Written Comments
Filed by EQ Research LLC1 file
Part of docket 26-08-02Files1
PURA 26-08-02 Sunrun Inc., Tesla, GoodLeap, IGS, Connecticut Solar & Storage Association, and Earthlight Technologies Written Comments.pdf
PDF · 328 KB · 20 pagesText searchable
Download PURA 26-08-02 Sunrun Inc., Tesla, GoodLeap, IGS, Connecticut Solar & Storage Association, and Earthlight Technologies Written Comments.pdfRead the text of PURA 26-08-02 Sunrun Inc., Tesla, GoodLeap, IGS, Connecticut Solar & Storage Association, and Earthlight Technologies Written Comments.pdf
May 28, 2026
Via Electronic Filing and Service
Jeffrey R. Gaudiosi
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, Connecticut 06051
RE: Docket No. 26-08-02, Sunrun Inc., Tesla, GoodLeap, IGS, Connecticut Solar &
Storage Association, and Earthlight Technologies Written Comments in response to Notice
for Written Comments
Mr. Gaudiosi,
Sunrun Inc, Tesla, IGS, Connecticut Solar & Storage Association, GoodLeap, and
Earthlight Technologies respectfully submit the attached written comments in response to the
Notice of Written Comments issued by the Public Utilities Regulatory Authority on May 11,
2026 in the above referenced proceeding.
Please contact me with any questions regarding this filing.
Respectfully submitted,
/s/ Kyle Wallace
Kyle Wallace
Senior Director, Public Policy
Sunrun Inc.
600 California St, Suite 1800
San Francisco, CA 94108
Phone: [phone removed]
Email: [email removed]
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
Annual Residential Renewable
:
Docket No. 26-08-02
Energy Solutions Program
:
Review - Year 6
:
May 28, 2026
______________________________________________________________________________
WRITTEN COMMENTS OF SUNRUN INC., TESLA, GOODLEAP, IGS,
CONNECTICUT SOLAR & STORAGE ASSOCIATION, AND EARTHLIGHT
TECHNOLOGIES
______________________________________________________________________________
I.
Introduction and Summary
Sunrun Inc. (“Sunrun”), Tesla, GoodLeap, IGS, Connecticut Solar & Storage
Association, and Earthlight Technologies (collectively the “Undersigned Entities”) respectfully
submit these comments in response to the Notice of Request for Written Comments issued by the
Public Utilities Regulatory Authority (“the Authority”) in Docket 26-08-02 on May 11, 2026.
The Notice requests comments on three topics: rate setting, the Contractor Compliance Working
Group Report, and on United Illuminating’s (“UI”) Motion for Clarification regarding solar
production measurement for DC-coupled solar and storage systems. The Undersigned Entities
will provide comments on all three topics.
II.
Rate Setting
The 2027 program year will be the final full year of the Residential Renewable Energy
Solutions Program (“RRES Program”) and accordingly the Authority should limit significant
structural changes while prioritizing and ensuring continuity as all stakeholders prepare for the
forthcoming RRES successor proceeding launching this August. The 2026 program year is being
1
impacted by several key factors which will flow through into deployment figures and will be
applicable for the 2027 program year as well.
The residential solar sector continues to face a challenging market environment. As of
January 1, 2026, the 25D Residential Clean Energy Credit is no longer available. This created a
small surge in applications in the second half of 2025 (primarily Q3) as homeowners sought to
install their systems before the end of the year, and an expectation for 2026 of market
contraction. While the section 48E Clean Electricity Investment Credit remains available through
2027, there remains uncertainty regarding the Foreign Entity of Concern (“FEOC”) requirements
that a project must meet in order to be eligible for the tax credit. The Department of the Treasury
issued guidance in February that clarified certain issues regarding the Material Assistance Cost
Ratio and the various compliance pathways, but did not provide clarity regarding important
elements of the “Foreign-Influenced Entity” determination. This has perpetuated uncertainty as
investors and manufacturers are unclear on their eligibility to capture tax credits, tightening
financing and available equipment. The necessity of FEOC compliance for tax credit purposes
has also had an impact on FEOC-compliant equipment prices from the few manufacturers with
tax credit certainty. Also on the federal policy front, the Trump administration continues to use a
broad set of tools to add precariousness and costs into the solar supply chain. Trade policies like
Anti-Dumping / Countervailing Duties, the ongoing spectre of broad based tariffs, and more
targeted approaches like the use of Section 232 to investigate polysilicon or aggressive supply
chain audits under the Uyghur Forced Labor Prevention Act, have had a cumulative effect of
driving up the price of various components of a solar system, creating headwinds for project
deployment.1
1
For example, see
https://pv-magazine-usa.com/2026/04/03/u-s-solar-module-prices-face-upward-pressure-as-trade-risks-an
d-feoc-rules-dominate-q1-2026/.
