Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files1

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY TEN FRANKLIN SQUARE NEW BRITAIN, CT 06051 DOCKET NO. 26-06-09 APPLICATION FOR CELLCO PARTNERSHIP DBA VERIZON WIRELESS FOR APPROVAL OF CONSTRUCTION OF SMALL CELL WIRELESS FACILITIES IN THE PUBLIC RIGHT-OF-WAY – NHV EROCK 310 CT August 3, 2026 By the following Commissioners: Thomas H. Wiehl David Arconti, Jr. Janice A. Beecher Holly H. Cheeseman Everett Smith, III PROPOSED FINAL DECISION This proposed final Decision is being distributed to the parties in this proceeding for comment. The proposed Decision is not final. The Authority will consider the parties’ arguments and exceptions before reaching a final Decision, which may differ from the proposed Decision. Therefore, this proposed Decision does not establish any precedent and does not necessarily represent the Authority’s final conclusion. PROPOSED FINAL DECISION I. INTRODUCTION A. SUMMARY In this Decision, the Public Utilities Regulatory Authority grants approval of Cellco Partnership d/b/a Verizon Wireless’s Application of a construction plan to install wireless facilities within certain rights-of-way – NHV EROCK 310 CT. B. BACKGROUND OF THE PROCEEDING On June 16, 2026, the Public Utilities Regulatory Authority (Authority or PURA) received an application from Cellco Partnership d/b/a Verizon Wireless (Verizon or Company), requesting that the Authority approve its construction plan to install a small cell wireless telecommunications facility on a Utility Pole No. 414 located within the public right-of-way (PROW) adjacent to 357 Whitney Avenue, New Haven, CT. The Application was filed pursuant to pages 2-10 of the Authority’s Decision dated June 2, 2017, in Docket No. 17-02-49, PURA Formalization of Small Cell Antenna Applicant Processes and Procedures to Construct Facilities in Connecticut’s Public Rights-of-Way (Small Cell Process Decision). The Company is a commercial mobile radio service (CMRS) provider, as that term is described in 47 C.F.R. Part 20. C. CONDUCT OF THE PROCEEDING There is no statutory requirement for a hearing, no person requested a hearing, and none was held. D. PARTICIPANTS The Authority recognized the following as Participants to this proceeding: Cellco Partnership d/b/a Verizon Wireless, 20 Alexander Drive Road, Wallingford, CT 06492; the Office of Education, Outreach, and Enforcement (EOE), Ten Franklin Square, New Britain, CT 06051; the Office of Consumer Counsel (OCC), Ten Franklin Square, New Britain, CT 06051; Claudia Groisman, 362 Whitney Avenue #2, New Haven, CT 06511; and the Commissioner of the Department of Energy and Environmental Protection (DEEP), 79 Elm Street, Hartford, CT 06106. The proposed Facility is a small wireless telecommunications attachment on Utility Pole No. 414 located within the public right-of-way adjacent to 579 Frogtown Road, 357 Whitney Avenue, New Haven, CT. The utility pole is owned by UI and The Southern New England Telephone Company d/b/a Frontier Communications of Connecticut. The Company has identified the Facility as NHV EROCK 310 CT. Verizon has entered into master pole attachment agreements with the pole owners. The Company is undertaking the project to “provide the general public, Cellco Partnership d/b/a Verizon Wireless Docket No. 26-06-09 Page 2 ("Cellco") customers and emergency service providers with enhanced and more reliable wireless and data services near the Facility.” Application, p. 1. II. AUTHORITY ANALYSIS A. LEGAL STANDARD General Statutes § 16-247h states: The authority shall authorize any certified telecommunications provider to install, maintain, operate, manage or control poles, wires, conduits or other fixtures under or over any public highway or street for the provision of telecommunications service authorized by section 16-247c, if such installation, maintenance, operation, management or control is in the public interest, which includes but is not limited to, facilitating the efficient development and deployment of an advanced telecommunications infrastructure, facilitating maximum network interoperability and interconnectivity, and encouraging shared use of existing facilities and cooperative development of new facilities where legally possible and technically and economically feasible. Under regulations promulgated by the Authority, “[n]o certified telecommunications company shall install, maintain, operate, manage or control facilities under or over any public highway or street for the provision of telecommunications service without the approval of the [Authority].” Conn. Agencies Regs. § 16-247c-5(a).1 The Authority finds that the Facility is in the public interest because it increases the capacity of the existing telecommunications system and does not represent a threat to public health and safety. Under General Statutes § 16-247h, the public interest is served by, among other things, “facilitating the efficient development and deployment of an advanced telecommunications infrastructure.” The Company’s Application satisfies