Files1
260618-072926.pdf
PDF · 173 KB · 4 pagesText searchable
Download 260618-072926.pdfRead the text of 260618-072926.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
TEN FRANKLIN SQUARE
NEW BRITAIN, CT 06051
DOCKET NO. 26-06-18
APPLICATION OF THE UNITED ILLUMINATING COMPANY
FOR QUALIFICATION OF RESIDENTIAL RENEWABLE
ENERGY SOLUTIONS (RRES) FACILITIES AS CLASS I
RENEWABLE ENERGY SOURCES - Q1 2026
July 29, 2026
By the following Commissioners:
Thomas H. Wiehl
David Arconti, Jr.
Janice A. Beecher
Holly H. Cheeseman
Everett Smith, III
DECISION
DECISION
I.
INTRODUCTION
A.
SUMMARY
In this Decision, the Public Utilities Regulatory Authority determines that the 725
Residential Renewable Energy Solutions Facilities located in Connecticut qualify as Class
I renewable energy sources.
B.
BACKGROUND OF THE PROCEEDING
By Application received June 26, 2026 (Application) and UI RRES (Residential
Renewable Energy Solutions) Eligible Q1 2026 Vintage spreadsheet (Spreadsheet)
attached, The United Illuminating Company (Company) requests that the Public Utilities
Regulatory Authority (Authority) determine that the 725 RRES facilities (RRES
Facilities/RRES Projects) qualify as Class I renewable energy sources.
C.
CONDUCT OF THE PROCEEDING
There is no statutory requirement for a hearing, no person requested a hearing,
and none was held.
D.
PARTICIPANTS
The Authority recognized the following as Participants to this proceeding: The
United Illuminating Company, 180 Marsh Hill Road, Orange, CT 06477; the Office of
Consumer Counsel, Ten Franklin Square, New Britain, CT 06051; and the Commissioner
of the Department of Energy and Environmental Protection, 79 Elm Street, Hartford, CT
06106.
II.
STANDARD REVIEW
Pursuant to General Statutes § 16-1(a)(20), “Class I renewable energy source”
includes energy derived from solar power.
III.
AUTHORITY ANALYSIS
As provided in the Application, the RRES Facilities generate electricity using solar
power and each began commercial operation on the dates listed on the Spreadsheet.
The RRES Projects have a total nameplate capacity of 5.717 MW.
The RRES Facilities’ NEPOOL GIS Identification Number is NON259899. The
RRES Projects are behind-the-meter generation facilities located in Connecticut and shall
be subject to audits by the Authority.
Docket No. 26-06-18
Page 2
The Company notes that the Application does not include signatures of generation
facility owners or property owners, as it requires completion of a Customer-Executed
Tariff Agreement for all projects enrolling the program. In addition, the agreements
contain requisite language indorsing that the Company has title to all Renewable Energy
Certificates (RECs) and any other tradable energy or environmental-related commodity
produced by or associated with the facility.
IV.
CONCLUSION
The Authority reviewed all information in the record and finds that pursuant to
General Statutes § 16-1(a)(20), the RRES Facilities qualify as Class I renewable energy
sources, effective the later of January 1, 2026, or each RRES Facilities’ corresponding
commercial operation date listed on the Spreadsheet. The Authority assigns the Facilities
Connecticut Renewable Portfolio Standard Registration No. CT260618.
The Authority’s determination in this docket is based on the information submitted
by the Company. The Authority may reverse its ruling or revoke the Company’s
registration if any material information provided proves to be false or misleading. The
Company is reminded that it is obligated to notify the Authority within 10 days of any
changes to any of the information it has provided. The Authority’s determination in this
docket applies only to the 725 RRES Facilities listed on the Spreadsheet.
DOCKET NO. 26-06-18
APPLICATION OF THE UNITED ILLUMINATING COMPANY
FOR QUALIFICATION OF RESIDENTIAL RENEWABLE
ENERGY SOLUTIONS (RRES) FACILITIES AS CLASS I
RENEWABLE ENERGY SOURCES - Q1 2026
This Decision is adopted by the following Commissioners:
Thomas H. Wiehl
Holly H. Cheeseman
David Arconti, Jr.
Janice A. Beecher
Everett Smith, III
CERTIFICATE OF SERVICE
The foregoing is a true and correct copy of the Decision issued by the Public
Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail
to all parties of record in this proceeding on the date indicated.
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
July 29, 2026
Date
As listed on the current system
Final Decision, 07/29/2026 [26-06-18]