2
The increase in the non-bypassable charge (“NBC”) to $.0402/kWh for 2026 represented
a significant increase to the $.005/kWh NBC that was in place for RRES projects in 2025. This
substantial increase in the NBC has come at a time when utility rates in Connecticut have
decreased multiple times over the past year and a half, most notably the major decrease to the
NBFMCC and System Benefits Charge that took effect on May 1, 2026. Rates will decrease
further on July 1 when the new supply rates go into effect. New RRES participants will receive
the lowest level of compensation since the start of the RRES Program in 2022. The chart below
displays the RRES Netting Tariff value for participants based on average utility rates from prior
program years and incorporating the REC adder or NBC as applicable.2
Figure 1: RRES Netting Value, Inclusive of REC Adder and NBC
Unsurprisingly, the reduced compensation levels coupled with the loss of the 25D tax
credit, and increased equipment costs and uncertainty has resulted in Q1 2026 RRES applications
2
Average utility rates for 2022-2025 were pulled from the Residential Tariff Model used in the 25-08-02
Final Decision. The July 1, 2026 utility rate is based on current rates and the expected supply rate
reduction that will take effect on July 1. The REC adder was included for Eversource in 2022 and 2023
and the NBC was applied to both utilities in 2025 and 2026.
3
falling to nearly half of what the RRES Program has seen during Q1 in prior years.3 This is a
smaller number of applications than even in Q1 2022 when the RRES program had just launched
(and therefore had experienced some demand pull-forward in 2021 as customers sought
eligibility for net metering) and the new RRES interconnection process was experiencing major
challenges which took several months to resolve. While Q1 is typically the quarter with the
fewest number of applications in a year, the precipitous drop is unique but parallels the national
trend. WoodMackenzie, in an April 2026 report, anticipates a 19% drop in the U.S. residential
solar market for 2026.4 Still, even this forecast may be conservative as it expects TPO project
eligibility for the ITC and bonus adders to cushion the sector, when as we laid out above, access
to the ITC is being complicated by the lack of FEOC guidance by the Treasury Department. The
Authority should take into consideration the levels of new applications and deployment as we get
additional data for Q2 and Q3. Based on the current market conditions, achieving the program
objective of maintaining “the sustained, orderly development of the state’s solar industry” will be
more challenging for 2026 and 2027 than in prior years.
3
RRES application data pulled from Eversource Compliance Filing - Order No. 11 in Docket 25-08-02
(April 15, 2026) and UI Compliance Filing - Order No. 11 in Docket 26-08-02 (May 1, 2026).
4
Wood Mackenzie US residential solar finance update H1 2026
4
Figure 2: RRES Applications Submitted by Quarter
The Year 5 Final Decision used a forecasted utility rate of $.313573/kWh for Eversource
and $.358249/kWh for UI which resulted in the $.0402/kWh NBC. Beginning on July 1, 2026,
Eversource’s rate will be approximately $.236/kWh and UI’s $.266/kWh. These utility rates are
substantially below what was modeled and, if incorporated into the Residential Tariff Model,
would have resulted in the model recommending a REC adder rather than a NBC. The
Undersigned Entities believe that an NBC of $.0325/kWh, as required by Public Act 25-173,
would be appropriate for 2027.
The Undersigned Entities are concerned that further increasing the NBC for 2027 would
impact RRES program participant satisfaction due to the size of the NBC. A customer whose
system produces 800 kWh in a month on average is seeing a $32.16/month solar charge on their
bill. This is substantially more visible and impactful to their total bill than the $4 charge for that
same system production in 2025. As explained by Eversource in Docket 25-08-02, it may be
confusing to consumers to be simultaneously credited and charged for the same production.5 We
5
See Eversource Written Exceptions, Docket No. 25-08-02, December 9, 2025.
5
share the same concern and do expect more customer questions regarding the NBC on customer
utility bills as the year progresses and more 2026 systems are placed in service.
III.
