Presentation for 9/3/2026 Tech Meeting
Filed by ev.energy
- Type of filing
- Correspondence
- Date filed
- August 31, 2026
- Filed by
- ev.energy
- Files
- 1
As listed on the current system
Corres. 08/31/2026 [26-08-05] (ev.energy) - Presentation for 9/3/2026 Tech Meeting
Files1
ev-energy presentation 9-3-2026.pdf
PDF · 194 KB · 8 pagesText searchable
Download ev-energy presentation 9-3-2026.pdfRead the text of ev-energy presentation 9-3-2026.pdf
WHO WE ARE · DOCKET NO. 26-08-05
AN INDEPENDENT DER AGGREGATOR, OPERATING
IN CONNECTICUT TODAY
Eight-plus years orchestrating distributed energy resources across utility, Community Choice
Aggregation and retail partnerships in the US and internationally. Managed charging provider for
Avangrid and Eversource in Connecticut.
300,000+
DERs orchestrated worldwide.
55+
Utility and retailer deployments.
Ranked #1 EV VPP specialist by Wood Mackenzie, 2024 and 2025.
2,641 MW
Enrolled nameplate capacity; 75 GWh
shifted globally.
~10,000
EVs enrolled in Connecticut, charging
95% off peak.
TWO PROGRAMS. ONE SYSTEM.
TWO COMPLIMENTARY GOALS.
MANAGED CHARGING PROGRAM
ESS PROGRAM
Shifts the charge off peak.
Pays for the discharge on peak.
Different adopted goals, not competing ones. One bidirectional vehicle can serve both, so the state should strive
enable both in a timely fashion rather than choosing one.
~3,000
Bidirectional EVs registered in Connecticut today.
ENCOURAGE
RESIDENTIAL
PARTICIPATION
12+
Passenger models capable of discharge.
95%
Of the time, passenger vehicles sit parked.
EV DRIVERS ARE READY TO ENROLL
WILLING TO ENROLL IN A
BIDIRECTIONAL CHARGING
PROGRAM
WILLING TO PAY MORE FOR
BIDIRECTIONAL CAPABILITY IN AN
EV
53%
LIKELY
Very likely · 27%
Likely · 26%
Neutral · 28%
69%
LIKELY
Very likely · 35%
Likely · 34%
Neutral · 20%
Unlikely · 14%
Unlikely · 8%
Very unlikely · 5%
Very unlikely · 3%
Plug In America survey, March 2025. N = 321.
95%
Require ESS-enrolled bidirectional EVs to run a software
charging solution that keeps them off the peak.
The rebound concern is a software problem, already solved.
Off-peak charging across nearly 10,000 EVs enrolled in
Connecticut today.
PROVEN ELSEWHERE
We already manage co-participation in the Massachusetts Clean
Peak Standard alongside active managed charging, and enroll
customers in two programs through a single flow.
DUAL PARTICIPATION NEARLY DOUBLES GRID
VALUE
$575
Per EV per year, active managed charging alone.
arrow_forward
ev.energy research with The Brattle Group. Same vehicles, the full stack of grid benefits.
$1,320
Per EV per year, with bidirectional export added.
THE STACK IS WHAT CLEARS THE INCREMENTAL
COST
MANAGED CHARGING ONLY
ESS EXPORT ONLY
$300
$3,000
/yr
Advanced tier, per port. Nowhere near a
$10,000–$15,000 incremental
bidirectional EVSE cost.
STACKED
/yr
$300/kW-yr at full seasonal contribution,
years 1–10. No upfront incentive: paid
only on average kW delivered during
events, not on nameplate.
Performance compensation only pays when the port delivers. Stacking
does not raise the ratepayer cost per kW; it raises the probability that
the kW shows up.
$3,300
/yr
Plus the thing the money cannot buy: a
platform that keeps state of charge high
enough for the event and holds the
recharge off peak.
Rates per the April 1, 2026 ESS incentive structure. Incremental cost
range per the report: approximately $5,000–$6,000 per light-duty port,
$10,000–$15,000 or more for a 30–40 kW commercial charger.
THE ASK
OPEN A V2G PROCEEDING
One venue to review these issues holistically, with vehicle-to-home in scope. V2H supports
customer resilience and is compensated by neither program today.
KEEP REQUIREMENTS, ADD A PATHWAY
IF RESIDENTIAL WAITS, COMMIT TO A TIMELINE
DERMS integration, telemetry, UL certification and ISO 15118-20
are workable as proposed. Let them update as standards evolve,
without filing new programs.
Adopt official program year goals and require quarterly status
filings on removing the remaining barriers. Certainty is what lets
the market invest.