Paschaline Poku
Email:[email removed]
November 2nd , 2026
Public Utilities Regulatory Authority
Ten Franklin Square
New Britain, Connecticut 06051
Re: Docket No. 26-08-04: ANNUAL SHARED CLEAN FACILITY ENERGY SOLUTIONS
PROGRAM REVIEW
Dear Commissioners,
The Office of Consumer Counsel (“OCC”) respectfully submits this letter in lieu of written
exceptions in response to the Public Utilities Regulatory Authority’s (“Authority”) Proposed Final
Decision (“PFD”), issued on October 19th, 2026, in the above-referenced docket.
OCC supports the PFD’s core determinations, consistent with the positions OCC set out in
its written comments (“OCC Comments”), 1 and offers the following limited exceptions to clarify
several points that bear on ratepayer costs in the Program’s final year.
I.
The $179.00/MWh Price Cap Should Rest on Year 7’s Record
The PFD reasonably finds that the record does not establish that federal trade and tax
actions have rendered a $179.00/MWh cap economically unviable, and that potential future cost
impacts remain speculative. 2 The Authority in its analysis ties this price cap to the NRES large
buy-all price cap recommended in Docket No. 26-08-03. 3 Because the NRES cap has not yet been
adopted, OCC asks that the Final Decision clarify that the SCEF cap stands on its own.
The PFD analysis of the Year 7 results supports the cap independently. Also, nine of the
thirteen selected projects bid below the $179.00/MWh in Eversource’s territory, the median
selected bid was $161.00/MWh, and the average was $179.00/MWh; and United Illuminating
Company’s (UI) higher prices reflected limited competition, with only two bidders and all three
OCC Written Comments, Docket No. 26-08-04, September 14, 2026, p.1-3
DEEP Compliance, September 1, 2026, see also OCC Comments p.2
3
PFD, p.7 citing Motion No. 4, July 29, 2026, p.3
1
2
qualified bids selected. 4 The Final Decision should state that the Year 8 SCEF cap will not change
if the Authority adopts a different NRES cap in Docket No. 26-08-03.
II.
The Authority Should Confirm that the Table 1 Allocation is an Absolute Ceiling
OCC agrees that the EDC-specific allocations should operate as hard caps. 5 However, the
PFD states that the EDCs shall not exceed their allocations “after accounting for unused,
terminated, withdrawn or reduced-size projects.” 6 That language could be read to permit an EDC
to increase its Year 8 budget by the value of terminated prior year projects. 7 In Year 7, Eversource
increased its $9,864,750.81 budget by $3,082,758.17 on that basis. 8 If a familiar adjustment is
permitted for Year 8, actual commitments could exceed the amounts shown in Table 1 of the PFD
by a substantial margin. 9
OCC requests that the Final Decision state whether Table 1 amounts are the maximum
amounts each EDC may commit to in Year 8. If the Authority intends to allow adjustments for
terminated or withdrawn prior-year projects, the Final Decision should state how those adjustments
are calculated and confirm that they cannot raise combined program commitments above the
aggregated budget of $15,568,449.47. 10 The amended Standing Order No. 9, which requires a
breakdown of any budget cap adjustments methodology, 11 is helpful but it applies only after
selections have been made.
III.
The Final Decision Should Address Unused Year 7 Funds
The Year 7 Decision provided that, if an EDC’s 2026 selection falls below its budget “the
remaining uncommitted funds shall roll over and be available for use in the final capital SCEF
Program in 2027”. 12 UI’s Year 7 solicitation drew limited interest. In the first round, UI selected
only 7.49MW of its 10MW allocation, 13 and the bids it received would have used less than half of
its Year 7 budget, prompting a second procurement round. 14 The PFD does not address whether
any UI funds left uncommitted after that round will carry into Year 8, or if they do, how they fit
Motion No. 6, Docket No. 25-08-04, Att. B May 15, 2026, see also Motion No. 7, Docket No. 25-08-04, Att. B,
June 18, 2026
5
PFD p.12
6
Id.