Contractor Compliance Working Group Report
As an initial matter, the Undersigned Entities note that the comments throughout the
Contractor Compliance Working Group (“CCWG”) Report regarding the many proposals and
topics generally reflect the applicable company’s perspective. While the Undersigned Entities
would point to the CCWG Report on specific proposals and topics, we will address several
higher level considerations regarding the report. As explained further below, the Authority
should be conscientious about when to implement whichever suggestions the Authority
ultimately adopts from the CCWG Report. EOE’s suggestions targeting a July 1, 2026, deadline
for some changes would not be feasible given the regulatory cadence, and incorporating some of
these suggestions should be considered for the 2027 program year or in the successor program
depending on the scope and complexity of the change. If the Authority does wish to incorporate
recommendations into the final year of the RRES, we ask that an appropriate amount of time be
given to the market to adjust their business operations. The Undersigned Entities recommend
that 90-days be provided from the time of a final order, with potentially a longer time frame
depending on the complexity of the new requirements.
a. Standardized Terminology and Customer Disclosure Form Changes
The Undersigned Entities are supportive of the standardized terminology recommended in the
CCWG Report. The Undersigned Entities also support the CCWG Report recommendations to
adopt Proposals 16, 17, 21, and 22. Regarding Proposal 19, the CCWG Report reflects Tesla’s
concern with this proposal.
6
b. Standardized Inputs & Assumptions
The Undersigned Entities are generally supportive of the recommendations for proposals
3, 4 &5, 7, and 9.6 As discussed below, it will be critical that appropriate time–at least 90 days–is
provided between when an order or decision is issued regarding these changes and when the
changes go into effect. Some of the recommendations may require changes to internal data
systems and calculations, processes, and customer-facing documentation that will take time to
update to be in compliance. Rushing compliance could lead to mistakes and unintended harm for
consumers. Allowing contractors who are already contending with a precarious market the grace
to make the necessary compliance updates will allow for more confident and trustworthy
consumer experiences.
Regarding proposals 14 & 15 on Estimated Multi-Year Net Savings, the Undersigned
Entities have slightly different perspectives that are reflected in the CCWG Report. EOE
recommends an addition to Proposal 14 that was not voted on regarding the inclusion of any
costs that may occur outside of the 20-year RRES term in the multi-year net savings calculation.
The Undersigned Entities do not support this addition. Section 16-244z requires the Authority to
establish a tariff for compensating RRES customers at the expiration of their 20-year term. As
such, these customers’ systems will continue to provide value. However, EOE’s addition would
only incorporate the costs, and not the value provided, after the 20 years which will necessarily
skew the multi-year net savings estimate.
c. Starting Utility Rate
The Undersigned Entities agree with the CCWG Report that trying to standardize the
starting utility rate was the most challenging topic, and we appreciate the input and perspectives
of all members of the CCWG. Simply put, no method for determining a starting utility rate is
6
Sunrun,Tesla, and GoodLeap all preferred Proposal 5 rather than Proposals 4.1 and 4.2.
7
perfect and there are multiple defensible approaches that all have their own benefits and
drawbacks. There is certainly a tension between consistency across customers and
customer-specific accuracy.
For example, Proposal 1 which would simply require use of the utility rates set by the
Authority in the annual RRES docket is straightforward and from a practical perspective is easier
to comply with because it is a single number for each utility that is updated once a year.
However, if this proposal had been in effect for 2026, customers in July would be seeing
$.31/kWh for Eversource on the customer disclosure form and other proposal materials despite
the utility rate being under $.24/kWh (before taking into account the NBC). This is a substantial
difference, and Sunrun expressed discomfort about this very situation during a CCWG meeting.
Because utility rates change multiple times per year, any set utility rate will necessarily be
“wrong” at some point during the year. A rigid methodology that cannot account for these
inevitable swings, in either direction, is a risk for program participants and contractors. At the
end of the day, it is the contractors who have to show, explain, and defend any savings estimates
and their associated inputs and methodology to prospective customers. If the required starting
utility rate differs too much from the reality that the prospective customer sees on their utility
bills, that puts the contractors in a challenging spot, and the answer of “we are required to use
this utility rate” may not be satisfactory for the customer.
On the other hand, using the current utility rate from recent utility bills is “accurate” in
that the customer is readily able to confirm the rate. However, a methodology that only
incorporates the current rate may not properly account for the supply rate differential based on
the time of year, changes to the RAM charges, or other rate changes. Other methodologies may
include using the current charges for certain rate components while using a longer-term average
8
for others (namely the supply rate). Each of these methodologies has their own merit and are
defensible, and none are definitively “wrong.” It is important to acknowledge this inherent
complexity and that any utility rate that is used will never be “perfect” for every situation.
