Question(s) Answered 5 thru 7 (CL&P dba Eversource Energy Joint with UI)(Supplemental/Revision) Date Filed: 10/05/2026
Files3
CL&P dba Eversource Energy and UI
Docket 26-08-03
Set PURA-01
Date Issued September 21, 2026
CAE-005
Page 1 of 1
Date Filed: October 05, 2026
Witness:
Rice, Brian J and Miller, Katerina
Request from: Public Utilities Regulatory Authority
Question:
Motion No. 32 Ruling, Aug. 13, 2026, Docket No. 24-08-03; Motion No. 5, Att. 2b, p. 36. Section
8.1.1 of the Program Manual states that, for Buy-All projects, the production meter and revenue
meter may be the same meter. Would the EDCs recommend editing or removing this section to
avoid future disputes like that discussed in Motion No. 32 in Docket No. 24-08-03?
Response:
The EDCs recommend editing, rather than removing, Section 8.1.1 of the Program Manual.
Currently, Section 8.1.1 provides that, for Buy-All Projects, the Production Meter and Revenue
Meter may be the same meter.
The EDCs propose revising Section 8.1.1 to clarify that, for Buy-All Projects, the Production
Meter will also serve as the EDC Revenue Meter for purposes of associated billing. The EDCs
further recommend expressly stating that the provision addresses the metering and billing
configuration and is not an eligibility requirement.
The proposed revision is 8.1.1. Projects shall be equipped with a Production Meter to measure the
amount of energy produced from Customer Projects, which will be located at or behind the EDC’s
Delivery Point. In addition, there is a Revenue Meter that measures energy exports and imports to
and from the distribution system. For Buy-All Projects, the Production Meter shall also serve as
the EDC Revenue Meter for purposes of associated billing, and no separate Revenue Meter shall
be required. This provision addresses the metering and billing configuration for Buy-All Projects
and is not an eligibility requirement.
The EDCs believe this clarification would reduce the potential for Section 8.1.1 to be interpreted
as establishing or modifying eligibility requirements, while retaining the provision to clearly
describe the metering and billing arrangement applicable to Buy-All Projects.