A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
Compliance Filing, Order No. 17Filed by Avangrid

Compliance with Order No. 17

Part of

Docket 26-08-03Open

Annual Non-Residential Renewable Energy Solutions Program Review- Year 6

Type of filing
Compliance filing (Compliance Filing, Order No. 17)
Date filed
July 31, 2026
Filed by
Avangrid
Files
2
As listed on the current system: Compliance Filings, 07/31/2026 [26-08-03] Order No.17 / Avangrid / Compliance with Order No. 17

This filing on the current system (opens in a new tab)

Files

Text of 2026-07-31 UI Compliance with Order No. 17 Cover Letter #26-08-03.pdf

Extracted from the file · 4,884 characters
July 31, 2026 Mr. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 26-08-03, Annual Non-Residential Renewable Energy Solutions Program Review Year 5, Compliance with Order No. 17 of the Final Decision in Docket No. 2508-03 Dear Mr. Gaudiosi, Pursuant to the Public Utilities Regulatory Authority’s (“PURA” or the “Authority”) Final Decision in Docket 25-08-03 (“Decision”) dated December 17, 2025, The United Illuminating Company (“UI” or the “Company”) respectfully submits Order No. 17 of the Decision which states: No later than August 1, 2024, and annually thereafter, each EDC shall file as compliance in the most recent annual review docket (i.e., in 2024, Docket No. 2408-04) a NRES Interconnection Report. The Report shall consist of a summary of the state of interconnection for all approved NRES projects to date and shall include, at a minimum, (1) the interconnection status of each NRES project; (2) the EDC interconnection approval due date for each project per approved interconnection guidelines; (3) the number of days from when all required interconnection materials were submitted to the utility for each project to interconnection approval, or to when the data was pulled for the report, if interconnection approval has not been granted; (4) the date for which data was pulled for the report; (5) the project attrition rate; (6) a list of the most common reasons for interconnection delays; and (7) EDC-proposed solutions for each of the most common reasons delaying interconnection. 1. The interconnection status of each NRES project. Response: The interconnection status of each NRES project can be found in Attachment 1 column C. 2. The EDC interconnection approval due date for each project per approved interconnection guidelines. Response: The EDC interconnection approval due date for projects per approved interconnection guidelines is available in Attachment 1 column D. Please note that the Interconnection Guidelines establish EDC approval timelines only for projects that have successfully completed the interconnection review process and have been granted Approval to Energize (ATE) status. 1 The Interconnection Guidelines do not define a due date, target completion date, or Electric Distribution Company (EDC) approval deadline for projects that have not yet reached the ATE milestone. Accordingly, UI's reported data is limited to projects that have completed the interconnection review process and received an ATE, as these are the only projects for which guideline-based approval due dates are established. 3. The number of days from when all required interconnection materials were submitted to the utility for each project to interconnection approval, or to when the data was pulled for the report, if interconnection approval has not been granted. Response: Please see Attachment 1 column E. 4. The date for which data was pulled for the report. Response: The data for this order was pulled on July 28, 2026 and contains data from the inception of the program through July 28, 2026. 5. The project attrition rate. Response: The project attrition rate is 6%. 6. A list of the most common reasons for interconnection delays. Response: The most common reasons for interconnection delays include: • Incomplete or inaccurate applications • Complex technical reviews • Regulatory compliance burdens • High application volumes • Multi-team coordination challenges • Metering configuration and provisioning delays • System inefficiencies and resource constraints 7. EDC-proposed solutions for each of the most common reasons delaying interconnection. Response: UI’s solutions for the most common reasons delaying interconnection referenced above include: • PowerClerk has been enhanced to add a “chess clock,” which will assign either the EDC or customer to a task, increasing assignee transparency and reducing incomplete or inaccurate application correction times. • Integration in place of a mandatory pre-submission checklist to reduce application errors and improve completeness during the initial application stage. 2 • Multiple updates and continuous process adjustments have been implemented to include enhancements to the meter procurement, programming, and installation timelines through internal process streamlining in turn, expediting the time from authority having jurisdiction (AHJ) approval to permission to operate. The implementation of these solutions continues to assist with addressing the root causes of delays and improve the overall efficiency of the interconnection application process. I hereby certify service of this filing upon all parties and intervenors of record in this proceeding. Very truly yours, James Nitz Manager, Regulatory Services UIL Holdings Corporation As Agent for The United Illuminating Company 3