As such, the Undersigned Entities agree with EOE that transparency regarding the
starting utility rate is the best approach. We agree that the addition of a fillable text box where
the source and methodology of the starting utility rate can be provided to customers would be
appropriate. We do not believe that the Authority should authorize a set of approved
methodologies as recommended by EOE, particularly because authorized methodologies would
already be fairly wide-ranging and allow for a range of calculations. While some contractors
participated in the CCWG, any new requirements regarding inputs and assumptions would apply
to dozens of other contractors who were not involved and it would not necessarily be fair to
preclude them from using what may be equally valid methodologies.
Regarding what is required to be provided in the fillable text box versus what is required
in a contractor’s annual compliance filing, the key difference will be what is useful and
actionable information for the customer. We are concerned that EOE’s proposed language for
what is provided in the text box may be too complicated for customers to understand and appears
to potentially require customer-specific disclosures regarding items such as the supply rate which
would be very challenging to actually operationalize. What is useful for the consumer is
understanding what the starting utility rate is intended to reflect. Is it a historical average over a
period of time? Is it based on what the current utility rate is? Does it account for a third-party
supplier rate? Requiring information in the explanation that an average customer will not
understand will likely lead to confusion, and not clarity. The more detailed information regarding
9
how a starting utility rate is calculated is more appropriately reflected in the annual compliance
filing like it is today.
d. Timing of the Customer Disclosure Form
The Undersigned Entities supported ensuring that the customer disclosure form is
provided to consumers contemporaneously with the solar contract. This aligns with best practices
from other jurisdictions and provides the customer with the disclosure form alongside the longer
solar contract so that they can more easily identify the key material terms of the contract and
compare against other proposals they may have received. The CCWG Report notes that EOE and
OCC believe that the customer disclosure form should be provided in advance, potentially
several days in advance, to the customer signing the solar contract. The Undersigned Entities
contend that providing the customer with the contract and the customer disclosure form at the
same time does not prevent the customer from taking time to review the disclosure form, solar
contract, ask questions, or seek out additional quotes. Not all contracts are signed immediately
after being provided by the contractor.
However, it is critical that the contract and disclosure form be provided together because
the information must match and if they are generated separately and provided at different times it
increases the chance of inconsistency of information. The contract must be generated to have
proper information on the customer disclosure form, and it would be unwise to force customers
to sit with incomplete information (just the customer disclosure form, when there is a significant
amount of pertinent information in the contract itself) for a regulated period of time before
receiving the rest of the already-generated package that is necessary for them to make an
informed decision.
10
Under Connecticut law, consumers have a minimum three day cancellation period for any
home improvement contract. Many solar companies offer consumers the ability to cancel their
solar contract well after the three day period, including up until the date that the installation has
begun at the home. This provides significantly more time for consumers and negates the need to
provide the disclosure form several days in advance of the solar contract.
e. Implementing New Requirements
EOE recommends in the CCWG Report that the customer disclosure form changes go
into effect no later than July 1, 2026 and that the requirements regarding standardized inputs,
assumptions, and methodologies go into effect on January 1, 2027. The Undersigned Entities
have concerns regarding this proposed timeline for implementation. While some proposed
changes to the customer disclosure form, such as terminology changes and some additions, are
minor and could be implemented more quickly, other elements such as the definitions on the
customer disclosure form directly relate to or reference the standardized inputs, assumptions, and
methodologies which would not be required until January 1, 2027. This mismatch would create
potential challenges for implementation. As a practical matter, even if the customer disclosure
form changes were approved within the next few weeks, that would leave insufficient time to
ensure that contractors would be able to include the updated disclosure form with all new
contracts starting by July 1.
The Authority should finalize any new requirements and disclosure form changes at the
same time because they necessarily impact each other. Approving some changes while still
considering others will make it harder to achieve compliance among the broader RRES
contractor industry and potentially require multiple changes to the same document within a short
period of time (i.e. the customer disclosure form). It is critical that there is clarity on the
11
requirements and that there is an opportunity for docket participants to review the proposed
changes to the disclosure form and standardized inputs and assumptions in combination so that
any practical challenges or inconsistencies can be identified.
