compliance - CT Green Bank
Filed by Connecticut Green Bank
- Type of filing
- Compliance filing (Compliance Filing, Order No. 9)
- Date filed
- August 3, 2026
- Filed by
- Connecticut Green Bank
- Files
- 2
As listed on the current system
Compliance Filings, 08/03/2026 [26-08-05] Order No.9 / Connecticut Green Bank / compliance - CT Green Bank
Files2
Docket No. 25-08-05 PURA Compliance Filing Order 9.pdf
PDF · 89 KB · 4 pagesText searchable
Download Docket No. 25-08-05 PURA Compliance Filing Order 9.pdfRead the text of Docket No. 25-08-05 PURA Compliance Filing Order 9.pdf
Docket No. 25-08-05 Order 9 Attachment 1.xlsx
Excel · 58 KBText searchable
Download Docket No. 25-08-05 Order 9 Attachment 1.xlsxRead the text of Docket No. 25-08-05 Order 9 Attachment 1.xlsx
July 28, 2026
Via Electronic Filing
Mr. Jeffrey R. Gaudiosi, Esquire
Executive Secretary
Public Utilities Regulatory Authority
10 Franklin Square
New Britain, CT 06051
Re:
Docket No. 25-08-05, Annual Energy Storage Solutions Program Review – Year 5
Compliance with Order No. 9 of the Final Decision in Docket No. 25-08-05
Docket No. 26-08-05, Annual Energy Storage Solutions Program Review – Year 6
Compliance with Order No. 9 of the Final Decision in Docket No. 25-08-05
Dear Mr. Gaudiosi:
The Connecticut Green Bank (“Green Bank”) respectfully submits to the Public Utilities
Regulatory Authority (“PURA” or the “Authority”) their compliance with Order No. 9 of the Final
Decision issued in Docket No. 25-08-05 on December 17, 2025 (the “Final Decision”).
Specifically, Order No. 9 of the 2025 Decision states:
Reference Decision, Dec. 21, 2022, Docket No. 22-08-05, Order No. 15, p. 41: No
later than August 1, 2024, and annually thereafter until the ESS Program stops
accepting new enrollments, CGB shall file all project cancellation data for the
Authority’s review in the relevant ESS annual review docket. The cancellation data
must show which tranche the canceled projects were selected for, as well as the
reasons behind the project cancellations, if known by the Program Administrators.
The Green Bank hereby submits Docket No. 25-08-05 Order 9 Cancellations Attachment 1 hereto
in compliance with Order No. 9 of the Final Decision. Attachment 1 contains the requested
cancellation data for projects that have been cancelled out of the Energy Storage Solutions
program. This data includes all the requested Tranche information along with any known
cancellation reason. Table 1 below summarizes the reasons for Commercial and Industrial (C&I)
cancellations and Table 2 summarizes the reasons for residential cancellations.
Table 1: Summary of ESS C&I Cancellation Reasons
Number of
Projects
Total System Energy
Capacity (MWh)
Additional work required
Customer is not proceeding with storage
Customer is proceeding with another vendor
Financial availability
IX feasibility
No longer financially viable
3
13
1
1
9
15
5.6580
46.9640
1.1160
4.8160
45.8600
70.5190
2.059
16.412
0.500
2.408
20.230
26.780
Grand Total
42
174.9330
68.389
Cancellation Categories
Total System Power
(MW)
Table 2: Summary of ESS Residential Cancellation Reasons
Cancellation Categories
Additional work required
Customer is not proceeding with storage
Customer is not proceeding with the
program
Customer is proceeding with another vendor
Duplicate
Equipment not eligible
Incentive amount / availability
IX feasibility
Not indicated
Resubmitted by same contractor
Signed with another contractor in ESS
Grand Total
Number of
Projects
4
12
Total System Energy
Capacity (MWh)
0.0800
0.2677
Total System Power
(MW)
0.026
0.130
5
1
2
3
1
2
0.0924
0.0200
0.0572
0.0740
0.0180
0.0650
0.045
0.008
0.030
0.030
0.009
0.045
5
2
3
40
0.0972
0.0352
0.0507
0.8574
0.050
0.019
0.030
0.422
In total there has been a total of 82 cancellations overall in the Program, and these cancellations
are based on the criteria that the projects received a Reservation of Funds (“ROF”) letter or
Reservation of Capacity (“ROC”) letter and were subsequently cancelled by the customer or
contractor. Of the 82 cancellations, 40 are residential projects and 42 are Commercial and
Industrial (“C&I”).
The largest cancellation category is “Customer is not proceeding with storage,” accounting for 25
of the 82 total cancellations. The next largest categories are “No longer financially viable” with 15
cancellations and “IX feasibility” with 11 cancellations. Seven cancellations require additional
work, which can also relate to interconnection findings. Five cancellations are due to the customer
not proceeding with the program, and five were not indicated. Three cancellations are due to
equipment not being eligible in the Program, five are due to customers signing with another
contractor or vendor in ESS meaning they have another application in the Program, two are
duplicates which are sometimes mistakenly submitted by contractors, two were resubmitted by the
same contractor, one relates to financial availability, and one relates to incentive amount or
availability.
The Green Bank notes that there are derelict applications that are in a status called “Withdrawn”
status. Table 3 below contains a summary of projects in Cancelled, Withdrawn, and Unenrolled
status which will be discussed further below.
Table 3: Summary of ESS Residential Cancellation Reasons
Project Status
C&I
Residential
(blank)
Grand Total
Cancelled
42
40
0
82
Unenrolled
0
9
0
9
Withdrawn
45
392
243
680
Grand Total
87
441
243
771
Projects in Withdrawn status are typically projects that were never officially submitted by the
contractor and/or approved and/or received an ROF letter. The Green Bank does not consider these
“cancelled” in the context of this inquiry, though they are categorized by the Green Bank as being
in this status for the following reasons: the applications are contractor test applications, old
applications created but not submitted prior to incentive step changes, or applications abandoned
by the contractor and a new application was opened. The Green Bank created the Withdrawn
status, to categorize such projects separately from legitimate cancellations and included them in
Attachment 1. There are 771 Withdrawn applications in part because there was a residential step
change as well as an incentive structure change last year.
Another status that was included in Attachment 1 is called, “Unenrolled”. Unenrolled projects
went through the completion stages of the Program and then cancelled their participation in the
Program. There are 9 Unenrolled projects, and some unenrolled reasons relate to changing
equipment, equipment issues, or being unenrolled by the DERMS.
The Green Bank hereby certifies service of this filing upon all parties and interveners of record
in this proceeding.
Respectfully submitted,
CONNECTICUT GREEN BANK
By: Sergio Carrillo
Sergio Carrillo
Managing Director, Incentive Programs
Connecticut Green Bank
Phone: [phone removed]
[email removed]
cc: Service List
Attachment