Text of 2026-07-31 UI Order 17 - Attachment 1 #26-08-03.xlsx

Extracted from the file · 14,540 characters
[Sheet: Order No. 17] Program Year | Tariff ID | Question 1. Project Status | Question 2. Interconnection Approval to Energize Date | Question 3. Days from Interconnection Submittal to Interconnection Approval | System Design Capacity (SDC) kW AC Year 1 | NS40181 | Energize System | 2024-06-14 00:00:00 | 595 | 75 Year 1 | NS40173 | Energize System | 2023-10-05 00:00:00 | 318 | 120 Year 2 August | NS45165 | Energize System | 2024-07-31 00:00:00 | 567 | 43.2 Year 1 | NS40185 | Energize System | 2025-09-17 00:00:00 | 880 | 100 Year 2 August | NS45163 | Energize System | 2024-07-18 00:00:00 | 442 | 17.3 Year 1 | NS40168 | Energize System | 2023-09-07 00:00:00 | 123 | 150 Year 2 February | NS43231 | Energize System | 2023-12-12 00:00:00 | 209 | 200 Year 2 February | NS43237 | Energize System | 2023-10-25 00:00:00 | 151 | 67.3 Year 1 | BS40184 | Energize System | 2024-03-13 00:00:00 | 202 | 200 Year 2 February | BS43228 | Energize System | 2023-12-11 00:00:00 | 103 | 50 Year 2 February | NS43233 | Energize System | 2023-12-25 00:00:00 | 70 | 187.5 Year 2 February | BM43641 | Energize System | 2024-12-09 00:00:00 | 413 | 720 Year 2 February | BS43234 | Energize System | 2025-02-19 00:00:00 | 332 | 100 Year 2 August | NM45685 | Energize System | 2025-02-19 00:00:00 | 320 | 700 Year 3 February | BS46900 | Energize System | 2025-10-16 00:00:00 | 557 | 80 Year 2 August | NS45179 | Energize System | 2024-12-18 00:00:00 | 247 | 75 Year 3 February | NS46940 | Energize System | 2024-12-23 00:00:00 | 213 | 86.4 Year 2 February | BM43646 | Energize System | 2026-05-13 00:00:00 | 718 | 400 Year 2 February | BS43226 | Energize System | 2026-07-23 00:00:00 | 785 | 200 Year 2 February | BM43645 | Energize System | 2026-05-08 00:00:00 | 706 | 250 Year 1 | BS40180 | Energize System | 2025-02-18 00:00:00 | 236 | 50 Year 3 February | BS46902 | Energize System | 2025-11-20 00:00:00 | 508 | 67.3 Year 1 | NM40407 | Energize System | 2025-08-07 00:00:00 | 389 | 420 Year 2 August | BS45175 | Energize System | 2026-04-14 00:00:00 | 620 | 50 Year 2 August | NS45167 | Energize System | 2025-09-11 00:00:00 | 405 | 200 Year 2 August | NS45164 | Energize System | 2026-01-19 00:00:00 | 486 | 27.3 Year 3 February | BS47002 | Energize System | 2025-06-04 00:00:00 | 248 | 100 Year 2 August | NS45169 | Energize System | 2025-12-23 00:00:00 | 447 | 200 Year 2 August | NS45166 | Energize System | 2026-01-29 00:00:00 | 472 | 193 Year 2 August | BM45744 | Energize System | 2026-07-09 00:00:00 | 621 | 750 Year 3 February | BS47001 | Energize System | 2025-09-17 00:00:00 | 325 | 120 Year 2 August | BS45171 | Energize System | 2025-11-13 00:00:00 | 368 | 200 Year 1 | NM40286 | Energize System | 2025-12-24 00:00:00 | 409 | 433 Year 3 February | BS47003 | Energize System | 2025-11-13 00:00:00 | 365 | 120 Year 3 February | NE47246 | Energize System | 2025-03-05 00:00:00 | 101 | 460 Year 2 February | BS43221 | Energize System | 2025-08-21 00:00:00 | 236 | 200 Year 2 February | BS43222 | Energize System | 2025-08-21 00:00:00 | 236 | 200 Year 3 February | NS46886 | Energize System | 2025-07-24 00:00:00 | 201 | 67.3 Year 2 August | BS45174 | Energize System | 2026-05-20 00:00:00 | 499 | 200 Year 2 August | NL45716 | Energize System | 2026-06-26 00:00:00 | 525 | 960 Year 2 August | NS45173 | Energize System | 2025-07-24 00:00:00 | 177 | 75 Year 1 | NS40192 | Energize System | 2025-12-22 00:00:00 | 326 | 43.2 Year 3 February | NM47218 | Pending Approval To Energize | 2026-06-24 00:00:00 | 476 | 210 Year 3 August | BS48658 | Energize System | 