Most importantly, the Authority must allow for enough time for contractors to make the
necessary adjustments to their systems, documents, training personnel, and potentially working
with third-party vendors to ensure compliance. For example, the current schedule for this docket
has a tentative Final Decision date of October 28, 2026. This would provide two months (albeit
with holidays) to incorporate any changes to be ready for a January 1, 2027 implementation date.
For changes that are minor or are solely within the contractors control, this timeline may be
sufficient. For more complex changes, particularly if they involve working with third-parties
(such as software providers who generate proposals, utility rates, or savings estimates) to ensure
their systems are compliant may take additional time. Additionally for RRES contractors who
have not been closely following the CCWG and this proceeding, it is unlikely they would be able
to meet a January 1 compliance deadline.
At a minimum, contractors should have 90 days from when an updated customer
disclosure form is available and standardized inputs, assumptions, and methodologies have been
approved by the Authority to make the necessary changes to systems, processes, documentation,
workflows with vendors, and employee training. Additionally, the Authority should recognize
that it will necessarily take time beyond the actual implementation date for all RRES contractors
to come into compliance, particularly on the standardized inputs and assumptions, and there
should be sufficient flexibility for those contractors to do so.
f. Making RRES Contractors Aware of Changes
12
How the wide range of RRES contractors are made aware of any new requirements
stemming from the CCWG Report and this annual review proceeding is an important question to
consider. Some changes, such as those to the customer disclosure form itself, will be more
straightforward to implement. The new customer disclosure form will become available and
RRES contractors can be notified through an EDC communication and having those updated
documents available on the website. Ultimately, if an RRES contractor is using an outdated
version, at some point they will not be able to receive RRES or interconnection approval.
The changes to the inputs and assumptions and net savings methodologies are much more
difficult to enforce. Not only are they more complicated, but they may impact a broader set of
company processes, documents, and personnel. As has been seen with the Annual Compliance
Filing, even with robust materials and education & outreach efforts by EOE, it is difficult to
achieve compliance for all contractors. Email notices to RRES applicants, webinars, and public
documents outlining the requirements will all be important to reach as many contractors as
possible. Additionally, more time may be required between when the new requirements are
ordered and when compliance is expected to account for the fact that most RRES contractors are
likely unaware that such changes are even under consideration.
g. Residential Tariff Model Inputs
Currently the Residential Tariff Model uses a .5% degradation rate which matches what
would be required under the proposed standardized input. The Undersigned Entities do not have
any issue with aligning that input for the Residential Tariff Model. The ISO-NE Distributed
Generation Forecast used for the annual CELT report includes a degradation rate that is based on
the NREL data. Regarding aligning the utility rate escalation with a 20-year term instead of the
current 16-year term, the Undersigned Entities are supportive in concept. In practice, this may
13
only really impact the rate setting process in this proceeding because it is not clear at this point
whether the RRES successor program will have an annual rate setting process.
h. Role of PowerClerk
If the customer disclosure form is provided contemporaneously with the solar contract, as
we believe it should, that must and should be done outside of PowerClerk. It is not practical for
contractors to create RRES applications in PowerClerk before a contract has been signed in order
to generate a disclosure form. Customer disclosure forms can be filled out manually or through
automation that is tied to information in the contract, neither of which requires anything that
PowerClerk provides. Additionally, generating the customer disclosure form in PowerClerk
would require sales-focused employees to be trained and responsible for managing the start of an
RRES application in the PowerClerk portal despite other employees typically being responsible
for that task. PowerClerk should simply be able to receive an uploaded, signed customer
disclosure form as part of the RRES application. There is no need for contractors to manually
enter customer disclosure form information as part of the RRES application.
IV.
Solar Production Measurement for DC-Coupled Solar and Storage Systems
The Undersigned Entities do not believe the perceived issues identified in UI’s Motion
for Clarification warrant the proposed solution. UI’s assertion that there is no way to measure
exclusively the PV generation from a site is incorrect - it is done successfully across Connecticut
today and has been for as long as DC-coupled systems have been available. We believe the
potential issues raised in the Motion can be, or already are, solved without requiring the
significant steps of moving customers to a standardized capacity factor approach and preventing
14
the sale of RECs from all DC-coupled solar plus storage systems. The Undersigned Entities
would be willing to participate in a technical meeting if necessary.
The measurement desired by UI is accomplished by configuring the wiring and charging
controls in line with what is required for RRES participation under Section VII.T of the
Residential Renewable Energy Solutions Program Manual. Installers place the production meter
directly upstream of the shared inverter and commission the battery to only charge from the
DC-connected PV array. This ensures that the only energy that passes across the production
meter is PV-generated.