7
The PFD’s description of the budget-cap adjustment is consistent with the Authority’s Year 7 decision, which
permitted the EDCs to adjust the 2027 budget caps “to account for projects that are terminated, withdrawn, or
installed at sizes different from those originally proposed in prior solicitation years.” Final Decision, Docket No. 2508-04, Annual Shared Clean Energy Facility Program Review Year 7 (“Year 7 Decision”), Dec. 17, 2025, p. 10. In
exercising its authority under General Statutes § 16-244z(c)(1)(A), the Authority must also consider ratepayer cost
impacts consistent with General Statutes § 16-19e(a). Id., p. 9, fn. 3.
4
DEEP Comments, September 14, 2026, p.2
PFD, p.13
10
PFD, p.13, see also OCC Comments,p.3 where the combined cap is the operative protection for nonparticipating
ratepayers; OCC Written Comments Docket No. 25-08-04, Oct 2, 2025
11
PFD, p.21
12
Year 7 Decision, p. 10
13
Motion No. 6, Docket No. 25-08-04, Att. B, May 15, 2026
14
Id p. 9 citing DEEP Comments, p. 1-2, September 14, 2026
8
9
within the reallocated 80/20 split. OCC raised this question in its comments, 15 and Verogy
recommended that unused Year 7 amounts be allocated on an 80/20 basis rather than rolling
forward exclusively into UI’s Year 8 allocation. 16
OCC believes that without clarification, UI’s rolled over Year 7 funds could be added to
its $3,114,929.09 Year 8 allocation, which will undercut the 80/20 reallocation split that the PFD
adopts. 17 OCC therefore recommends that the final decision clearly direct that any uncommitted
Year 7 funds be included within the $15,568,449.47 aggregate budget and divided on the same
80/20 basis, or (b) clarify that the Year 8 allocation in Table 1 already accounts for all rollover
amounts.
IV.
Capacity Forfeited by Year 8 Bidders Should Expire Given Successor Programs
OCC appreciates the PFD’s confirmation that given the program is in its final year, “any
unallocated budget will expire and not roll over into a subsequent program year”. 18 That provision
addresses a budget that is never awarded. It does not clearly address budget or capacity associated
with a Year 8 project that is selected and is later withdrawn or terminated. The program manual
provides that capacity “foregone by a selected bidder choosing not to move forward with their bid
shall be reallocated to the program capacity of the upcoming solicitation”. 19 No solicitation follows
Year 8. 20 Therefore, the Final Decision should confirm that budget and capacity forfeited by Year
8 projects also expire and will not carry into any successor program absent further Authority action
in Docket No. 26-06-04, Implementation of Clean Energy Successor Programs.
***
OCC appreciates the opportunity to submit these Written Exceptions and thanks the
Authority and parties for their work in this docket.
OCC Comments p.3
PFD, p.10 citing Verogy Comments, September 14, 2020,p.3
17
PFD, p. 12
18
Id, p. 16 citing Motion No. 2, Att. 1, August 31, 2026, p.11.
19
Year 7 Decision, p. 10, fn. 7; quoting Motion No. 4, Docket No. 24-08-04, Att.1,December 31, 2024, p. 11
20
See General Statutes § 16-244z(a)(1)(C); PD, p. 1, fn. 1
15
16
Respectfully submitted,
STATE OF CONNECTICUT OFFICE
OF CONSUMER COUNSEL
CLAIRE E. COLEMAN
CONSUMER COUNSEL
By: /s/ Paschaline Poku
Paschaline Poku
Staff Attorney
John Viglione
Associate Economist
Anu Kumaria
Research Analyst
CERTIFICATE OF SERVICE
I do hereby certify that on this day the foregoing document was filed with the Public Utilities
Regulatory Authority, and copies thereof were served upon each person designated on the official
service list in this proceeding in accordance with R.C.S.A. § 16-1-15.
Dated at New Britain, Connecticut this 2nd day of November 2026.
/s/Paschaline Poku
Commissioner of the Superior Court
As listed on the current system
Exception to Decision filed 11/02/2026 (OCC) [26-08-04]