Technical Meeting Presentation
Filed by Avangrid
Part of
Annual Residential Renewable Energy Solutions Program Review and Rate Setting - Year 6
- Type of filing
- Correspondence
- Date filed
- August 13, 2026
- Filed by
- Avangrid
- Files
- 1
As listed on the current system
Corres. 08/13/2026 [26-08-02] (Avangrid) - Technical Meeting Presentation
Files1
2026-08-13 Technical Meeting Presentation 2026-08-18 #26-08-02.pdf
PDF · 1.4 MB · 26 pagesText searchable
Download 2026-08-13 Technical Meeting Presentation 2026-08-18 #26-08-02.pdfRead the text of 2026-08-13 Technical Meeting Presentation 2026-08-18 #26-08-02.pdf
DOCKET 26-08-02 ANNUAL RESIDENTIAL
RENEWABLE ENERGY SOLUTIONS
PROGRAM REVIEW – YEAR 6
Topics for Technical Meeting Docket 26-08-02
1. RRES program application and deployment levels by month through
June 2026, including an analysis of low-income and distressed municipality
participation
2. RRES interconnection application and approval timelines (Order No. 13
compliance)
3. Summary of Written Comment Topics
–
–
–
Rate Setting
Contractor Compliance Working Group Report and contractor compliance requirements
Solar production measurement for DC-coupled solar and storage systems
4. Proposed Program Documents and Fees
5. Additional Comments
Application and Deployment Levels
January 2022 – June 2026
2022-2026 RRES Solar Deployment Levels – Eversource
Applications Received January 2022 - June 2026
Total AC Capacity: 484.9 MW
Total #: 58,581
Data from Order 12, 7/15/26
2022-2026 RRES Solar Deployment Levels – UI
Applications Received January 2022 – June 2026
Total AC Capacity: 106 MW
Total #: 13,616
Data from Order 12, 7/15/26
2022-2026 RRES Solar Deployment Levels – Eversource
Systems Deployed January 2022 - June 2026
Total AC Capacity: 384.9 MW
Total #: 47,086
Data from Order 12, 7/15/26
2022-2026 RRES Solar Deployment Levels – UI
Systems Deployed January 2022 – June 2026
Total AC Capacity: 72 MW
Total #: 9,401
Data from Order 12, 7/15/26
2022-2025 RRES Solar Deployment Levels – Eversource
Low Income and Distressed Municipality Participation
Jan. 2022 - June 2026
DM Total AC Capacity: 66.6 MW
DM Total #: 9,542
LI Total AC Capacity: 16.4 MW
LI Total #: 2,058
Data from Order 12, 7/15/26
2022-2025 RRES Solar Deployment Levels – UI
Low Income and Distressed Municipality Participation
Jan. 2022 – June 2026
DM Total AC Capacity: 24.69 MW
DM Total #: 3,174
LI Total AC Capacity: 3.28 MW
LI Total #: 421
Data from Order 12, 7/15/26
RRES Interconnection Application and
Approval Timelines
Eversource RRES Interconnection Application and Approval Timelines
Milestones
Average Business Days
Apr. 2026
May 2026
Jun. 2026
Tariff review time only
7
8
8
Full timeline1
8
8
8
8
5
6
Applications not requiring in-field corrections
12
11
9
Applications requiring in-field corrections
52
51
46
4
3
4
Application submission to tariff review approval
Tariff review approval to interconnection conditional approval and
work order issuance2
Utility notification of completed inspection to meter installation
Meter installation to issuance of the permission to operate
Data from Order 13, 08/01/26
UI RRES interconnection application and approval timelines *
Data from Order 13, 07/26/26
Summary of Topics from Written
Comments Filed May 28, 2026
Rate Setting
▪
Average upfront installed system cost ($/watt DC) year over year:
Eversource
UI
▪
▪
▪
2022
$3.86
N/A
2023
$3.88
$3.56
2024
$3.68
$4.65
2025
$3.71
$2.78
2026 Q1
$3.69
$3.33
ITC not expected to be available to residential PV owners in 2027.
EDCs do not collect estimated or actual O&M costs.
The EDCs calculated the average capacity factor specific to RRES solar
photovoltaic systems in Connecticut to be around 11% (calculated with DC
system size).
Contractor Compliance Working Group Report and Contractor
Compliance Requirements
▪
▪
▪
The EDCs support implementing consensus recommendations from the
Contractor Compliance Working Group Report
The EDCs recommend the standardized starting utility rates be based on
historical utility rates rather than third-party supplier rates.
The Contractor Compliance Working Group Report did not include
recommendations specific to customers on the Low-Income Discount
Rate (LIDR). The EDCs recommend PURA consider standards specific to
this customer segment, to avoid presenting LIDR customers with
unrealistic estimated savings. The EDCs will file further comments on this
in response to Interrogatory CAE-022.
Solar Production Measurement for DC-Coupled Solar and Storage
Systems
Solar Production Measurement for DC-Coupled Solar and Storage
Systems
Solar Production Measurement for DC-Coupled Solar and Storage
Systems
Solar Production Measurement for DC-Coupled Solar and Storage
Systems
Solar Production Measurement for DC-Coupled Solar and Storage
Systems
Proposed Program Document and Fee
Changes Filed August 1, 2026
Proposed 2027 Document and Fee Changes
▪ The EDCs proposed minimal changes to the program documents in the August 1,
2026 Filings. The key changes proposed include:
▪ Customer disclosure form edits as recommended by the Contractor Compliance
Working Group Report.
▪ Eversource proposed no changes to the Application Fee or Meter Fee from 2026 to
2027. The unchanged fee amounts are:
▪ Application Fee: $163
▪ Meter Fee: $183 (Form 2S Bridge) or $234 (Form 12S Bridge)
▪ UI proposed changes to the Application Fee and Meter Fee from 2026 to 2027. The
proposed fee amounts are:
▪ Application Fee: $240
▪ Meter Fee: $358
Additional Comments
Skipped Production Meters Progress
▪ Skipped production meter installations are still ongoing, with about one quarter in
Eversource’s territory still needing to be installed.
▪ Of projects still needing a production meter, the majority are awaiting the
municipal inspection.
▪ Net financial impact is minimal, but delays impact customer experience and
efficiency of payment processing.
▪ Approximately half of the remaining projects are customer-owned
Eversource
Total Online without a
Production Meter
Number that have
received a Production
Meter
Percent of Total
5,679
4,032
71%
Data as of 8/12/26
Multi-Family Affordable Housing (MFAH) Siting Requirements
▪ Current MFAH eligibility rules allow system sizing up to either historical
usage levels or 9 kW AC per unit (if historical data is not available), plus
electrification measures
▪ In addition, the current rules do not specify requirements for system siting
within the eligible property
▪ For some eligible properties, current rules may allow for large,
commercial-scale, ground-mounted systems to receive the RRES Buy-all
incentive rate plus the income-eligible adder, totaling $0.3839/kWh for
2026. In some cases these systems could be sited entirely separate from
the existing building electric service while still on the eligible property.
▪ The EDCs recommend PURA consider whether adjustments to current
RRES rules or a differentiated MFAH RRES rate may be necessary to
balance program benefits with ratepayer costs
RRES Contact Information
United Illuminating:
▪ Alexandra Torrealba,
[email removed]
▪ res.renewableenergysolutions
@uinet.com
Eversource:
▪ Julia Danahy,
[email removed]