Protection
(DEEP), 79 Elm Street, Hartford, CT 06106.
The proposed Facility is a small wireless telecommunications attachment on Utility
Pole No. 414 located within the public right-of-way adjacent to 579 Frogtown Road, 357
Whitney Avenue, New Haven, CT. The utility pole is owned by UI and The Southern New
England Telephone Company d/b/a Frontier Communications of Connecticut. The
Company has identified the Facility as NHV EROCK 310 CT. Verizon has entered into
master pole attachment agreements with the pole owners. The Company is undertaking
the project to “provide the general public, Cellco Partnership d/b/a Verizon Wireless
Docket No. 26-06-09
Page 2
("Cellco") customers and emergency service providers with enhanced and more reliable
wireless and data services near the Facility.” Application, p. 1.
II.
AUTHORITY ANALYSIS
A.
LEGAL STANDARD
General Statutes § 16-247h states:
The authority shall authorize any certified telecommunications provider to
install, maintain, operate, manage or control poles, wires, conduits or other
fixtures under or over any public highway or street for the provision of
telecommunications service authorized by section 16-247c, if such
installation, maintenance, operation, management or control is in the public
interest, which includes but is not limited to, facilitating the efficient
development and deployment of an advanced telecommunications
infrastructure, facilitating maximum network interoperability and
interconnectivity, and encouraging shared use of existing facilities and
cooperative development of new facilities where legally possible and
technically and economically feasible.
Under regulations promulgated by the Authority, “[n]o certified telecommunications
company shall install, maintain, operate, manage or control facilities under or over any
public highway or street for the provision of telecommunications service without the
approval of the [Authority].” Conn. Agencies Regs. § 16-247c-5(a).1 The Authority finds
that the Facility is in the public interest because it increases the capacity of the existing
telecommunications system and does not represent a threat to public health and safety.
Under General Statutes § 16-247h, the public interest is served by, among other things,
“facilitating the efficient development and deployment of an advanced
telecommunications infrastructure.”
The Company’s Application satisfies the
requirements of Conn. Agencies Regs. § 16-247c-5(b). In addition, Verizon submitted
evidence that the Facility will comply with Federal Communications Commission (FCC)
standards for radio frequency (RF) emissions.2 Consequently, the Facility is consistent
1 In its Decision dated April 27, 2011, in Docket No. 08-06-19RE01, DPUC Investigation into the Deployment
of Distributed Antenna Systems (DAS) in the Public Rights of Way in Connecticut – CPCN Requirement
(CMRS Decision), the Authority deemed CMRS providers to be certified telecommunications companies
for purposes of Conn. Gen. Stat. § 16-247h and Conn. Agencies Regs. § 16-247c-5. The Company is a
CMRS and, therefore, is not required to have a Certificate of Public Convenience and Necessity (CPCN)
to install facilities in the PROW.
2 In its Decision dated April 5, 2017, in Docket No. 16-07-45, Application of Cellco Partnership d/b/a Crown
Castle Wireless For Approval Of A Construction Plan To Install Wireless Facilities Within Certain Public
Rights-Of-Way - Stamford SC1 CT, the Authority determined that the FCC has the sole legal authority
for establishing and/or amending the radio frequency (RF) emissions limits for wireless
telecommunications equipment. The Authority also determined that 47 USC § 332(c) preempts the
states from regulating the placement, construction, or modification of personal wireless service facilities
based on the environmental effects of radio frequency emission to the extent that such facilities comply
with FCC regulations. Id., pp. 7 and 8.
Docket No. 26-06-09
Page 3
with the statutory language encouraging the efficient deployment of telecommunications
infrastructure as being in the public interest.
In addition to seeking Authority approval in accordance with General Statutes
§ 16-247h, applicants seeking to erect fixtures and apparatus in the PROW must also
obtain the consent of property owners adjoining the proposed installation. General
Statutes § 16-234(f). By letters dated March 19, 2026, the Company sought the consent
of all owners of property adjoining the proposed utility pole and provided notice to the City
of New Haven. In response to the Company’s notification, Verizon received an objection
to the proposed facility by Claudia Grossman, 362 Whitney Avenue #2, New Haven, CT
06511. Application, p. 2. Verizon informed the Authority that it did not receive any other
objection or request for a hearing from immediate adjoining property owners. The
Authority issued correspondence to Claudia Grossman on June 23, 2026, which required
her to notify PURA directly within 30 days of an objection. Grossman did not respond to
the Authority’s letter. The Authority, therefore, deems that all adjoining property owners
have consented to the construction as required by General Statutes § 16-234(f).
ORDERS FOR COMPANY
For Orders requiring a compliance filing, file an electronic version through the
PURA's website at www.ct.gov/pura. Submissions filed in compliance with the Authority’s
Order must be identified by all three of the following: Docket Number, Title and Order
Number.
1.
Prior to commencing construction of each Facility, the Company shall obtain pole
attachment licenses from the pole owners and acquire all other applicable state
and municipal permits.
2.
No later than ten days after the completion of construction of the Facility, Verizon
shall provide the actual date of completion of the construction. In the event final
construction deviates in any respect from that represented in this proceeding,
Verizon shall describe all such differences in the filing.
3.
No later than 60 days after the last date an antenna is in operation, the Company
shall remove the Facility from the utility pole. Within 15 business days of removal
of the Facility, the Company shall notify the Authority of their removal.
4.
No later than April 1, 2027, and annually thereafter, the Company shall submit an
annual report to the Connecticut Siting Council (CSC) identifying all small cell
facilities approved by the Authority and constructed by Verizon on a form
prescribed by the CSC, as required by General Statutes § 16-50ee(b).
5.
The approval to construct this Facility expires after 18 months of issuance of this
Decision, unless extended by the Authority for good cause, upon request by
Verizon.
DOCKET NO. 26-06-09
APPLICATION FOR CELLCO PARTNERSHIP D/B/A
VERIZON
WIRELESS
FOR
APPROVAL
OF
CONSTRUCTION SMALL CELL WIRELESS FACILITIES IN
THE PUBLIC RIGHTS-OF-WAY – NHV EROCK 310 CT
This Decision is adopted by the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Holly H. Cheeseman
Everett Smith, III
Janice A. Beecher
CERTIFICATE OF SERVICE
The foregoing is a true and correct copy of the Decision issued by the Public
Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail
to all parties of record in this proceeding on the date indicated.
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
Date
As listed on the current system
Draft Decision, 08/03/2026 [26-06-09]