Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Confidential will be sent via SharePoint to PURA today

Files5

August 3, 2026 Mr. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 26-08-02, Annual Residential Renewable Energy Tariff Program Review and Rate Setting – Year 6 - Compliance, Order No. 10. Dear Mr. Gaudiosi, Pursuant to Order No. 10 of the Public Utilities Regulatory Authority’s (“PURA” or the “Authority”) December 17, 2025 Decision in Docket No. 25-08-02, The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource”) hereby provides this compliance filing. Specifically, Order No.10 states: No later than August 1, 2023, and annually thereafter, the EDCs shall file as compliance documentation of the distribution of the incentive adders to validate that the required percentage of the benefit was received by the tenants in multifamily affordable houses in the previous year (e.g., calendar year 2022 for the August 1, 2023 filing), for both the cases of on-bill credits for individually metered units and annual checks or other approved distribution methodology for those multifamily homes where units are not individually metered. In compliance with Order No. 10, Eversource submits the following Attachments in redacted and confidential versions: 1. Attachment 1: Application forms for individually metered projects that received Permission to Operate in 2025 or 2024 indicating only 80% of the incentive is received as a quarterly cash payment or on the host billing account. The remaining 20% is allocated to tenants. The application form as generated in PowerClerk included only the percentages for the cash or host account on-bill portions as applicable to all RRES applications, but is being amended for individually-metered Multi-Family Affordable Housing applications to include the tenant allocation percentage as well. The tenant allocation percentage was collected as an applicant-input field for all projects. 2. Attachment 2: PowerClerk export of the applicant-inputted percentage fields for individually metered applications, confirming 20% to tenants for all applications. 3. Attachment 3: Benefit-sharing plan documentation for master-metered projects that received PTO in 2025. While six applications for master-metered projects received PTO, all six were different interconnection points at a single eligible property, so the same tenant benefit sharing plan was submitted for all six applications. In the event of any questions, please do not hesitate to contact the undersigned counsel. We hereby certify service of this filing upon all parties and intervenors of record on this proceeding Respectfully submitted, The Connecticut Light and Power Company d/b/a Eversource Energy Vincent P. Pace Vincent P. Pace, Esq. Assistant General Counsel Eversource Energy P.O. Box 270 Hartford, CT 06141-0270 Email: [email removed]

As listed on the current system

Compliance Filings, 08/03/2026 [26-08-02] Order No.No 10 / Eversource Energy / Confidential will be sent via SharePoint to PURA today

This filing on the current system (opens in a new tab)