August 1, 2026
Mr. Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, CT 06051
Re: Docket No. 26-08-02, Annual Residential Renewable Energy Solutions Program Review
- Year 5 - Compliance, Order No. 13
Dear Mr. Gaudiosi,
Pursuant the Public Utilities Regulatory Authority’s (“PURA” or the “Authority”) December 17,
2025 Decision in Docket No. 25-08-02, The Connecticut Light and Power Company d/b/a
Eversource Energy (“Eversource”) hereby provides this compliance filing.
Specifically, Order No. 13 states:
Reference Year 2 Decision, Order No. 17, p. 36: No later than May 1, 2023, and
quarterly thereafter for the remainder of the RRES Program, the EDCs shall submit
information for the prior quarter (e.g., January 1, 2023 through March 31, 2023 for
the May 1, 2023 filing) on the following items related to RRES Program
applications: (1) the length of time from application to submission to tariff review
approval; (2) the length of time from tariff review approval to interconnection
contingent approval; (3) the length of time to receive the work order number needed
to apply for permits from cities and towns; (4) the length of time to process payments
when applicable; (5) the length of time for any applicable witness tests; (6) the
number of days between when the utility is notified of a completed inspection to
meter installation; and, (6) the length of time for final issuance of the permission to
operate. The RRES APWG may recommend additions to this list in their final report
filed on December 14, 2022. Such filings shall be submitted in the relevant RRES
Program review docket (e.g., any updates related to Year 2 of the RRES Program
shall be disclosed in this proceeding, Docket No. 22-08-02).
In compliance with the above, Eversource submits Attachment 1, which contains data specific to
interconnection applications that have applied for Residential Renewable Energy Solutions
(RRES) and have been processed in the second quarter of 2026. Attachment 1 includes the
timelines outlined in Order No. 13 which Eversource records associated timestamps for, as well
as additional metrics Eversource calculates to support RRES program operations.
In the event of any questions, please do not hesitate to contact the undersigned counsel.
Respectfully submitted,
The Connecticut Light and Power Company
d/b/a Eversource Energy
Vincent P. Pace
Vincent P. Pace
Assistant General Counsel
Eversource Energy
P.O. Box 270
Hartford, CT 06141-0270
E: [email removed]
Its Attorney
As listed on the current system
Compliance Filings, 07/28/2026 [26-08-02] Order No.NO 13 / Eversource Energy / Compliance Filing