To CL&P; UI, questions 1 thru 3
Filed by CAE
- Type of filing
- Interrogatory (Interrogatories)
- Date filed
- August 25, 2026
- Filed by
- CAE
- Files
- 1
As listed on the current system
Interrogs from CAE to CL&P;UI 1 thru 3-Issued 08/25/2026 [26-08-04]
Files1
26-08-04 Interrogatory Set 1.pdf
PDF · 153 KB · 3 pagesText searchable
Download 26-08-04 Interrogatory Set 1.pdfRead the text of 26-08-04 Interrogatory Set 1.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
August 25, 2026
In reply, please refer to:
Docket No. 26-08-04
Re: Docket No. 26-08-04 – Annual Shared Clean Energy Facility Program Review –
Year 8
Enclosed are interrogatories numbered CAE-1 through CAE-3, directed
individually to the Connecticut Light and Power Company d/b/a Eversource Energy
(Eversource) and The United Illuminating Company (UI; together with Eversource, the
EDCs).
The responses to these questions have been deemed necessary by the Public
Utilities Regulatory Authority (Authority) in connection with the above-referenced docket
and will become a part of the record in this proceeding. Please note that persons
responsible for responses must be available for cross-examination during a hearing, if
held, and must attest to the truth and accuracy of their responses.
Please submit the responses to the Authority’s Executive Secretary no later than
September 14, 2026, at 4:00 p.m. The Authority encourages the submission of
responses as soon as they are available rather than delaying until all answers are
completed. Please list each question and answer on the same sheet of paper using
a separate sheet for each interrogatory number, and sequentially number the pages
of each response (e.g., p. 1 of 5, etc.). At the top of each page, clearly identify the
Docket Number, the interrogatory number (including the prefix), the name of the
company and the person responsible for the response, and the date of submission.
Similarly, each Late Filed Exhibit that may be submitted after hearing in this
docket shall be sequentially numbered and identified with the Docket Number, Late
Filed Exhibit Number, page number, the name of the company and the person
responsible for the exhibit, and the date of submission.
If a response to any of the requested information has already been filed in response
to another Parties’ interrogatory(ies) in this proceeding, please reference the interrogatory
which provides the information. It is the respondent’s responsibility to ensure that any
such information is on file with the Executive Secretary of the Authority.
ELECTRONIC SUBMISSION OF FILINGS
IMPORTANT NOTE: The Authority has indefinitely suspended the paper
copy filing requirement. Anyone filing material with the Authority should file only
an electronic copy through the PURA Web Filing System. Please refer to the
Electronic Filing webpage for more information, including on confidential
materials: Make An Electronic Filing
CONFIDENTIAL DOCUMENTS
No confidential material may be filed publicly through the web filing system.
Confidential material can be filed electronically by emailing the material to
[email removed] with a subject line labeled in all capital letters “CONFIDENTIAL
MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic
confidential information shall also contain a header “CONFIDENTIAL – NOT FOR
PUBLIC DISCLOSURE.” The motion for a protective order shall be filed electronically.
The Authority operates with the strong presumption that all documents filed with it
are public records subject to the right of public inspection and copying in accordance with
the Connecticut Freedom of Information Act, Conn. Gen. Stat. §1-200 et. seq. In those
exceptional circumstances where a participant believes that information it intends to file
is confidential under law, it may file a Motion for a Protective Order requesting an
exemption from public disclosure. The Motion must provide specific legal arguments with
reference to state or federal law describing with supporting facts why the information
should be kept confidential. A certified affidavit supplied by a competent witness in
support of the Motion must be appended to the Motion. The Authority will rule on the
Motion forthwith, and it will give further direction as necessary.
The current service list for this docket is available on the Authority's website
located at http://www.dpuc.state.ct.us/DPUCPublicList.NSF.
By the Direction of the Authority,
PUBLIC UTILITIES REGULATORY AUTHORITY
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Enclosure
cc:
Service List
Docket No. 26-08-04
Annual Shared Clean Energy Facility Program Review – Year 8
Interrogatories CAE-1 through CAE-3 are directed individually to The Connecticut
Light and Power Company d/b/a Eversource Energy (Eversource) and The United
Illuminating Company (UI; collectively, the EDCs).
CAE-1
Motion No. 6, May 15, 2026, Docket No. 25-08-04, Annual Shared Clean
Energy Facility Program Review – Year 7, Att. B; Motion No. 7, June 18,
2026, Docket No. 25-08-04, Att. B. Explain how the EDCs calculate the
expected annual production of Shared Clean Energy Facility (SCEF)
Program projects, including the assumptions used. Justify the methodology
and explain whether it continues to provide a reasonable estimate of actual
annual production.
CAE-2
Motion No. 6, May 15, 2026, Docket No. 25-08-04, Att. B; Motion No. 7,
June 18, 2026, Docket No. 25-08-04, Att. B. Based on the EDCs’
experience with SCEF Program projects currently in service, state whether
actual annual production has differed materially from the production
originally estimated by the EDCs. If so, quantify the differences, identify the
factors contributing to those differences (if known), and explain whether the
EDCs recommend any changes to the methodology for calculating
expected annual production. In particular, explain whether any changes are
warranted in light of the SCEF Program’s use of a budgetary cap.
CAE-3
Decision, Nov. 6, 2024, Docket No. 24-08-03, Annual Non-Residential
Renewable Energy Solutions Program Review – Year 4, pp. 8–9. Based
on the EDCs’ experience administering the SCEF Program, evaluate
whether developers are sufficiently aware of the requirements of Public Act
No. 21-43, An Act Concerning A Just Transition To Climate-Protective
Energy Production And Community Investment, codified as General
Statutes § 31-53d, (Public Act 21-43) particularly the prevailing wage
requirements applicable to projects of two megawatts (MW) or greater. If
the EDCs have observed insufficient awareness or compliance with these
requirements, provide a recommendation on whether the SCEF Program
Manual should be revised to include a more explicit reference to the
applicable requirements of Public Act No. 21-43.