STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
ANNUAL RESIDENTIAL RENEWABLE
ENERGY
SOLUTIONS
PROGRAM :
REVIEW AND RATE SETTING - YEAR 6 :
DOCKET NO. 26-08-02
MAY 28, 2026
WRITTEN COMMENTS OF THE UNITED ILLUMINATING COMPANY
The United Illuminating Company (“UI” or “Company”) provides the following Written
Comments in response to the Notice of Request for Written Comments (“Notice”), issued by the
Public Utilities Regulatory Authority (“PURA”) on May 11, 2026, in the above-captioned docket.
I.
BACKGROUND
In 2021, PURA established the Residential Tariff program, now termed the Residential
Renewable Energy Solutions (“RRES”) Program, in its Interim Decision dated February 10, 2021,
in Docket No. 20-07-01, PURA Implementation of Section 3 of Public Act 19-35, Renewable
Energy Tariffs and Procurement Plans (“Interim Decision”); and instituted an annual review to
examine the RRES Program. On March 16, 2026, PURA initiated this Docket No. 26-08-02,
Annual Residential Renewable Energy Solutions Program Review and Rate Setting – Year 6, to
serve as the administrative record of PURA’s annual program review and approval of the Year 6
RRES Program rules and other key compliance filings.
To facilitate PURA’s evaluation of the RRES Program, it issued the Notice requesting that
docket Participants and interested stakeholders file written comments concerning the below issues
by Thursday, May 28, 2025.
COMMENTS
1. Rate setting
a. Average upfront installed system cost
1
The aggregated installed cost data as reported in PowerClerk was used to calculate the
annual average costs below.
Table 1: Average installed costs of each program year ($/watt DC).
UI
2022
N/A
2023
$3.56
2024
$4.65
2025
$4.30
2026 Q1
$4.28
b. The Investment Tax Credit (ITC) and other federal incentives currently available or
planned to be available in 2027
The ITC is not expected to be available to residential owners of photovoltaic (“PV”)
systems installed in 2027 or later. It is important to note that the customers should always consult
tax professionals regarding these types of investments.
c. Ongoing operations and maintenance (O&M) costs
UI does not collect data on estimated or actual O&M costs. However, given the high levels
of solar deployment observed, UI does not believe O&M costs are currently a significant barrier
to customers installing qualified solar energy systems. UI concurs with the methodology used to
estimate O&M costs in the final rate-setting model included in Appendix B of PURA’s Interim
Decision in Docket No. 21-08-02, dated October 6, 2021.
d. System performance (e.g., capacity factor) specific to residential solar photovoltaic
systems in Connecticut.
UI calculated the average capacity factor (based on the DC system size) for RRES systems
with 12 consecutive months of production data, yielding an average of 11 percent.
Contractor filing requirements
e. EOE’s recommendations for standardized terminology on the customer disclosure forms
and other changes to the customer disclosure forms
2
At this time, UI has no additional comments beyond those included in the CCWG report.
f. EOE’s recommendations for standardized annual usage calculation, utility escalation rate,
PV degradation rate, calculation methodology for estimated year one net savings, and
calculation methodology for multi-year net savings
At this time, UI has no additional comments beyond those included in the CCWG report.
g. EOE’s recommended allowable methods for determining starting utility rate, including
whether the choice of starting utility rate should prioritize consistency across customers
or accurately reflecting a specific customer utility rate
UI believes the starting utility rate should be based on the utility rate in effect at the time
of project submission and should not rely on third-party supplier rates. Third-party supplier rates
may exceed utility rates, artificially inflating customer savings, and may vary widely depending
on the customer’s contract terms with that supplier.
UI also recommends PURA carefully consider allowable methods for calculating the
starting utility rate for customers on the low-income discount rate (LIDR) to help bolster consumer
protections for vulnerable customers.
h. The timing of customer disclosure form presentation to customers and EOE’s
recommendation that completed forms be provided at the time of solar installation contract
signing
At this time, UI has no additional comments beyond those included in the CCWG report.
i. EOE’s recommended timing for implementing the recommended measures
UI recommends allowing sufficient time for implementation in PowerClerk and for
installers’ internal processes, in accordance with PURA's directive. As indicated in CAE-004.
j. How RRES contractors should be made aware of any adopted requirements
3
UI recommends that developers be notified of the updated requirements via an email
broadcast of the specific requirements. In addition, UI will notify upon login in PowerClerk with
a banner to note changes in requirements, as was previously used for any significant changes.
Further, UI will provide significant changes in the annual installer webinar for the annual RRES
Program changes.
k. Whether the Authority should adjust the Residential Tariff Model to utilize average utility
escalation rate and PV degradation rate consistent with the recommendations in the
CCWG Report (i.e., a 20-year average utility escalation rate and average degradation rate
as determined by ISO-NE in its most recent NREL Annual Report)
At this time, UI has no additional comments beyond those included in the CCWG report.
l. Any additional aspects of the report or recommended changes to contractor compliance
requirements
At this time, UI has no additional comments beyond those included in the CCWG report.
2. Solar production measurement for DC-coupled solar and storage systems
UI does not have any additional comments beyond those in Motion 26, Docket 26-08-02.
3. Additional Comments
In addition to the above-requested comments, UI would like to highlight an additional item
for PURA’s consideration. The current Multi-Family Affordable Housing (MFAH) eligibility
requirements do not include siting or size-to-load requirements that are specific to the MFAH
market segment. The RRES Program requires that the eligible solar PV system be located on the
eligible property and that the total system size be limited to meet historical usage, or up to 9 kW
AC (per unit for MFAH) when historical usage is not available. Additional capacity may be eligible
if the customer is pursuing eligible electrification measures. For MFAH properties, the broad
4
eligibility requirements can allow for a very large, commercial-scale, ground-mounted system to
be eligible for the RRES Buy-all incentive rate plus income-eligible adder, totaling $0.3839/kWh.
In some cases, the property is large enough that the ground-mounted system’s proposed siting
requires a new service at an entirely separate interconnection point from the existing building load.
Such projects are less costly to construct and may be more similar to a Non-Residential Renewable
Energy Solutions (NRES) or Shared Community Energy Facilities (SCEF) project than the typical
RRES project. Currently, the only penalty for disallowance from participation in the RRES
program is the loss of the $0.055 Income Eligible Adder, bringing the incentive to $0.3289, which
is significantly higher than incentives under the NRES program. Therefore, UI recommends that
these project types participate under the NRES program.
UI further requests that the Authority consider whether additional siting or adjusted sizing
requirements may be necessary to focus RRES MFAH eligibility on solar PV systems located on/at
the property they serve.
III.
CONCLUSION
UI appreciates this opportunity to provide these comments and look forward to further
discussing these issues with PURA and docket participants during the course of this proceeding.
Respectfully submitted,
THE UNITED ILLUMINATING COMPANY
Alex E. Soter
Alex E. Soter
Counsel
UIL Holdings Corporation
180 Marsh Hill Road
Orange, CT 06477
Phone: [phone removed]
Email: [email removed]
As Counsel for The United Illuminating Company
5
CERTIFICATION
This is to certify that on this day, May 28, 2026, the foregoing document was filed with the
Public Utilities Regulatory Authority, and copies of the foregoing document were served upon
each person designated on PURA’s official service list in this proceeding in accordance with
R.C.S.A. § 16-1-15.