Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Compliance Filing

Compliance filingFiled by Eversource Energy5 files
Part of docket 26-08-05Open
  • Electric
Annual Energy Storage Solutions Program Review- Year 6

Files5

107 Selden Street, Berlin, CT 06037 P.O. Box 270, Hartford, CT 06141-0270 Jennifer E. Galiette Senior Counsel [phone removed] [email removed] July 31, 2026 Mr. Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 RE: Docket No. 26-08-05 – Annual Energy Storage Solutions Program Review – Year 6 Compliance with Order No. 15 of Docket No. 25-08-05 (Interconnection Report) Dear Mr. Gaudiosi: The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource”) hereby submits an Energy Storage Solutions (“ESS”) C&I Interconnection Status Report to the Public Utilities Regulatory Authority (“PURA”) in compliance with Order No. 15 of the Authority’s final decision dated December 4, 2024 in Docket No. 24-08-05. Specifically, Order No. 15 states: No later than August 1, 2024, and annually thereafter, each EDC shall file as compliance Reference Decision, Nov. 29, 2023, Docket No. 23-08-05, Order No. 26, p. 62: No later than August 1, 2024, and annually thereafter, until the ESS program stops accepting new enrollments, each EDC shall file as compliance an ESS Interconnection Report, as detailed in Section IV.D., in the applicable annual review proceeding (i.e., in 2024, Docket No. 2408-05). The Report shall consist of a summary of the state of interconnection for all commercial ESS projects and shall include, at a minimum: (1) the interconnection status of each commercial ESS project; (2) the expected EDC interconnection approval due date for each commercial project per EDC interconnection guidelines, as applicable; (3) the date all required interconnection materials were submitted to the utility for each commercial ESS project; (4) the number of days from when all required interconnection materials were submitted to the utility for each commercial ESS project up to the completion of the interconnection process; (5) the attrition rate for all commercial ESS projects, based on the withdrawal of a project’s interconnection application; (6) a list of the most common reasons for ESS interconnection delays; and (7) EDC-proposed solutions for each of the most common reasons delaying ESS interconnections. Pursuant to Order No. 15, Eversource’s ESS Interconnection Report is included as Attachment 1 hereto. Attachment A shows the interconnection status of each commercial ESS project. Attachment B shows the number of days from when all required interconnection materials were submitted to the utility for each commercial ESS project up to the completion of the interconnection process. If you have any questions concerning this filing, please do not hesitate to contact Jennifer Runyon, Energy Efficiency Consultant, Eversource Energy, [email removed]. Sincerely, Jennifer E. Galiette Jennifer E. Galiette Senior Counsel On Behalf of CL&P dba Eversource Energy 2|P a g e

As listed on the current system

Compliance Filings, 07/31/2026 [26-08-05] Order No.No 15 in Compliance with DN 25-08-05 / Eversource Energy / Compliance Filing

This filing on the current system (opens in a new tab)