Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority.

Utility Dockets and FilingsConnecticut Public Utilities Regulatory Authority

compliance - CT Green Bank

Compliance Filing, Order No. 9

Filed by Connecticut Green Bank

Part of

Annual Energy Storage Solutions Program Review- Year 6

Type of filing
Compliance filing (Compliance Filing, Order No. 9)
Date filed
August 3, 2026
Filed by
Connecticut Green Bank
Files
2

As listed on the current system

Compliance Filings, 08/03/2026 [26-08-05] Order No.9 / Connecticut Green Bank / compliance - CT Green Bank

This filing on the current system (opens in a new tab)

Files2

July 28, 2026 Via Electronic Filing Mr. Jeffrey R. Gaudiosi, Esquire Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 25-08-05, Annual Energy Storage Solutions Program Review – Year 5 Compliance with Order No. 9 of the Final Decision in Docket No. 25-08-05 Docket No. 26-08-05, Annual Energy Storage Solutions Program Review – Year 6 Compliance with Order No. 9 of the Final Decision in Docket No. 25-08-05 Dear Mr. Gaudiosi: The Connecticut Green Bank (“Green Bank”) respectfully submits to the Public Utilities Regulatory Authority (“PURA” or the “Authority”) their compliance with Order No. 9 of the Final Decision issued in Docket No. 25-08-05 on December 17, 2025 (the “Final Decision”). Specifically, Order No. 9 of the 2025 Decision states: Reference Decision, Dec. 21, 2022, Docket No. 22-08-05, Order No. 15, p. 41: No later than August 1, 2024, and annually thereafter until the ESS Program stops accepting new enrollments, CGB shall file all project cancellation data for the Authority’s review in the relevant ESS annual review docket. The cancellation data must show which tranche the canceled projects were selected for, as well as the reasons behind the project cancellations, if known by the Program Administrators. The Green Bank hereby submits Docket No. 25-08-05 Order 9 Cancellations Attachment 1 hereto in compliance with Order No. 9 of the Final Decision. Attachment 1 contains the requested cancellation data for projects that have been cancelled out of the Energy Storage Solutions program. This data includes all the requested Tranche information along with any known cancellation reason. Table 1 below summarizes the reasons for Commercial and Industrial (C&I) cancellations and Table 2 summarizes the reasons for residential cancellations. Table 1: Summary of ESS C&I Cancellation Reasons Number of Projects Total System Energy Capacity (MWh) Additional work required Customer is not proceeding with storage Customer is proceeding with another vendor Financial availability IX feasibility No longer financially viable 3 13 1 1 9 15 5.6580 46.9640 1.1160 4.8160 45.8600 70.5190 2.059 16.412 0.500 2.408 20.230 26.780 Grand Total 42 174.9330 68.389 Cancellation Categories Total System Power (MW) Table 2: Summary of ESS Residential Cancellation Reasons Cancellation Categories Additional work required Customer is not proceeding with storage Customer is not proceeding with the program Customer is proceeding with another vendor Duplicate Equipment not eligible Incentive amount / availability IX feasibility Not indicated Resubmitted by same contractor Signed with another contractor in ESS Grand Total Number of Projects 4 12 Total System Energy Capacity (MWh) 0.0800 0.2677 Total System Power (MW) 0.026 0.130 5 1 2 3 1 2 0.0924 0.0200 0.0572 0.0740 0.0180 0.0650 0.045 0.008 0.030 0.030 0.009 0.045 5 2 3 40 0.0972 0.0352 0.0507 0.8574 0.050 0.019 0.030 0.422 In total there has been a total of 82 cancellations overall in the Program, and these cancellations are based on the criteria that the projects received a Reservation of Funds (“ROF”) letter or Reservation of Capacity (“ROC”) letter and were subsequently cancelled by the customer or contractor. Of the 82 cancellations, 40 are residential projects and 42 are Commercial and Industrial (“C&I”). The largest cancellation category is “Customer is not proceeding with storage,” accounting for 25 of the 82 total cancellations. The next largest categories are “No longer financially viable” with 15 cancellations and “IX feasibility” with 11 cancellations. Seven cancellations require additional work, which can also relate to interconnection findings. Five cancellations are due to the customer not proceeding with the program, and five were not indicated. Three cancellations are due to equipment not being eligible in the Program, five are due to customers signing with another contractor or vendor in ESS meaning they have another application in the Program, two are duplicates which are sometimes mistakenly submitted by contractors, two were resubmitted by the same contractor, one relates to financial availability, and one relates to incentive amount or availability. The Green Bank notes that there are derelict applications that are in a status called “Withdrawn” status. Table 3 below contains a summary of projects in Cancelled, Withdrawn, and Unenrolled status which will be discussed further below. Table 3: Summary of ESS Residential Cancellation Reasons Project Status C&I Residential (blank) Grand Total Cancelled 42 40 0 82 Unenrolled 0 9 0 9 Withdrawn 45 392 243 680 Grand Total 87 441 243 771 Projects in Withdrawn status are typically projects that were never officially submitted by the contractor and/or approved and/or received an ROF letter. The Green Bank does not consider these “cancelled” in the context of this inquiry, though they are categorized by the Green Bank as being in this status for the following reasons: the applications are contractor test applications, old applications created but not submitted prior to incentive step changes, or applications abandoned by the contractor and a new application was opened. The Green Bank created the Withdrawn status, to categorize such projects separately from legitimate cancellations and included them in Attachment 1. There are 771 Withdrawn applications in part because there was a residential step change as well as an incentive structure change last year. Another status that was included in Attachment 1 is called, “Unenrolled”. Unenrolled projects went through the completion stages of the Program and then cancelled their participation in the Program. There are 9 Unenrolled projects, and some unenrolled reasons relate to changing equipment, equipment issues, or being unenrolled by the DERMS. The Green Bank hereby certifies service of this filing upon all parties and interveners of record in this proceeding. Respectfully submitted, CONNECTICUT GREEN BANK By: Sergio Carrillo Sergio Carrillo Managing Director, Incentive Programs Connecticut Green Bank Phone: [phone removed] [email removed] cc: Service List Attachment