ExceptionFiled by Verogy Holdings, LLC
Written Exceptions
- Type of filing
- Exception (Written Exceptions)
- Date filed
- November 2, 2026
- Filed by
- Verogy Holdings, LLC
- Files
- 1
As listed on the current system: Exception to Decision filed 11/02/2026 (Verogy Holdings, LLC) [26-08-04]
Files
Verogy SCEF Year 8 Written Exceptions 2026.11.02.pdf
PDF · 152 KB · 3 pagesText searchable
Download Verogy SCEF Year 8 Written Exceptions 2026.11.02.pdfRead the text of Verogy SCEF Year 8 Written Exceptions 2026.11.02.pdf
Text of Verogy SCEF Year 8 Written Exceptions 2026.11.02.pdf
Extracted from the file · 4,449 characters
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
ANNUAL REVIEW OF STATEWIDE SHARED :
CLEAN ENERGY FACILITY PROGRAM
:
REQUIREMENTS – YEAR 8
:
DOCKET NO 26-08-04
NOVEMBER 2, 2026
RESPONSE TO AUTHORITY’S REQUEST FOR WRITTEN EXCEPTIONS ISSUED
OCTOBER 19, 2026
Verogy Holdings, LLC (“Verogy”) respectfully submits the following written exceptions to the Annual
Shared Clean Energy Facility Program Review – Year 8 Proposed Final Decision (“The Proposed Decision”)
issued by the Public Utilities Regulatory Authority (“The Authority”) dated October 19, 2026, intended to
align the Shared Clean Energy Facility (“SCEF”) Program with Program Objectives1 and other Connecticut
climate goals.
Please find Verogy’s exceptions below:
1. PRICE CAP
a) Exception: Section IV.B.4 of The Proposed Decision states in part:
“The Year 8 SCEF price cap shall be set at $179.00/MWh, consistent with the recommended
NRES large buy-all price cap.”
Verogy strongly disagrees with establishing SCEF price caps based on results from the
NRES procurements. As stated in Verogy’s written comments dated September 14, 20262 filed
in the subject docket, Verogy asserts that SCEF price caps should increase due to changed
circumstances outside of SCEF Program participants control including newly imposed tariffs
amongst other reasons.
1
The objectives (Program Objectives) outlined in the Year 5 SCEF Final Decision include:
1. Annually and cost-effectively procure up to 50 megawatts of SCEFs, as defined in Conn. Gen. Stat § 16-244z;
2. Provide savings to specific categories of customers, particularly customers with low- to moderate-income (LMI), lowincome service organizations, and customers who reside in environmental justice communities; and
3. Lower or eliminate barriers to entry for Subscriber Organizations, if and when possible.
2
Written Comments for [ 26-08-04 ] date filed 09/14/2026 [ ]
1
Notwithstanding this assertion, should The Authority determine that newly imposed
tariffs and other economy-wide inflationary pressures are insufficient to increase price caps,
The Authority’s proposed ruling to decrease SCEF price caps based on results from a separate
program when there is already a defined process to establish price caps represents flawed
thinking and contradicts established precedent and guidelines ruling SCEF price caps.
Verogy’s rationale for this assertion is twofold. First, there are several differentiating
features and rules that make the SCEF and NRES programs unique which have not been
“levelized” by The Authority. Second, this proposed decision contradicts pre-existing SCEF
program documentation and statute governing establishment of price caps.
There are several examples of distinction between the SCEF and NRES programs
which have not been reconciled by The Authority to date. These include canopy bid preference
levels (40% in SCEF vs 30% in NRES), the presence of an Operating Period Security deposit
in SCEF vs the absence of one in NRES, the lack of a Distressed Municipality bid preference
in SCEF vs the presence of one in NRES, and others. Despite some similarities, the SCEF and
NRES programs are clearly distinct and therefore The Authority should not unilaterally use
results from one program to dictate the framework of the other.
Second, as described in DEEP’s SCEF Year 8 recommendations filed September 1,
2026 in the subject docket3, Conn. Gen. Stat. § 16-244z(a)(5) prescribes a price cap as the
highest selected bid price from the previous SCEF procurement. The highest selected bid price
from the SCEF Year 7 procurement, as of the time of these exceptions, is $182.93/MWh.
Therefore, Verogy asserts that The Authority’s proposed price cap of $179.00/MWh
contradicts Conn. Gen. Stat. § 16-244z(a)(5).
Should The Authority judge that there are no changed circumstances to justify an
increase to the SCEF price cap, then The Authority should defer to existing precedent and
statute to establish the SCEF Year 8 price cap at $182.93/MWh.
3
Compliance Filings for [ 26-08-04 ] dated 09/01/2026 [ Compliance Order No.15 ]
2
I certify that a copy of this submission has been filed with the Authority as an electronic web filing
and is complete. Verogy thanks the Authority for the opportunity to provide written exceptions for
consideration in the SCEF Year 8 program development.
Respectfully submitted,
William Herchel
CEO
Verogy Holdings, LLC