All three of the concerns UI raises in their motion are unfounded:
● REC Compliance - the wiring and charging configuration already required for RRES
participation and described above ensures that the only energy that the production meter
registers comes from the coupled PV, an eligible resource. The only exception to this
would be the minimal amount of energy the BESS had when it was installed.
● Non-Bypassable Charge Calculation - the wiring and charging configuration already
required for RRES participation and described above captures all energy produced by the
PV system. The only exceptions to this are parasitic load and the minimal amount of
energy that the PV system has produced and the BESS system has stored but not yet
discharged. Today, the non-bypassable charge is calculated on the net reading from the
production meter, functionally capturing the same characteristics for AC and DC coupled
systems.
● Islanding Requirements - the concern raised in the motion is counteracted by the
requirements of RRES participation in Section VII.T of the Program manual. This
contention is especially frustrating to hear from UI given that Tesla and Sunrun met with
UI earlier this year to review these wiring diagrams.
The fact that Eversource does not share the same concerns regarding DC-coupled solar
plus storage systems suggests that effective solutions are already in place or the concerns are not
actually valid. If UI is still concerned with the wiring configurations and charging restrictions
that have allowed RRES to operate successfully for years, we recommend the Authority convene
a technical conference in which UI brings the specific configurations which are causing these
concerns to be discussed with stakeholder experts. It would be helpful for UI to bring examples
15
of actual DC-coupled solar plus storage projects to show where these program integrity concerns
are stemming from. We believe that simply not selling RECs from any DC-coupled solar plus
storage system is unnecessary and would reduce ratepayer benefits provided by the program in
the form of offsetting REC sales that help cover some portion of program costs. We are also
concerned about how a standardized capacity factor approach would be implemented and the
potential impact on affected customers. Such a change would require EDC resources and costs
which may not be worthwhile for a limited number of projects for the final year of the RRES
Program.
Stepping back, the Undersigned Entities do strongly support finding ways to eliminate
these types of potential complications in the forthcoming RRES successor program. If at all
possible, the successor program should seek to be structured in a way that does not require a
separate solar production meter. Not only will this reduce the equipment on the customer’s home
and reduce costs but it will also simplify the interconnection process. The most important
measurement occurs at the revenue meter and point of common coupling; subordinate meters
complicate projects and programs, adding unnecessary costs for consumers. We believe there are
other pathways in the successor program that can avoid the need for a production meter,
particularly if the production meter’s sole purpose is to generate RECs. These other approaches
may include estimation methodologies, use of inverter telemetry, or simply recording RECs at
the revenue meter.
V.
Conclusion
The Undersigned Entities appreciate the opportunity to provide these written comments
to the Notice and look forward to engaging throughout this annual review process.
16
Respectfully submitted,
/s/ Kyle Wallace
Kyle Wallace
Senior Director, Public Policy
Sunrun Inc.
Phone: [phone removed]
Email: [email removed]
/s/ Dominic Gatti
Dominic Gatti
Energy Policy Advisor
Tesla, Inc.
Phone: [phone removed]
Email: [email removed]
/s/ Jake Assael
Jake Assael
Director of Policy
GoodLeap
Phone: [phone removed]
Email: [email removed]
/s/ Sean Riel
Sean Riel
Director, Sales Operations
Earthlight Technologies, LLC
Phone: [phone removed]
Email: [email removed]
/s/ Kate Hanley
Kate Hanley
Legislative & Regulatory Affairs Manager
IGS
Phone: [phone removed]
Email: [email removed]
17
/s/ Mike Trahan
Mike Trahan
Executive Director
Connecticut Solar & Storage Association
Phone: [phone removed]
Email: [email removed]
CERTIFICATION
This is to certify that on this day, the foregoing document was filed with the Public Utilities
Regulatory Authority, and copies of the foregoing document were served upon each person
designated on the Authority’s official service list in the above referenced proceeding in
accordance with R.C.S.A. § 16-1-15.
/s/ Rob Campbell
Rob Campbell
EQ Research, LLC
1155 Kildaire Farm Road, Suite 203
Cary, NC 27511
Phone: [phone removed]
Email: [email removed]
May 28, 2026
As listed on the current system
Written Comments - 05/28/2026 [26-08-02] (EQ Research LLC)