the requirements of Conn. Agencies Regs. § 16-247c-5(b). In addition, Verizon submitted evidence that the Facility will comply with Federal Communications Commission (FCC) standards for radio frequency (RF) emissions.2 Consequently, the Facility is consistent 1 In its Decision dated April 27, 2011, in Docket No. 08-06-19RE01, DPUC Investigation into the Deployment of Distributed Antenna Systems (DAS) in the Public Rights of Way in Connecticut – CPCN Requirement (CMRS Decision), the Authority deemed CMRS providers to be certified telecommunications companies for purposes of Conn. Gen. Stat. § 16-247h and Conn. Agencies Regs. § 16-247c-5. The Company is a CMRS and, therefore, is not required to have a Certificate of Public Convenience and Necessity (CPCN) to install facilities in the PROW. 2 In its Decision dated April 5, 2017, in Docket No. 16-07-45, Application of Cellco Partnership d/b/a Crown Castle Wireless For Approval Of A Construction Plan To Install Wireless Facilities Within Certain Public Rights-Of-Way - Stamford SC1 CT, the Authority determined that the FCC has the sole legal authority for establishing and/or amending the radio frequency (RF) emissions limits for wireless telecommunications equipment. The Authority also determined that 47 USC § 332(c) preempts the states from regulating the placement, construction, or modification of personal wireless service facilities based on the environmental effects of radio frequency emission to the extent that such facilities comply with FCC regulations. Id., pp. 7 and 8. Docket No. 26-06-09 Page 3 with the statutory language encouraging the efficient deployment of telecommunications infrastructure as being in the public interest. In addition to seeking Authority approval in accordance with General Statutes § 16-247h, applicants seeking to erect fixtures and apparatus in the PROW must also obtain the consent of property owners adjoining the proposed installation. General Statutes § 16-234(f). By letters dated March 19, 2026, the Company sought the consent of all owners of property adjoining the proposed utility pole and provided notice to the City of New Haven. In response to the Company’s notification, Verizon received an objection to the proposed facility by Claudia Grossman, 362 Whitney Avenue #2, New Haven, CT 06511. Application, p. 2. Verizon informed the Authority that it did not receive any other objection or request for a hearing from immediate adjoining property owners. The Authority issued correspondence to Claudia Grossman on June 23, 2026, which required her to notify PURA directly within 30 days of an objection. Grossman did not respond to the Authority’s letter. The Authority, therefore, deems that all adjoining property owners have consented to the construction as required by General Statutes § 16-234(f). ORDERS FOR COMPANY For Orders requiring a compliance filing, file an electronic version through the PURA's website at www.ct.gov/pura. Submissions filed in compliance with the Authority’s Order must be identified by all three of the following: Docket Number, Title and Order Number. 1. Prior to commencing construction of each Facility, the Company shall obtain pole attachment licenses from the pole owners and acquire all other applicable state and municipal permits. 2. No later than ten days after the completion of construction of the Facility, Verizon shall provide the actual date of completion of the construction. In the event final construction deviates in any respect from that represented in this proceeding, Verizon shall describe all such differences in the filing. 3. No later than 60 days after the last date an antenna is in operation, the Company shall remove the Facility from the utility pole. Within 15 business days of removal of the Facility, the Company shall notify the Authority of their removal. 4. No later than April 1, 2027, and annually thereafter, the Company shall submit an annual report to the Connecticut Siting Council (CSC) identifying all small cell facilities approved by the Authority and constructed by Verizon on a form prescribed by the CSC, as required by General Statutes § 16-50ee(b). 5. The approval to construct this Facility expires after 18 months of issuance of this Decision, unless extended by the Authority for good cause, upon request by Verizon. DOCKET NO. 26-06-09 APPLICATION FOR CELLCO PARTNERSHIP D/B/A VERIZON WIRELESS FOR APPROVAL OF CONSTRUCTION SMALL CELL WIRELESS FACILITIES IN THE PUBLIC RIGHTS-OF-WAY – NHV EROCK 310 CT This Decision is adopted by the following Commissioners: Thomas H. Wiehl David Arconti, Jr. Holly H. Cheeseman Everett Smith, III Janice A. Beecher CERTIFICATE OF SERVICE The foregoing is a true and correct copy of the Decision issued by the Public Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail to all parties of record in this proceeding on the date indicated. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority Date

As listed on the current system

Draft Decision, 08/03/2026 [26-06-09]

This filing on the current system (opens in a new tab)