Written Comments
Filed by Earthlight Technologies, LLC
Part of
Annual Residential Renewable Energy Solutions Program Review and Rate Setting - Year 6
- Type of filing
- Comments (Written Comments)
- Date filed
- August 19, 2026
- Filed by
- Earthlight Technologies, LLC
- Files
- 1
As listed on the current system
Written Comments - 08/19/2026 [26-08-02] (Earthlight Technologies, LLC)
Files1
26-08-02 ELT Written Comments.pdf
PDF · 676 KB · 5 pagesText searchable
Download 26-08-02 ELT Written Comments.pdfRead the text of 26-08-02 ELT Written Comments.pdf
August 19, 2026
Via Electronic Filing and Service
Jeffrey R. Gaudiosi
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, Connecticut 06051
RE: Docket 26-08-02 Annual Residential Renewable Energy Solutions Review - Year 6 –
Written Comments
Dear Mr. Gaudiosi,
Earthlight Technologies, LLC respectfully submits these written comments for filing in Docket
26-08-02. Please contact me with any questions regarding this filing.
Respectfully submitted,
/s/ Sean Riel
Sean Riel
Director of Sales Operations
Earthlight Technologies, LLC
128 West Road
Ellington, CT 06029
T: [phone removed]
E: [email removed]
Earthlight Technologies, LLC
128 West Rd
Ellington, CT 06029
p: [phone removed]
f: [phone removed]
earthlighttech.com
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
Residential Renewable Energy Solutions Program
Review – Year 6
:
:
Docket No. 26-08-02
August 19, 2026
EARTHLIGHT TECHNOLOGIES, LLC WRITTEN COMMENTS IN RESPONSE TO
NOTICE
Earthlight Technologies, LLC (“Earthlight”) submits these written comments to the
Public Utilities Regulatory Authority (“Authority”) in response to the Notice of Written
Comments issued in this docket on August 4, 2026. We appreciate the opportunity to provide
these comments to inform future changes in the Residential Renewable Energy Solutions
(“RRES”) program.
I.
Program Manual Updates
Earthlight makes no comments on this provision.
II.
Application Fees
Earthlight’s comments regarding application fees contend specifically with the current
$25 interconnection application fee adder, as discussed in last year’s final decision. 1 We
respectfully urge the Authority to extend the definition of Residential Distributed Energy
Resources (“Residential DER”), as set forth in 22-06-29, which defines Residential DER as
“certified inverter-based systems with a nameplate capacity of 25 kW or less,” 2 to encompass
multifamily affordable housing (“MFAH”) projects. Since the Authority established the
interconnection cost allocation policy and the $25 interconnection application fee adder, 3 a
1
See Final Decision, 25-08-02 p. 14.
See 22-06-29 Final Decision, p. 4
3
Ibid., p. 14.
2
greater number of homeowners have been able to access the benefits of residential solar
deployment without being subject to unpredictable costs to be incurred at a later date. MFAH
projects greater than 25 kW nameplate capacity have been required to pay this same fee adder;
however, such projects have not been afforded the opportunity to benefit from the program that
the fee adder supports.
We respectfully submit the following points for the Authority’s consideration.
The decision in 26-06-29 establishing the definition of Residential DER was issued on
December 20, 2023. The Authority did not formalize a pathway for MFAH participation within
the RRES program until July 10, 2024.
The Authority now sets the interconnection application fee adder, originally established
in the 22-06-29 decision, within the RRES program docket, thereby making the socialization of
transformer upgrade costs an integral component of the RRES program’s structure. Because
MFAH projects fall within the scope of the RRES program and are required to contribute to this
fund, such projects should be permitted to access its associated benefits.
To exclude MFAH projects from the benefits made possible by the fee adder would
contravene the fifth Program Objective, which is to “encourage increased inclusivity overall, as
well as program participation by low- and moderate-income (LMI) customers and customers in
environmental justice communities.” Such exclusion would run counter to the Authority’s stated
commitment to inclusivity and to expanded participation among low-and moderate-income
customers and customers residing in environmental justice communities.
III.
Multi-Family Affordable Housing Eligibility Requirements
We urge the Authority to reject the Electric Distribution Companies’ (“EDCs’”)
suggestion to introduce additional complexity into the MFAH segment of the RRES program. In
particular, Earthlight asks the Authority to reject the EDCs’ central argument that MFAH
projects are indistinguishable from Non-Residential Renewable Energy Solutions (“NRES”) or
Shared Community Energy Facilities (“SCEF”) projects.4 What the EDCs characterize as a large
project, whether ground-mounted or roof-mounted, would likely qualify as a small or medium
NRES project. Such small projects would never materialize as SCEF projects. Unlike small or
medium NRES projects, MFAH RRES projects require the system owner to share a percentage
of the Buy-all revenue, either through the distribution of 20% of the revenue amount tenants in
an individually-metered configuration, or through the allocation of at least 25% of the net present
value of the revenues to qualified building upgrades in a master-metered configuration, As a
further distinction from NRES projects, MFAH RRES projects are designed to benefit
underserved ratepayers.
Should the Authority elect to lower compensation rates for these project types, such
action would directly reduce incentive billing credits afforded to low-income customers,
assuming developers and system owners elected to proceed with such systems at all.
Should the Authority require installers to utilize separate points of interconnection for
each individual building, as Eversource suggested during the technical meeting, 5 Earthlight fails
to understand what problem would be resolved. These solar arrays are already sized to the
aggregate load of the tenant meters in accordance with RRES guidelines. Where a system is
oversized relative to tenant load, the program manual provides that the EDCs will reject the
application. The imposition of multiple points of interconnection would needlessly increase costs
4
5
See Eversource Comments, May 8, 2026, pp. 7-8l UI Comments, May 28, 2026, pp. 4-5
See Technical Meeting, 26-08-02, August 18, 2026.
through additional interconnection applications, meters, and other electrical equipment, likely
making safe-harbored projects and future projects cost-prohibitive.
IV.
Conclusion
Earthlight appreciates the opportunity to provide these written comments to the Authority
for the 26-08-02 Annual Review.
Respectfully submitted,
Earthlight Technologies, LLC
/s/ Sean Riel
Sean Riel
Director of Sales Operations
Earthlight Technologies, LLC