2026-01-15 00:00:00 | 313 | 140 Year 3 August | NS48678 | Energize System | 2025-12-18 00:00:00 | 196 | 50 Year 4 Feb | NS50766 | Energize System | 2026-05-22 00:00:00 | 344 | 160 Year 3 August | NM49115 | Energize System | 2026-04-20 00:00:00 | 301 | 225 Year 4 February | NE51053 | Energize System | 2025-09-29 00:00:00 | 96 | 460 Year 3 August | NS48710 | Energize System | 2026-01-02 00:00:00 | 161 | 196 Year 3 August | NS48711 | Energize System | 2026-02-11 00:00:00 | 189 | 175 Year 4 Feb | NS50925 | Energize System | 2025-12-18 00:00:00 | 116 | 80 Year 3 August | BS48614 | Energize System | 2026-04-08 00:00:00 | 214 | 17.3 Year 2 August | BM45723 | Energize System | 2026-06-03 00:00:00 | 268 | 348 Year 3 August | BS48589 | Energize System | 2025-09-18 00:00:00 | 9 | 150 Year 4 Feb | BS50697 | Energize System | 2026-02-12 00:00:00 | 150 | 100 Year 4 Feb | BS50685 | Energize System | 2026-06-09 00:00:00 | 258 | 100 Year 4 Aug | BS52575 | Energize System | 2026-06-26 00:00:00 | 231 | 125 Year 3 August | NS48702 | Energize System | 2026-04-29 00:00:00 | 99 | 32 Year 3 February | BE47262 | Construction in Process | 2125 Year 1 | BM40343 | Construction in Process | 600 Year 3 February | BS46988 | Contingent Approval to Interconnect | 200 Year 3 August | BS48605 | Contingent Approval to Interconnect | 200 Year 4 Aug | BS52749 | Contingent Approval to Interconnect | 100 Year 1 | BS40174 | Contingent Approval to Interconnect | 192.5 Year 3 February | BS46904 | Contingent Approval to Interconnect | 112.5 Year 3 August | BS48680 | Contingent Approval to Interconnect | 150 Year 4 Feb | BS50708 | Contingent Approval to Interconnect | 200 Year 4 Feb | BS50713 | Contingent Approval to Interconnect | 200 Year 4 Feb | BS50728 | Contingent Approval to Interconnect | 75 Year 4 Feb | BS50773 | Contingent Approval to Interconnect | 200 Year 4 Feb | BS50789 | Contingent Approval to Interconnect | 34.6 Year 3 August | NM48869 | Contingent Approval to Interconnect | 300 Year 4 Feb | NM51067 | Contingent Approval to Interconnect | 240 Year 3 February | NS46913 | Contingent Approval to Interconnect | 75 Year 3 August | NS48651 | Contingent Approval to Interconnect | 100 Year 4 Feb | NS50762 | Contingent Approval to Interconnect | 33.3 Year 5 February | NS54456 | Contingent Approval to Interconnect | 50 Year 3 August | BM49130 | Facility Study Started | 966 Year 4 Feb | BM51019 | Impact Study Started | 966 Year 2 August | BM45696 | Interconnection Agreement Sent - Customer Action Required | 840 Year 4 February | BL51064 | Interconnection Validation | 3000 Year 4 Feb | BS50714 | Interconnection Validation | 200 Year 4 Feb | BS50742 | Interconnection Validation | 100 Year 5 February | BS54632 | Interconnection Validation | 60 Year 5 February | BS54636 | Interconnection Validation | 100 Year 4 Feb | BS50775 | NRES - Bid Selected | 106 Year 4 Feb | NS50659 | NRES - Bid Selected | 30 Year 3 August | BL49128 | NRES - PURA Approved | 1000 Year 1 | BM40275 | NRES- Bid Evaluation | 600 Year 2 February | BM43664 | NRES - PURA Approved | 250 Year 2 August | BM45726 | NRES - PURA Approved | 350 Year 2 August | BM45728 | NRES - PURA Approved | 562.5 Year 2 August | BM45731 | NRES - PURA Approved | 300 Year 2 August | BM45734 | NRES - PURA Approved | 580 Year 3 February | BM47265 | NRES - PURA Approved | 669.6 Year 3 August | BM49125 | NRES - PURA Approved | 700 Year 3 August | BM49127 | NRES - PURA Approved | 330 Year 3 August | BM49129 | NRES - PURA Approved | 206 Year 4 Feb | BM51062 | NRES - PURA Approved | 999 Year 4 Aug | BM53121 | NRES - PURA Approved | 216 Year 4 Aug | BM53137 | NRES - PURA Approved | 456 Year 4 Aug | BM53138 | NRES - PURA Approved | 556 Year 5 February | BM54627 | NRES - PURA Approved | 600 Year 5 February | BM54646 | NRES - PURA Approved | 400 Year 5 February | BM54647 | NRES - PURA Approved | 999 Year 1 | BS40269 | NRES - Bid Evaluation | 199.8 Year 2 February | BS43220 | NRES - PURA Approved | 50 Year 2 February | BS43223 | NRES - PURA Approved | 200 Year 2 February | BS43224 | NRES - PURA Approved | 200 Year 2 February | BS43225 | NRES - PURA Approved | 150 Year 2 February | BS43230 | NRES - PURA Approved | 200 Year 2 February | BS43236 | NRES - PURA Approved | 200 Year 2 February | BS43240 | NRES - PURA Approved | 200 Year 2 February | BS43241 | NRES - PURA Approved | 75 Year 2 August | BS45170 | NRES - PURA Approved | 200 Year 2 August | BS45178 | NRES - PURA Approved | 100 Year 3 February | BS46921 | NRES - PURA Approved | 200 Year 3 February | BS46922 | NRES - PURA Approved | 100 Year 3 February | BS47013 | NRES - PURA Approved | 150 Year 3 February | BS47015 | NRES - PURA Approved | 120 Year 3 February | BS47021 | NRES - PURA Approved | 199.99 Year 3 February | BS47022 | NRES - PURA Approved | 199.99 Year 3 August | BS48674 | NRES - PURA Approved | 200 Year 3 August | BS48685 | NRES - PURA Approved | 200 Year 3 August | BS48714 | NRES - PURA Approved | 200 Year 3 August | BS48730 | NRES - PURA Approved | 200 Year 3 August | BS48739 | NRES - PURA Approved | 60 Year 3 August | BS48740 | NRES - PURA Approved | 40 Year 4 Feb | BS50672 | NRES - PURA Approved | 150 Year 4 Feb | BS50757 | NRES - PURA Approved | 80 Year 4 Feb | BS50768 | NRES - PURA Approved | 100 Year 4 Aug | BS52654 | NRES - PURA Approved | 200 Year 4 Aug | BS52727 | NRES - PURA Approved | 100 Year 4 Aug | BS52733 | NRES - PURA Approved | 32.5 Year 4 Aug | BS52759 | NRES - PURA Approved | 100 Year 4 Aug | BS52761 | NRES - PURA Approved | 200 Year 4 Aug | BS52765 | NRES - PURA Approved | 120 Year 5 February | BS54393 | NRES - PURA Approved | 75 Year 5 February | BS54420 | NRES - PURA Approved | 200 Year 5 February | BS54422 | NRES - PURA Approved | 100 Year 5 February | BS54423 | NRES - PURA Approved | 200 Year 5 February | BS54424 | NRES - PURA Approved | 200 Year 5 February | BS54452 | NRES - PURA Approved | 200 Year 5 February | BS54455 | NRES - PURA Approved | 50 Year 5 February | BS54468 | NRES - PURA Approved | 100 Year 5 February | BS54591 | NRES - PURA Approved | 200 Year 5 February | BS54609 | NRES - PURA Approved | 200 Year 4 August | NE53113 | NRES - PURA Approved | 460 Year 4 August | NE53142 | NRES - PURA Approved | 2925 Year 1 | NM40290 | NRES - Bid Evaluation | 240 Year 2 February | NM43662 | NRES - PURA Approved | 448 Year 2 February | NM43665 | NRES - PURA Approved | 260 Year 2 August | NM45703 | NRES - PURA Approved | 300 Year 4 Feb | NM51063 | NRES - PURA Approved | 760 Year 5 February | NM54648 | NRES - PURA Approved | 720 Year 2 February | NS43227 | NRES - PURA Approved | 175 Year 2 February | NS43253 | NRES - PURA Approved | 165 Year 2 August | NS45168 | NRES - PURA Approved | 200 Year 3 February | NS46883 | NRES - PURA Approved | 25 Year 3 February | NS46912 | NRES - PURA Approved | 200 Year 3 February | NS47025 | NRES - PURA Approved | 18.43 Year 3 August | NS48583 | NRES - PURA Approved | 66.8 Year 3 August | NS48690 | NRES - PURA Approved | 50 Year 4 Feb | NS50649 | NRES - PURA Approved | 20 Year 4 Feb | NS50650 | NRES - PURA Approved | 34.6 Year 4 Feb | NS50734 | NRES - PURA Approved | 16.15 Year 4 Feb | NS50780 | NRES - PURA Approved | 100 Year 4 Feb | NS51068 | NRES - PURA Approved | 25.2 Year 4 Aug | NS53136 | NRES - PURA Approved | 33.3 Year 5 February | NS54464 | NRES - PURA Approved | 50 Year 5 