Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Files1

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY TEN FRANKLIN SQUARE NEW BRITAIN, CT 06051 DOCKET NO. 26-07-04 APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY (CL&P) FOR QUALIFICATION OF SHARED CLEAN ENERGY FACILITIES (SCEF) AS CLASS I RENEWABLE ENERGY SOURCES – Q2 2026 August 12, 2026 By the following Commissioners: Thomas H. Wiehl David Arconti, Jr. Janice A. Beecher Holly H. Cheeseman Everett Smith, III DECISION DECISION I. INTRODUCTION A. SUMMARY In this Decision, the Public Utilities Regulatory Authority determines that the 4 Shared Clean Energy solar generation facilities located in Connecticut qualify as Class I renewable energy sources. B. BACKGROUND OF THE PROCEEDING By application received July 8, 2026 (Application) and spreadsheet labeled ES SCEF Q226 Worksheet (Spreadsheet), The Connecticut Light and Power Company d/b/a Eversource Energy (Company) requested that the Public Utilities Regulatory Authority (Authority) determine that the 4 Shared Clean Energy Facilities (SCEF) listed on the Spreadsheet and located in Connecticut qualify as Class I renewable energy sources. C. CONDUCT OF THE PROCEEDING There is no statutory requirement for a hearing, no person requested a hearing, and none was held. D. PARTICIPANTS The Authority recognized the following as Participants to this proceeding: The Connecticut Light and Power Company d/b/a Eversource Energy, 107 Selden Street, Berlin, CT 06037; the Office of Consumer Counsel, Ten Franklin Square, New Britain, CT 06051; and the Commissioner of the Department of Energy and Environmental Protection, 79 Elm Street, Hartford, CT 06106. II. STANDARD REVIEW Pursuant to § 16-1(a)(20) of the General Statutes (Conn. Gen. Stat.), “Class I renewable energy source” includes energy derived from solar power. III. AUTHORITY ANALYSIS As provided in the Application and the Spreadsheet, the SCEF generate electricity using solar power and each began commercial operation on its corresponding commercial operation date listed on the Spreadsheet. The SCEF have a total nameplate capacity of 16.974 MW. The SCEF’s aggregate New England Power Pool Generation Information System Identification Number (NEPOOL GIS ID No) is NON261466. The SCEF are behind-the-meter generation facilities located in Connecticut and shall be subject to audits by the Authority. Docket IV. No. 26-07-04 Page 2 CONCLUSION The Authority reviewed all information in the record and finds that pursuant to Conn. Gen. Stat. § 16-1(a)(20), the SCEF qualify as Class I renewable energy sources, effective the later of April 1, 2026, or each SCEF’s corresponding commercial operation date listed on the Spreadsheet. The Authority assigns the SCEF Connecticut Renewable Portfolio Standard Registration No. CT260704. The Authority’s determination in this docket is based on the information submitted by the Company. The Authority may reverse its ruling or revoke the Company’s registration if any material information provided proves to be false or misleading. The Company is reminded that it is obligated to notify the Authority within 10 days of any changes to any of the information it has provided. The Authority’s determination in this docket applies only to the 4 SCEF listed on the Spreadsheet. DOCKET NO. 26-07-04 APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY (CL&P) FOR QUALIFICATION OF SHARED CLEAN ENERGY FACILITIES (SCEF) AS CLASS I RENEWABLE ENERGY SOURCES – Q2 2026 This Decision is adopted by the following Commissioners: Thomas H. Wiehl Holly H. Cheeseman David Arconti, Jr. Janice A. Beecher Everett Smith, III CERTIFICATE OF SERVICE The foregoing is a true and correct copy of the Decision issued by the Public Utilities Regulatory Authority, State of Connecticut, and was forwarded by Certified Mail to all parties of record in this proceeding on the date indicated. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority August 12, 2026 Date

As listed on the current system

Final Decision, 08/12/2026 [26-07-04]

This filing on the current system (opens in a new tab)