Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

Technical Meeting Presentation

Correspondence

Filed by Avangrid

Part of

Annual Residential Renewable Energy Solutions Program Review and Rate Setting - Year 6

Type of filing
Correspondence
Date filed
August 13, 2026
Filed by
Avangrid
Files
1

As listed on the current system

Corres. 08/13/2026 [26-08-02] (Avangrid) - Technical Meeting Presentation

This filing on the current system (opens in a new tab)

Files1

DOCKET 26-08-02 ANNUAL RESIDENTIAL RENEWABLE ENERGY SOLUTIONS PROGRAM REVIEW – YEAR 6 Topics for Technical Meeting Docket 26-08-02 1. RRES program application and deployment levels by month through June 2026, including an analysis of low-income and distressed municipality participation 2. RRES interconnection application and approval timelines (Order No. 13 compliance) 3. Summary of Written Comment Topics – – – Rate Setting Contractor Compliance Working Group Report and contractor compliance requirements Solar production measurement for DC-coupled solar and storage systems 4. Proposed Program Documents and Fees 5. Additional Comments Application and Deployment Levels January 2022 – June 2026 2022-2026 RRES Solar Deployment Levels – Eversource Applications Received January 2022 - June 2026 Total AC Capacity: 484.9 MW Total #: 58,581 Data from Order 12, 7/15/26 2022-2026 RRES Solar Deployment Levels – UI Applications Received January 2022 – June 2026 Total AC Capacity: 106 MW Total #: 13,616 Data from Order 12, 7/15/26 2022-2026 RRES Solar Deployment Levels – Eversource Systems Deployed January 2022 - June 2026 Total AC Capacity: 384.9 MW Total #: 47,086 Data from Order 12, 7/15/26 2022-2026 RRES Solar Deployment Levels – UI Systems Deployed January 2022 – June 2026 Total AC Capacity: 72 MW Total #: 9,401 Data from Order 12, 7/15/26 2022-2025 RRES Solar Deployment Levels – Eversource Low Income and Distressed Municipality Participation Jan. 2022 - June 2026 DM Total AC Capacity: 66.6 MW DM Total #: 9,542 LI Total AC Capacity: 16.4 MW LI Total #: 2,058 Data from Order 12, 7/15/26 2022-2025 RRES Solar Deployment Levels – UI Low Income and Distressed Municipality Participation Jan. 2022 – June 2026 DM Total AC Capacity: 24.69 MW DM Total #: 3,174 LI Total AC Capacity: 3.28 MW LI Total #: 421 Data from Order 12, 7/15/26 RRES Interconnection Application and Approval Timelines Eversource RRES Interconnection Application and Approval Timelines Milestones Average Business Days Apr. 2026 May 2026 Jun. 2026 Tariff review time only 7 8 8 Full timeline1 8 8 8 8 5 6 Applications not requiring in-field corrections 12 11 9 Applications requiring in-field corrections 52 51 46 4 3 4 Application submission to tariff review approval Tariff review approval to interconnection conditional approval and work order issuance2 Utility notification of completed inspection to meter installation Meter installation to issuance of the permission to operate Data from Order 13, 08/01/26 UI RRES interconnection application and approval timelines * Data from Order 13, 07/26/26 Summary of Topics from Written Comments Filed May 28, 2026 Rate Setting ▪ Average upfront installed system cost ($/watt DC) year over year: Eversource UI ▪ ▪ ▪ 2022 $3.86 N/A 2023 $3.88 $3.56 2024 $3.68 $4.65 2025 $3.71 $2.78 2026 Q1 $3.69 $3.33 ITC not expected to be available to residential PV owners in 2027. EDCs do not collect estimated or actual O&M costs. The EDCs calculated the average capacity factor specific to RRES solar photovoltaic systems in Connecticut to be around 11% (calculated with DC system size). Contractor Compliance Working Group Report and Contractor Compliance Requirements ▪ ▪ ▪ The EDCs support implementing consensus recommendations from the Contractor Compliance Working Group Report The EDCs recommend the standardized starting utility rates be based on historical utility rates rather than third-party supplier rates. The Contractor Compliance Working Group Report did not include recommendations specific to customers on the Low-Income Discount Rate (LIDR). The EDCs recommend PURA consider standards specific to this customer segment, to avoid presenting LIDR customers with unrealistic estimated savings. The EDCs will file further comments on this in response to Interrogatory CAE-022. Solar Production Measurement for DC-Coupled Solar and Storage Systems Solar Production Measurement for DC-Coupled Solar and Storage Systems Solar Production Measurement for DC-Coupled Solar and Storage Systems Solar Production Measurement for DC-Coupled Solar and Storage Systems Solar Production Measurement for DC-Coupled Solar and Storage Systems Proposed Program Document and Fee Changes Filed August 1, 2026 Proposed 2027 Document and Fee Changes ▪ The EDCs proposed minimal changes to the program documents in the August 1, 2026 Filings. The key changes proposed include: ▪ Customer disclosure form edits as recommended by the Contractor Compliance Working Group Report. ▪ Eversource proposed no changes to the Application Fee or Meter Fee from 2026 to 2027. The unchanged fee amounts are: ▪ Application Fee: $163 ▪ Meter Fee: $183 (Form 2S Bridge) or $234 (Form 12S Bridge) ▪ UI proposed changes to the Application Fee and Meter Fee from 2026 to 2027. The proposed fee amounts are: ▪ Application Fee: $240 ▪ Meter Fee: $358 Additional Comments Skipped Production Meters Progress ▪ Skipped production meter installations are still ongoing, with about one quarter in Eversource’s territory still needing to be installed. ▪ Of projects still needing a production meter, the majority are awaiting the municipal inspection. ▪ Net financial impact is minimal, but delays impact customer experience and efficiency of payment processing. ▪ Approximately half of the remaining projects are customer-owned Eversource Total Online without a Production Meter Number that have received a Production Meter Percent of Total 5,679 4,032 71% Data as of 8/12/26 Multi-Family Affordable Housing (MFAH) Siting Requirements ▪ Current MFAH eligibility rules allow system sizing up to either historical usage levels or 9 kW AC per unit (if historical data is not available), plus electrification measures ▪ In addition, the current rules do not specify requirements for system siting within the eligible property ▪ For some eligible properties, current rules may allow for large, commercial-scale, ground-mounted systems to receive the RRES Buy-all incentive rate plus the income-eligible adder, totaling $0.3839/kWh for 2026. In some cases these systems could be sited entirely separate from the existing building electric service while still on the eligible property. ▪ The EDCs recommend PURA consider whether adjustments to current RRES rules or a differentiated MFAH RRES rate may be necessary to balance program benefits with ratepayer costs RRES Contact Information United Illuminating: ▪ Alexandra Torrealba, [email removed] ▪ res.renewableenergysolutions @uinet.com Eversource: ▪ Julia Danahy, [email removed]