February | NS54565 | NRES - PURA Approved | 18 Year 5 February | NS54639 | NRES - PURA Approved | 200 Year 3 February | BS46952 | Pending Electrical Inspector Release | 50 Year 3 February | BS46963 | Pending Electrical Inspector Release | 200 Year 4 Feb | BS50641 | Pending Electrical Inspector Release | 80 Year 4 Aug | BS52565 | Pending Electrical Inspector Release | 37.63 Year 4 Aug | BS52566 | Pending Electrical Inspector Release | 11.52 Year 4 Aug | BS52632 | Pending Electrical Inspector Release | 200 Year 3 February | NM47217 | Pending Electrical Inspector Release | 480 Year 4 Feb | NS50663 | Pending Electrical Inspector Release | 7.6 Year 4 Aug | NS52757 | Pending Electrical Inspector Release | 50 Year 4 Feb | BM51020 | Pending Facility Study | 966 Year 4 Feb | BM51066 | Pending Facility Study | 480 Year 4 Feb | BS50705 | Pending Meter Installation | 22.8 Year 4 Feb | BS50686 | Pending Witness Test | 200 Year 5 February | BL54611 | Study In Process | 4999 Year 4 Feb | BM50765 | Technical Re-Review | 269 Year 5 February | BS54437 | Technical Re-Review | 200 Year 5 February | BM54614 | Technical Review | 960 Year 5 February | BM54616 | Technical Review | 960 Year 5 February | BM54620 | Technical Review | 480 Year 5 February | BM54621 | Technical Review | 300 Year 5 February | BM54622 | Technical Review | 500 Year 5 February | BM54625 | Technical Review | 600 Year 5 February | BS54615 | Technical Review | 120 Year 5 February | BS54623 | Technical Review | 100 Year 5 February | BS54624 | Technical Review | 150 Year 5 February | BS54626 | Technical Review | 120 Year 5 February | BS54628 | Technical Review | 150 Year 5 February | BS54629 | Technical Review | 300 Year 5 February | BM54634 | Technical Review | 360 Year 5 February | BS54466 | Technical Review | 200 Year 5 February | BS54467 | Technical Review | 200 Year 2 August | BM45730 | Technical Review Feedback– Customer Action Required | 670 Year 3 February | BM47259 | Technical Review Feedback– Customer Action Required | 999 Year 3 August | BS48720 | Technical Review Feedback– Customer Action Required | 99.9 Year 4 Feb | BS50739 | Technical Review Feedback– Customer Action Required | 200 Year 4 Feb | BS50767 | Technical Review Feedback– Customer Action Required | 200 Year 5 February | BS54441 | Technical Review Feedback– Customer Action Required | 200 Year 5 February | BS54451 | Technical Review Feedback– Customer Action Required | 200 Year 2 August | BM45733 | Validation On Hold | Corrections Required | 360 Year 3 February | BS47020 | Validation On Hold | Corrections Required | 100 Year 3 August | BS48722 | Validation On Hold | Corrections Required | 200 Year 4 Aug | BS52723 | Validation On Hold | Corrections Required | 200 Year 4 Aug | BS52724 | Validation On Hold | Corrections Required | 200 Year 4 Aug | BS52725 | Validation On Hold | Corrections Required | 50 Year 4 Aug | BS52726 | Validation On Hold | Corrections Required | 200 Year 4 Feb | NS50781 | Validation On Hold | Corrections Required | 75 Year 5 February | BS54436 | Validation On Hold | Corrections Required | 199.8 Year 2 February | BL43623 | Withdrawn | 960 Year 2 February | BL43625 | Withdrawn | 840 Year 2 August | BL45740 | Withdrawn | 990 Year 2 February | BM43624 | Withdrawn | 500 Year 2 February | BM43650 | Withdrawn | 996 Year 1 | BS40175 | Withdrawn | 60 Year 2 February | BS43229 | Withdrawn | 200 Year 3 February | BS46994 | Withdrawn | 200 Year 3 February | BS47018 | Withdrawn | 200 Year 4 Feb | BS50688 | Withdrawn | 100 Year 4 Feb | BS50689 | Withdrawn | 200 Year 1 | NM40285 | Withdrawn | 390 Year 2 August | NS45177 | Withdrawn | 50 Year 3 August | NS48725 | Withdrawn | 200