Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Files2

August 1, 2026 Mr. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 26-08-02, Annual Residential Renewable Energy Solutions Program Review - Year 5 - Compliance, Order No. 13 Dear Mr. Gaudiosi, Pursuant the Public Utilities Regulatory Authority’s (“PURA” or the “Authority”) December 17, 2025 Decision in Docket No. 25-08-02, The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource”) hereby provides this compliance filing. Specifically, Order No. 13 states: Reference Year 2 Decision, Order No. 17, p. 36: No later than May 1, 2023, and quarterly thereafter for the remainder of the RRES Program, the EDCs shall submit information for the prior quarter (e.g., January 1, 2023 through March 31, 2023 for the May 1, 2023 filing) on the following items related to RRES Program applications: (1) the length of time from application to submission to tariff review approval; (2) the length of time from tariff review approval to interconnection contingent approval; (3) the length of time to receive the work order number needed to apply for permits from cities and towns; (4) the length of time to process payments when applicable; (5) the length of time for any applicable witness tests; (6) the number of days between when the utility is notified of a completed inspection to meter installation; and, (6) the length of time for final issuance of the permission to operate. The RRES APWG may recommend additions to this list in their final report filed on December 14, 2022. Such filings shall be submitted in the relevant RRES Program review docket (e.g., any updates related to Year 2 of the RRES Program shall be disclosed in this proceeding, Docket No. 22-08-02). In compliance with the above, Eversource submits Attachment 1, which contains data specific to interconnection applications that have applied for Residential Renewable Energy Solutions (RRES) and have been processed in the second quarter of 2026. Attachment 1 includes the timelines outlined in Order No. 13 which Eversource records associated timestamps for, as well as additional metrics Eversource calculates to support RRES program operations. In the event of any questions, please do not hesitate to contact the undersigned counsel. Respectfully submitted, The Connecticut Light and Power Company d/b/a Eversource Energy Vincent P. Pace Vincent P. Pace Assistant General Counsel Eversource Energy P.O. Box 270 Hartford, CT 06141-0270 E: [email removed] Its Attorney

As listed on the current system

Compliance Filings, 07/28/2026 [26-08-02] Order No.NO 13 / Eversource Energy / Compliance Filing

This filing on the current system (opens in a new tab)