STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
June 16, 2026
In reply, please refer to:
Docket No. 26-08-05
Christie Prescott
Joel Kopylec
UIL Holdings Corporation
180 Marsh Hill Road
Orange, CT 06477
Bryan Garcia
President & CEO
Connecticut Green Bank
75 Charter Oak Avenue
Hartford, CT 06106
Vincent Pace, Esq.
Assistant General Counsel
Eversource Energy Service Company
107 Seldon Street
Berlin, CT 06037
Re: Docket No. 26-08-05 – Annual Energy Storage Solutions Program Review- Year 6
Dear Ms. Prescott and Messers Garcia, Kopylec, and Pace:
Enclosed are interrogatories numbered CAE-1 through CAE-8. Interrogatories
numbered CAE-1 through CAE-3 are directed individually to The Connecticut Light and
Power Company d/b/a Eversource Energy (Eversource), The United Illuminating
Company (UI; collectively, the EDCs), and The Connecticut Green Bank (CGB;
collectively with the EDCs, the Program Administrators). Interrogatories numbered
CAE-4 through CAE-7 are directed individually to CGB. Interrogatory numbered CAE-8
is directed individually to Eversource and UI.
The responses to these questions have been deemed necessary by the Public
Utilities Regulatory Authority (Authority) in connection with the above-referenced docket
and will become a part of the record in this proceeding. Please note that persons
responsible for responses must be available for cross-examination during a hearing, if
held, and must attest to the truth and accuracy of their responses.
Please submit the responses to the Authority’s Executive Secretary no later than
July 9, 2026, at 4:00 p.m. The Authority encourages the submission of responses as
soon as they are available rather than delaying until all answers are completed. Please
list each question and answer on the same sheet of paper using a separate sheet
for each interrogatory number, and sequentially number the pages of each
response (e.g., p. 1 of 5, etc.). At the top of each page, clearly identify the Docket
Number, the interrogatory number (including the prefix), the name of the company
and the person responsible for the response, and the date of submission.
Similarly, each Late Filed Exhibit that may be submitted after hearing in this
docket shall be sequentially numbered and identified with the Docket Number, Late
Filed Exhibit Number, page number, the name of the company and the person
responsible for the exhibit, and the date of submission.
If a response to any of the requested information has already been filed in response
to another Parties’ interrogatory(ies) in this proceeding, please reference the interrogatory
which provides the information. It is the respondent’s responsibility to ensure that any
such information is on file with the Executive Secretary of the Authority.ELECTRONIC
SUBMISSION OF FILINGS
IMPORTANT NOTE: The Authority has indefinitely suspended the paper
copy filing requirement. Anyone filing material with the Authority should file only
an electronic copy through the PURA Web Filing System. Please refer to the
Electronic Filing webpage for more information, including on confidential
materials: Make An Electronic Filing
CONFIDENTIAL DOCUMENTS
No confidential material may be filed publicly through the web filing system.
Confidential material can be filed electronically by emailing the material to
[email removed] with a subject line labeled in all capital letters “CONFIDENTIAL
MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic
confidential information shall also contain a header “CONFIDENTIAL – NOT FOR
PUBLIC DISCLOSURE.” The motion for a protective order shall be filed electronically.
The Authority operates with the strong presumption that all documents filed with it
are public records subject to the right of public inspection and copying in accordance with
the Connecticut Freedom of Information Act, Conn. Gen. Stat. §1-200 et. seq. In those
exceptional circumstances where a participant believes that information it intends to file
is confidential under law, it may file a Motion for a Protective Order requesting an
exemption from public disclosure. The Motion must provide specific legal arguments with
reference to state or federal law describing with supporting facts why the information
should be kept confidential. A certified affidavit supplied by a competent witness in
support of the Motion must be appended to the Motion. The Authority will rule on the
Motion forthwith, and it will give further direction as necessary.
The current service list for this docket is available on the Authority's website
located at http://www.dpuc.state.ct.us/DPUCPublicList.NSF.
By the Direction of the Authority,
PUBLIC UTILITIES REGULATORY AUTHORITY
Enclosure
cc:
Service List
Jeffrey R. Gaudiosi, Esq.
Executive Secretary
Interrogatories CAE-1 through CAE-3 are directed individually to The Connecticut Light
and Power Company d/b/a Eversource Energy (Eversource), The United Illuminating
Company (UI; collectively, the EDCs), and The Connecticut Green Bank (CGB;
collectively with the EDCs, the Program Administrators).
CAE-1
Decision, Dec. 17, 2025, Annual Energy Storage Solutions Program Review –
Year 5, (Year 5 Decision), pp. 20-25.
a. Comment on whether the adoption of Construct 5 has adversely affected
Energy Storage Solutions (ESS) Program enrollment or resulted in any
unforeseen implementation challenges.
b. If the response to part (a) is yes, provide recommended solutions to address
the identified issue(s). Any such recommendations must consider cost
impacts to non-participating ratepayers.
CAE-2
Provide a recommendation on whether to include average and total annual
performance incentive payments in the ESS Program data dashboard 1 to
enhance cost transparency.
CAE-3
Provide a recommendation on whether the actual summer monthly and/or annual
peak hour should be flagged on the Dispatch Event Metrics tab of the ESS
Program data dashboard.
Interrogatories CAE-4 through CAE-7 are directed individually to CGB.
CAE-4
Year 5 Decision, pp. 25-29. Provide an update on the status of CGB Proposals 1
and 2, including whether CGB still intends to proceed with one or both proposals
and, if so, the anticipated implementation timeline for each.
CAE-5
Decision, Nov. 29, 2023, Annual Energy Storage Solutions Program Review –
Year 3, (Year 3 Decision), p. 21.
a. For calendar year 2025, provide the number and percentage of ESS projects
enrolling during that year that completed CGB inspections, disaggregated by
commercial and residential projects.
b. Confirm whether these projects affirmatively opted into the inspection
process, as required by the Year 3 Decision, rather than being automatically
assigned to a CGB inspector.
c. Provide the total cost of all CGB inspections conducted in calendar year
2025.
1 Available at: https://energystoragect.com/ess-performance-report/.
CAE-6
Motion No. 14 Ruling, Jan. 2, 2025, Docket No. 25-08-05, pp. 2-3. Provide an
update on CGB’s efforts to re-enroll SunPower batteries into the EDCs’
distributed energy resource management system (DERMS) platform using
Codibly. If these efforts were unsuccessful, provide a recommendation as to
whether alternative approaches should be pursued to facilitate re-enrollment of
SunPower batteries into the EDCs’ DERMS platform, and identify any such
alternatives.
CAE-7
Comment on whether any EDC DERMS data received by CGB contains material
errors that affect data integrity or usability. If so, describe the processes and
methodologies CGB employs to identify, clean, and validate such data.
Interrogatory CAE-8 is directed individually to Eversource and UI.
CAE-8
Comment on the quality control measures employed by the EDCs to ensure the
accuracy of active dispatch data used to calculate performance incentive
payments. In particular, address how the EDCs validate such data in instances
where DERMS data may contain material errors that require subsequent
cleaning by EDC staff or CGB.