Compliance Filing, Order No. 26
Order No. 26 Supplement
Files2
2026-06-15 UI Order No. 26 Supplement Cover Letter #26-08-02.pdf
PDF · 33 KB · 2 pagesText searchable
Download 2026-06-15 UI Order No. 26 Supplement Cover Letter #26-08-02.pdfRead the text of 2026-06-15 UI Order No. 26 Supplement Cover Letter #26-08-02.pdf
2026-06-15 UI Order No. 26 Supplement Attachment #26-08-02.xlsx
Excel · 11 KBText searchable
Download 2026-06-15 UI Order No. 26 Supplement Attachment #26-08-02.xlsxRead the text of 2026-06-15 UI Order No. 26 Supplement Attachment #26-08-02.xlsx
June 15, 2026
Mr. Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, CT 06051
Re:
Docket No. 26-08-02, Annual Residential Renewable Energy Solutions Program Review –
Year 5, Compliance with Order No. 26
Dear Mr. Gaudiosi,
Pursuant to the Public Utilities Regulatory Authority’s (“PURA” or the “Authority”) Final
Decision in Docket 25-08-02 (the “Year 5 Decision”) dated November 17, 2025, The United
Illuminating Company (“UI” or the “Company”) hereby submits this supplemental filing.
Order No. 26 of the Decision states:
No later than June 1, 2026, the EDCs shall file an update to CAE-4 as compliance in
Docket No. 26-08-02. In addition to the total number of RRES projects online without a
production meter installed broken down by solar installer, the EDCs shall also include the
number of third-party-owned and the number of customer-owned systems.
In compliance with the above, UI submitted Attachment 1, which contained known data from
PowerClerk and SAP specific to interconnection applications participating in the Residential
Renewable Energy Solutions (RRES) program without a production meter installed.
After the original submission, the Company conducted a thorough review. As a result, UI
determined its initial response to CAE-004 submission relied on PowerClerk interconnection
application data only, which did not fully align with operational system records. UI has adopted a
refined approach that utilizes SAP-based meter records, program participation indicators within
the customer information and billing systems, and PowerClerk interconnection project data. This
enhanced methodology is intended to provide a more accurate and complete representation of
RRES projects that are online without a production meter installed.
I hereby certify service of this filing upon all parties or intervenors of record in this proceeding.
Sincerely,
180 Marsh Hill Road, Orange, CT 06477
www.uinet.com
An equal opportunity employer
James Nitz
Manager, Regulatory Services
UIL Holdings Corporation
As Agent for The United Illuminating Company
180 Marsh Hill Road, Orange, CT 06477
www.uinet.com
An equal opportunity employer
As listed on the current system
Compliance Filings, 06/15/2026 [26-08-02] Order No.26 / Avangrid / Order No. 26 Supplement