A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority
CorrespondenceFiled by Avangrid

Tech Meeting 1 Presentation Joint

Part of

Docket 26-08-04Open

Annual Shared Clean Energy Facility Program Review - Year 8

Type of filing
Correspondence
Date filed
September 14, 2026
Filed by
Avangrid
Files
1
As listed on the current system: Corres. 09/14/2026 [26-08-04] (Avangrid) - Tech Meeting 1 Presentation Joint

This filing on the current system (opens in a new tab)

Files

Text of 2026-09-14 Tech Meeting 1 Presentation Joint UI and Eversource #26-08-04.pdf

Extracted from the file · 2,617 characters
Technical Meeting No. 1 Annual Shared Clean Energy Facility Program Review – Year 8 Docket. No. 26-08-04 September 17, 2026 Presenters: Eversource – Aaron Dubauskas – Manager of Operations, Customer Solar Programs Eversource – Isabelle Hazlewood – Program Manager, Solar Programs The United Illuminating Company – Katerina Miller – Manager, Electric Supply The United Illuminating Company – John King - Analyst, Wholesale Power The United Illuminating Company – Alexandra Torrealba - Customer Programs & Products Manager Discussion Topics 1 • SCEF Year 8 Procurement Price Caps 2 • SCEF Year 8 Procurement Budgets 3 • SCEF Year 8 Bid Preferences 4 • SCEF Year 8 Proposed Programmatic Changes 2 SCEF Year 8 Procurement Price Caps ▪ The EDCs support DEEP’s recommendation ▪ Maximum selected purchase price for the same resources in the prior year's RFP ▪ $182.93/MWh ▪ Higher than proposed NRES Large Zero buy-all Price Cap ▪ Adjustment by the Authority where necessary for changing conditions ▪ One Price Cap for all project types ▪ Continue to allow Carport/Canopy Projects to Bid above standard Price Cap ▪ Eversource significantly oversubscribed ▪ $13 million to award/$23 million received in Bids ▪ UI undersubscribed 3 Procurement Budgets ▪ Maintain existing EDC-specific budget allocations ▪ Current allocations reflect estimated compensation obligations from prior procurements ▪ $9.86 Million for Eversource ▪ $5.71 Million for UI ▪ 80/20 reallocation would increase Eversource's allocation by approximately $2.6 million ▪ Contrary to established methodology to control costs 4 SCEF Year 8 Bid Preferences ▪ The Companies recommend maintaining Bid Preference categories and amounts established in PURA’s Year 7, Final Decision in Docket No. 25-08-04. ▪ 40% Bid Preference – Solar Canopy Projects ▪ 20% Bid Preference – Landfill/Brownfield Projects ▪ Maintain existing categories and Bid Preference levels ▪ Existing Bid Preferences have demonstrated meaningful participation without evidence that an increase is necessary 5 SCEF Year 8 Proposed Programmatic Changes ▪ Given the maturity of the SCEF Program and its final Program year, the EDCs recommend maintaining the existing Program framework. ▪ Submitted redlines included only updates for consistency and elimination of ambiguity ▪ Any changes should be limited to discrete clarifications that improve consistency and eliminate uncertainty 6 Questions? 7 Contacts Eversource SCEF Program United Illuminating SCEF Program [email removed] [email removed] Eversource.com/SCEF United Illuminating SCEF Program webpage 8