NoticeFiled
Notice of Technical Meeting
Part of
Docket 26-08-02Closed
Annual Residential Renewable Energy Solutions Program Review and Rate Setting - Year 6
- Type of filing
- Notice (Notice of Technical Meeting)
- Date filed
- July 20, 2026
- Filed by
- Not recorded
- Files
- 1
As listed on the current system: Notice, Technical Meeting 07/20/2026 ( ... ) [26-08-02]
Files
26-08-02 Notice of Technical Meeting.pdf
PDF · 230 KB · 3 pagesText searchable
Download 26-08-02 Notice of Technical Meeting.pdfRead the text of 26-08-02 Notice of Technical Meeting.pdf
Text of 26-08-02 Notice of Technical Meeting.pdf
Extracted from the file · 5,189 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
DOCKET NO. 26-08-02
ANNUAL RESIDENTIAL RENEWABLE ENERGY SOLUTIONS PROGRAM REVIEW
AND RATE SETTING - YEAR 6
NOTICE OF TECHNICAL MEETING
(August 18, 2026)
In 2021, the Public Utilities Regulatory (Authority or PURA) communicated its
intent to initiate a docket annually to review key Residential Tariff, now the Residential
Renewable Energy Solutions (RRES) Program, metrics, including deployed megawatts
and low-and-moderate income customer participation, and to ensure that the program is
“on track to at least maintain historical deployment levels and to deliver a carbon free grid
by 2040.” Interim Decision, Feb. 10, 2021, Docket No. 20-07-01, PURA Implementation
of Section 3 of Public Act 19- 35, Renewable Energy Tariffs and Procurement Plans, p.
40 (Interim Decision). Further, the Authority stated it will use the docket to “set the [RRES
Program] rates, any separate [renewable energy certificate (REC)] payments, and any
fully, non-bypassable charges for program applications received during the following
calendar year.” Id.
To facilitate the continued evaluation of the RRES Program, a technical meeting
of the Authority staff and participants will be held on Tuesday, August 18, 2026, at 9:00
a.m. The purpose of the meeting will be to discuss the topics included in the Notice of
Request for Written Comments issued on May 11, 2026, including: (1) rate setting for
calendar year 2027; (2) the Contractor Compliance Working Group Report and contractor
compliance requirements; and (3) solar production measurement for DC-coupled solar
and storage systems.
Additionally, the Authority directs the Connecticut Light and Power Company d/b/a
Eversource Energy (Eversource) and The United Illuminating Company (UI; together, with
Eversource, the electric distribution companies or EDCs) to provide presentations on the
following: (1) RRES program application and deployment levels by month through June
2026, including an analysis of low-income and distressed municipality participation; (2)
RRES interconnection application and approval timelines (Order No. 14 compliance); (3)
the above written comment topics; and (4) the forthcoming program documents (Order
No. 1 compliance) and proposed application fees (Order No. 2 compliance). As part of
its presentation, UI shall include specific configurations of DC-coupled solar and storage
systems, including examples of actual projects, that are causing UI’s concerns outlined
in Motion No. 24 in Docket No. 25-08-02, Annual Residential Renewable Energy Solution
Program Review and Rate Setting – Year 5.
10 Franklin Square, New Britain, CT 06051
An Equal Opportunity Employer
www.ct.gov/pura
Docket No. 26-08-02
2
The Authority invites stakeholders to present on any of the above-mentioned
topics. The Authority tentatively plans to structure the Technical Meeting as follows: (1)
EDC presentations and questions; (2) other stakeholder presentations and questions; and
(3) public comments.
All participants and interested stakeholders planning to present or otherwise
provide comments at the Technical Meeting must provide a list of speakers, along with a
designation of speaker by topic with an estimated time to present on each topic, to the
PURA case coordinator, Ussawin “Robin” Bumpen, via email, [email removed],
by 4:00 p.m. on Tuesday, August 11, 2026. The Authority will issue a draft agenda for
the Technical Meeting. All participants and interested stakeholders providing
presentations must file their presentations through the Authority’s web filing system and
provide a copy to the PURA case coordinator by 4:00 p.m. on Thursday, August 13,
2026.
The Technical Meeting will take place through remote access. Access instructions
are set forth below.
Remote attendee access: Participants, interested stakeholders, and members of
the public may register through the web link below to listen or to participate in the
meeting:
https://ctdeep.zoom.us/meeting/register/3guA4LONTf6CFGcGgJkgeA
After registering, you will receive a confirmation email containing information about
joining the meeting.
The Authority, which is within DEEP for administrative purposes only, is committed
to complying with the requirements of the Americans with Disabilities Act (ADA). If you
are seeking a communication aid or service, have limited proficiency in English, wish to
file an ADA or Title VI discrimination complaint or require some other accommodation,
including equipment to facilitate virtual participation, please contact the DEEP Office of
Diversity and Equity at [phone removed] or via email at [email removed].
Any person needing an accommodation for hearing impairment may call the State of
Connecticut relay number, 7-1-1.
In order to facilitate efforts to provide an
accommodation, please request all accommodations as soon as possible following notice
of any agency hearing, meeting, program or event.
Dated at New Britain, Connecticut, this 20th day of July, 2026.
By Direction of the Presiding Officer,
Docket No. 26-08-02
3
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Notice filed with the Secretary of the State on July 20th, 2026.